Bids Are Invited For Item No. 01 - Manning And Operation Of 33Kv Main Receiving Station In Threeshifts ( Round The Clock ) Of 08 Hours In A Day For Seven Days In A Week With One Electrician ( Skilled ) And One Helper ( Semi-Skilled ) To Operate And Comprehensive Maintenance Ofthe Following Equipment Installed And Also To Assist Mes Personnel To Carryout Repair / Maintenance Of 11Kv Ht Buscoupler With God System And Outgoing Feeders Within Power House Complex, Step Down Transformer 5000Kva 33Kv / 11Kv Ac 50Hz -02 Nos. Including Connecting Equipment Such As Isolators With Earth Switch - 1No, Isolator Without Earth Switch - 2Nos, Ct And Pts - 2 Sets, Vcb Outdoor Type -2 Nos, Vcbcontrol Panel - 3Nos And Associated Control Equipment / Wiring All As Existing At Site. Detail Specifications Of Equipment Are As Per Existing Provision :-Note :- ( A ) The Helper Also Should Have The Workexperience In Ht Sub Station. ( B ) The Contractor Should Provide Ht Safety Equipment And Tools Suitable For Ht Installation ( C ) Contractor Shall Be Fully Responsible For The Staffdeployed And Maintain Safety Precaution. ( D ) All Other Notes Indicated In Sch A Shall Also Be Equaly Applicable To Thisitem. , Item No. 02 - Manning And Operation For Attending Electrical Breakdown Of Ht / Lt Overheads Lines, Under Ground Cables , Various Substation In Three Shifts Per Day ( Round The Clock ) For 08 Hrs Each Seven Day A Week, Comprising Of Checking, Testing And Taking Out, Replacing Of Off Sizes Insulators, Fuses, Acsr, Restring Of Conductors, Mcb, Mccb, Switch Fuse Disconnector Etc. All As Required At Site With One Electrician ( Skilled ) And Two Helper ( Semi-Skilled ) Per Shift Complete All As Directed Note:- ( I ) Contractor Shall Provide The Requiste To And Their Operators For Attending Complaints At His Own End ( Ii ) Material Required In Replacement Of Defective / Fixtures Etc Shall Be Measured And Paid For Separately As Supply Only As Indicated Here-In- After ( Iii ) Department / Mes Shall Issue The Fittings / Fixtures / Material Free For Fixing For Attending The Complaints Where Material To Be Replaced ( Iv ) Material Equipment Through Retrived During Repair / Replacement Shall Be The Contractor Property Which Are Considered In Schedule Of Credit But Than Item Catered In Sch Of Credit, Such Old Material Shall Be Returned By The Contractor In The Age E / M Store Yard Being Govt Property. ( V ) After Attending The Particular Complaint Contractor Man Power Shall Report To Je Concern To Submit The Compliance Report Regarding Satisfactory Attending The Complaints. , Item No. 03 - Outsourcing For Attending Day To Day Maintenance Of Internal Electric Breakdown As Light , Fan, Switches, Sockets Points Etc. At Smq , Omq And Tech Area Of Air Force Stn In One Shift For 08 Hrs Each For 06 Days In A Week With Threeelectrician And Three Unskilledper Shiftscomprising Of Checking, Testing, Taking Out And Replaceing Of Switches, Sockets, Light Fittings, Starter, Choke, Lamp Holder, Mcbs, Isolator, Dbs & Damaged Wiring Etc. Andmaking Serviceable All As Directed .Note:- ( I ) Fittings And Fixtures Shall Be Measured And Paid For Separately ( Ii ) Electric Fittings / Fixtures Shall Also Be Issued By The Department For Replacement Of Diffectives / Fittings Free For Fixing. ( Iii ) Any Type Of Complaints Related To Internal Electrification Shall Be Attended Of Againsted Of This Item ( Iv ) Immediately On Report Of Complaint, Trade Man And Helper Shall Proceed To Attend The Complaints After Attending The Complaints, User Completion Report Shall Be Submitted To Je Concern. ( V ) Old Material Retrived During Requirment / Rectifcation Shall Be Deposted By The Contractor In The Yard Of Age E / M As The Old Material Shall Be The Govt. Property. , Item No. 04 - Epfwherever Applicable ( Employer Contribution As Per Epf Act 1952, As Ammended From Time To Time ) Current Contribution Is 13 % , Item No. 05 - Esi ( Employer Contribution As Per Esi Act 1948, As Ammended From Time To Time ) Current Contribution Is 3.25 % , Item No. 06 - Contribution Towadrs Bonus ( As Per Bonus Act 1965, As Ammended From Time To Time ) Current Contribution Is 8.33 % Of Gross Salary , Item No. 07 - Overhead And Profit , Item No. 08 - Labour Welfare Cess ( Min 1% ) On Sum Of Basic, Epf, Esi , Bonus And Profit. , Item No. 09 - M&L As Inexpulsion Fuse Single Pole Single Pole 11000 Volts Upto 25 Amp Complete All As Specified And As Directed Incl Dismantling Old Unsv One Complete All As Specified And Directed. Note Contractor Shell Be Taken Proper 11 Kv Shut Down And Do The Work In Presence Of 11 Kv Licecnse Holder Electrician. , Item No. 10 - M&L As Inexpulsion Fuse Single Pole Single Pole 11000 Volts Above 25 And Upto 50 Amp Complete All As Specified And As Directed Incl Dismantling Old Unsv One Complete All As Specified And Directed. Note Contractor Shell Be Taken Proper 11 Kv Shut Down And Do The Work In Presence Of 11 Kv Licecnse Holder Electrician. , Item No. 11 - M&L For Servicing / Greasing Of Ht Switch Air Break ( God ) 11 Kv Tp With Replacement Of Corroded Nut Bolts, Acsr Jumpers, Making Alignment Of Operating Mechanism For Proper On / Off Operationof God And Male-Female Contact Including Complete Greasing All As Directed By Engr-In-Charge. Total Quantity : 1