Sales : +91-777 804 8217
| Sl. No. | Item Description |
| 1 | MANUFACTURING AND SUPPLY OF CMS CROSSING 60 Kg. 1 in 8.5 TO RDSO DRG. NO. RT-4967 (latest alteration). |
| 2 | Manufacturing and Supply of CMS Crossing for BG. 60 Kg [UIC] on PSC Sleepers 1 in 8.5 toRDSO Drg. No. T-4967 (latest alteration) and Spn. IRS T-29:2016 for CMS Crossing and drawings complete withC.I. Distance Blocks, Packing Pieces, M.S. Tapered Washers, Check Blocks and Bolts of different sizes aslisted in the drawing excluding other items indicated in the drawing. [N.B. Term- Latest- wherever used will meanthe alteration/amendments up to the actual date of closing of tender]. |
| 3 | Manufacturing and Supply of CMS Crossing for BG. 60 Kg [UIC] on PSC Sleepers 1 in 8.5 toRDSO Drg. No. T-4967 (latest alteration) and Spn. IRS T-29:2016 for CMS Crossing and drawings complete withC.I. Distance Blocks, Packing Pieces, M.S. Tapered Washers, Check Blocks and Bolts of different sizes aslisted in the drawing excluding other items indicated in the drawing. [N.B. Term- Latest- wherever used will meanthe alteration/amendments up to the actual date of closing of tender]. |
| 4 | Manufacturing and Supply of CMS Crossing for BG. 60 Kg [UIC] on PSC Sleepers 1in 8.5 to RDSO Drg. No. T-4967 (latest alteration) and Spn. IRS T-29:2016 for CMS Crossing and drawingscomplete with C.I. Distance Blocks, Packing Pieces, M.S. Tapered Washers, Check Blocks and Bolts of differentsizes as listed in the drawing excluding other items indicated in the drawing. [N.B. Term- Latest- wherever usedwill mean the alteration/amendments up to the actual date of closing of tender].Consignee SSE/P. WAY/DEPOT/ KZJ Andhra Pradesh 100.00 Set4 4967SER Goods (Y) Non Stock --- Yes RDSO RDSO-QA INR Manufacturing and Supply of CMS Crossing for BG. 60 Kg [UIC] on PSC Sleepers 1in 8.5 to RDSO Drg. No. T-4967 (latest alteration) and Spn. IRS T-29:2016 for CMS Crossing and drawingscomplete with C.I. Distance Blocks, Packing Pieces, M.S. Tapered Washers, Check Blocks and Bolts of differentsizes as listed in the drawing excluding other items indicated in the drawing. [N.B. Term- Latest- wherever usedwill mean the alteration/amendments up to the actual date of closing of tender].Consignee SSE/SE(P.W.)/SD/KGP West Bengal 344.00 Set5 4967ER Goods (Y) Non Stock --- Yes RDSO RDSO-QA INR Manufacturing and Supply of CMS Crossing for BG. 60 Kg [UIC] on PSC Sleepers 1in 8.5 to RDSO Drg. No. T-4967 (latest alteration) and Spn. IRS T-29:2016 for CMS Crossing and drawingscomplete with C.I. Distance Blocks, Packing Pieces, M.S. Tapered Washers, Check Blocks and Bolts of differentsizes as listed in the drawing excluding other items indicated in the drawing. [N.B. Term- Latest- wherever usedwill mean the alteration/amendments up to the actual date of closing of tender].Consignee SSE/TD/ASN West Bengal 70.00 Set6 4967SECR Goods (Y) Non Stock --- Yes RDSO RDSO-QA INR Manufacturing and Supply of CMS Crossing for BG. 60 Kg [UIC] on PSC Sleepers 1in 8.5 to RDSO Drg. No. T-4967 (latest alteration)and Spn. IRS T-29:2016 for CMS Crossing and drawingscomplete with C.I. Distance Blocks, Packing Pieces, M.S. Tapered Washers, Check Blocks and Bolts of differentsizes as listed in the drawing excluding other items indicated in the drawing. [N.B. Term- Latest- wherever usedwill mean the alteration/amendments up to the actual date of closing of tender].Consignee SSE/P. WAY/DSD/BSP Madhya Pradesh 411.00 Set7 4967ECR Goods (Y) Non Stock --- Yes RDSO RDSO-QA INR Manufacturing and Supply of CMS Crossing for BG. 60 Kg [UIC] on PSC Sleepers 1in 8.5 to RDSO Drg. No. T-4967 (latest alteration)and Spn. IRS T-29:2016 for CMS Crossing and drawingscomplete with C.I. Distance Blocks, Packing Pieces, M.S. Tapered Washers, Check Blocks and Bolts of differentsizes as listed in the drawing excluding other items indicated in the drawing. [N.B. Term- Latest- wherever usedwill mean the alteration/amendments up to the actual date of closing of tender].Consignee SSE/P. WAY/CTD/ GAYA Bihar 530.00 Set8 4967SR Goods (Y) Non Stock --- Yes RDSO RDSO-QA INR Page 2 of 6 Run Date/Time: 01/09/2021 12:38:59ER HQ-ENGINEERING/EASTERN RLYTENDER DOCUMENTTender No CETPER2021CP02 Closing Date/Time 08/10/2021 14:00 Manufacturing and Supply of CMS Crossing for BG. 60 Kg [UIC] on PSC Sleepers 1in 8.5 to RDSO Drg. No. T-4967 (latest alteration)and Spn. IRS T-29:2016 for CMS Crossing and drawingscomplete with C.I. Distance Blocks, Packing Pieces, M.S. Tapered Washers, Check Blocks and Bolts of differentsizes as listed in the drawing excluding other items indicated in the drawing. [N.B. Term- Latest- wherever usedwill mean the alteration/amendments up to the actual date of closing of tender].Consignee SSE/PWD/GOC Telangana 50.00 Set9 4967ECoR Goods (Y) Non Stock --- Yes RDSO RDSO-QA INR Manufacturing and Supply of CMS Crossing for BG. 60 Kg [UIC] on PSC Sleepers 1in 8.5 to RDSO Drg. No. T-4967 (latest alteration)and Spn. IRS T-29:2016 for CMS Crossing and drawingscomplete with C.I. Distance Blocks, Packing Pieces, M.S. Tapered Washers, Check Blocks and Bolts of differentsizes as listed in the drawing excluding other items indicated in the drawing. [N.B. Term- Latest- wherever usedwill mean the alteration/amendments up to the actual date of closing of tender].Consignee SSE/DSD/CTC Odisha 363.00 Set3. T AND CF.O.RDescriptionDestinationDelivery PeriodDescription Delivery / Completion Rate of SupplyItem - ---- Commencement : Within 3 Months of issue of Supply should beContract, Completion : Within 24 Months completed asmentioned inindividual supplyorders to beissued byConsignee Rly.Item - ---- Commencement : Within 3 Months of issue of Supply should beContract, Completion : Within 24 Months completed asmentioned inindividual supplyorders to beissued byConsignee Rly.Item - ---- Commencement : Within 3 Months of issue of Supply should beContract, Completion : Within 24 Months completed asmentioned inindividual supplyorders to beissued byConsignee Rly.Item - ---- Commencement : Within 3 Months of issue of Supply should beContract, Completion : Within 24 Months completed asmentioned inindividual supplyorders to beissued byConsignee Rly.Page 3 of 6 Run Date/Time: 01/09/2021 12:38:59ER HQ-ENGINEERING/EASTERN RLYTENDER DOCUMENTTender No CETPER2021CP02 Closing Date/Time 08/10/2021 14:00Item - ---- Commencement : Within 3 Months of issue of Supply should beContract, Completion : Within 24 Months completed asmentioned inindividual supplyorders to beissued byConsignee Rly.Item - ---- Commencement : Within 3 Months of issue of Supply should beContract, Completion : Within 24 Months completed asmentioned inindividual supplyorders to beissued byConsignee Rly.Item - ---- Commencement : Within 3 Months of issue of Supply should beContract, Completion : Within 24 Months completed asmentioned inindividual supplyorders to beissued byConsignee Rly.Payment TermsS.No DescriptionPayment Terms1 Payment will be made as per Clause No. 10.0 of Special Conditions of Contract of Tender Document.Statutory Variation ClauseS.No Description1 As per Clause No. 11.0 of General Conditions of Tender for Supply Contract of Tender Document.Option ClauseS.No Description1 As per Clause No. 14.0 of General Conditions of Tender for Supply Contract of Tender Document.Standard Governing ConditionsS.No Description1 IRS Conditions of Contract: The contract shall be governed by latest version (along with all correction slips) ofIRS Conditions of Contract, and all other terms and conditions incorporated in the tender documents.4. ELIGIBILITY CONDITIONSAll documents uploaded and remarks / confirmation entered by the bidders against any eligibility conditionImportant :shall be opened as part of technical bid onlySpecial Eligibility CriteriaS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 As per clause 12.0 of Special Conditions of Contract. Yes Yes Allowed(Optional)5. COMPLIANCE CONDITIONSAll documents uploaded and remarks / confirmation entered by the bidders against any complianceImportant :condition shall be opened as part of technical bid only.Page 4 of 6 Run Date/Time: 01/09/2021 12:38:59ER HQ-ENGINEERING/EASTERN RLYTENDER DOCUMENTTender No CETPER2021CP02 Closing Date/Time 08/10/2021 14:00Check ListS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 Documents to be uploaded along with e-bid as per clause No. 20.0 of No No Not AllowedInstructions to Tenderers for E-Tendereing.Commercial-ComplianceS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 Please enter the percentage of local content in the material being offered. No Yes AllowedPlease enter 0 for fully imported items, and 100 for fully indigenous items. (Optional)The definition and calculation of local content shall be in accordance withthe Make in India policy as incorporated in the tender conditions.2 The Bidder agrees to supply the Tendered Stores at the rates quoted by Yes Yes Allowedthem in accordance with the IRS Conditions of Contract, Special (Optional)Conditions, General Conditions and Other Conditions specified/attachedwith the Tender.General InstructionsS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 All Conditions shall be as per Tender Document. No No Not AllowedSpecial ConditionsS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 The Bidder agrees to supply the Tendered Stores at the rates quoted by No No Not Allowedthem in accordance with the IRS Conditions of Contract, SpecialConditions, General Conditions and Other Conditions specified/attachedwith the Tender.2 Registration of bidders from Land border countries is compulsory in No No Not Allowedaccordance with Model Clause/Certificate as per Annexure-F as perSpecial Conditions of Contract, if applicable.Technical-CompliancesS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 Specification and Drawing: The Manufacture and Supply of CMS Crossing Yes Yes Not Allowedfor BG. 60 Kg [UIC] on PSC Sleepers 1 in 8.5 to RDSO Drg. No. T-4967(latest alteration) and Spn. IRS T-29:2016 for CMS Crossing for CMSCrossing and other Conditions specified in the Special Conditions ofContract.6. DOCUMENTS ATTACHED WITH TENDERS.No. Document Name Document Description1 SPECIALCONDITIONSOFCONTRACT.pdf SPECIAL CONDITIONS OF CONTRACT2 GENERALCONDITIONSOFTENDERFORSUPPLYCONTRACT.pdf GENERAL CONDITIONS OF TENDER3 INSTRUCTIONTOTENDERER_ITT_.pdf INSTRUCTION TO TENDERERS7. RESPONSIVENESSS.No. Description1 No deviation to the unloading condition stipulated in the tender document is permitted.Page 5 of 6 Run Date/Time: 01/09/2021 12:38:59ER HQ-ENGINEERING/EASTERN RLYTENDER DOCUMENTTender No CETPER2021CP02 Closing Date/Time 08/10/2021 14:002 Any Technical or Commercial deviations having financial repercussion are not permitted.3 Tenderers (RDSO Approved Vendors) are not permitted to quote for less than 50% of Consignee wise quantity.4 Validity of Offer: No deviation from the offer validity period stipulated in the tender is permitted.5 Payment Terms: No deviation from the Payment Terms stipulated in the tender is permitted.6 Delivery Period: No deviation from the Delivery Period stipulated in the tender is permitted.7 Price Variation Clause: No deviation from the Price Variation Clause stipulated in the tender is permitted.8 Declaration as per Annexure-E if exemption from EMD/SD is sought.This tender complies with Public Procurement Policy (Make in India) Order 2017, dated 15/06/2017, issued byDepartment of Industrial Promotion and Policy, Ministry of Commerce, circulated vide Railway Board letter no.2015/RS(G)/779/5 dated 03/08/2017 and 27/12/2017 and amendments/ revisions thereof.As a Tender Inviting Authority, the undersigned has ensured that the issue of this tender does not violate provisions ofGFR regarding procurement through GeM.Digitally Signed By Dy.CE/TRACK/II ( PRIYARANJAN KUMAR )Page 6 of 6 Run Date/Time: 01/09/2021 12:38:59 |
| 5 | Manufacturing and Supply of CMS Crossing for BG. 60 Kg [UIC] on PSC Sleepers 1in 8.5 to RDSO Drg. No. T-4967 (latest alteration) and Spn. IRS T-29:2016 for CMS Crossing and drawingscomplete with C.I. Distance Blocks, Packing Pieces, M.S. Tapered Washers, Check Blocks and Bolts of differentsizes as listed in the drawing excluding other items indicated in the drawing. [N.B. Term- Latest- wherever usedwill mean the alteration/amendments up to the actual date of closing of tender]. |
| 6 | Manufacturing and Supply of CMS Crossing for BG. 60 Kg [UIC] on PSC Sleepers 1in 8.5 to RDSO Drg. No. T-4967 (latest alteration) and Spn. IRS T-29:2016 for CMS Crossing and drawingscomplete with C.I. Distance Blocks, Packing Pieces, M.S. Tapered Washers, Check Blocks and Bolts of differentsizes as listed in the drawing excluding other items indicated in the drawing. [N.B. Term- Latest- wherever usedwill mean the alteration/amendments up to the actual date of closing of tender].Consignee SSE/SE(P.W.)/SD/KGP West Bengal 344.00 Set5 4967ER Goods (Y) Non Stock --- Yes RDSO RDSO-QA INR Manufacturing and Supply of CMS Crossing for BG. 60 Kg [UIC] on PSC Sleepers 1in 8.5 to RDSO Drg. No. T-4967 (latest alteration) and Spn. IRS T-29:2016 for CMS Crossing and drawingscomplete with C.I. Distance Blocks, Packing Pieces, M.S. Tapered Washers, Check Blocks and Bolts of differentsizes as listed in the drawing excluding other items indicated in the drawing. [N.B. Term- Latest- wherever usedwill mean the alteration/amendments up to the actual date of closing of tender].Consignee SSE/TD/ASN West Bengal 70.00 Set6 4967SECR Goods (Y) Non Stock --- Yes RDSO RDSO-QA INR Manufacturing and Supply of CMS Crossing for BG. 60 Kg [UIC] on PSC Sleepers 1in 8.5 to RDSO Drg. No. T-4967 (latest alteration)and Spn. IRS T-29:2016 for CMS Crossing and drawingscomplete with C.I. Distance Blocks, Packing Pieces, M.S. Tapered Washers, Check Blocks and Bolts of differentsizes as listed in the drawing excluding other items indicated in the drawing. [N.B. Term- Latest- wherever usedwill mean the alteration/amendments up to the actual date of closing of tender].Consignee SSE/P. WAY/DSD/BSP Madhya Pradesh 411.00 Set7 4967ECR Goods (Y) Non Stock --- Yes RDSO RDSO-QA INR Manufacturing and Supply of CMS Crossing for BG. 60 Kg [UIC] on PSC Sleepers 1in 8.5 to RDSO Drg. No. T-4967 (latest alteration)and Spn. IRS T-29:2016 for CMS Crossing and drawingscomplete with C.I. Distance Blocks, Packing Pieces, M.S. Tapered Washers, Check Blocks and Bolts of differentsizes as listed in the drawing excluding other items indicated in the drawing. [N.B. Term- Latest- wherever usedwill mean the alteration/amendments up to the actual date of closing of tender].Consignee SSE/P. WAY/CTD/ GAYA Bihar 530.00 Set8 4967SR Goods (Y) Non Stock --- Yes RDSO RDSO-QA INR Page 2 of 6 Run Date/Time: 01/09/2021 12:38:59ER HQ-ENGINEERING/EASTERN RLYTENDER DOCUMENTTender No CETPER2021CP02 Closing Date/Time 08/10/2021 14:00 Manufacturing and Supply of CMS Crossing for BG. 60 Kg [UIC] on PSC Sleepers 1in 8.5 to RDSO Drg. No. T-4967 (latest alteration)and Spn. IRS T-29:2016 for CMS Crossing and drawingscomplete with C.I. Distance Blocks, Packing Pieces, M.S. Tapered Washers, Check Blocks and Bolts of differentsizes as listed in the drawing excluding other items indicated in the drawing. [N.B. Term- Latest- wherever usedwill mean the alteration/amendments up to the actual date of closing of tender].Consignee SSE/PWD/GOC Telangana 50.00 Set9 4967ECoR Goods (Y) Non Stock --- Yes RDSO RDSO-QA INR Manufacturing and Supply of CMS Crossing for BG. 60 Kg [UIC] on PSC Sleepers 1in 8.5 to RDSO Drg. No. T-4967 (latest alteration)and Spn. IRS T-29:2016 for CMS Crossing and drawingscomplete with C.I. Distance Blocks, Packing Pieces, M.S. Tapered Washers, Check Blocks and Bolts of differentsizes as listed in the drawing excluding other items indicated in the drawing. [N.B. Term- Latest- wherever usedwill mean the alteration/amendments up to the actual date of closing of tender].Consignee SSE/DSD/CTC Odisha 363.00 Set3. T AND CF.O.RDescriptionDestinationDelivery PeriodDescription Delivery / Completion Rate of SupplyItem - ---- Commencement : Within 3 Months of issue of Supply should beContract, Completion : Within 24 Months completed asmentioned inindividual supplyorders to beissued byConsignee Rly.Item - ---- Commencement : Within 3 Months of issue of Supply should beContract, Completion : Within 24 Months completed asmentioned inindividual supplyorders to beissued byConsignee Rly.Item - ---- Commencement : Within 3 Months of issue of Supply should beContract, Completion : Within 24 Months completed asmentioned inindividual supplyorders to beissued byConsignee Rly.Item - ---- Commencement : Within 3 Months of issue of Supply should beContract, Completion : Within 24 Months completed asmentioned inindividual supplyorders to beissued byConsignee Rly.Page 3 of 6 Run Date/Time: 01/09/2021 12:38:59ER HQ-ENGINEERING/EASTERN RLYTENDER DOCUMENTTender No CETPER2021CP02 Closing Date/Time 08/10/2021 14:00Item - ---- Commencement : Within 3 Months of issue of Supply should beContract, Completion : Within 24 Months completed asmentioned inindividual supplyorders to beissued byConsignee Rly.Item - ---- Commencement : Within 3 Months of issue of Supply should beContract, Completion : Within 24 Months completed asmentioned inindividual supplyorders to beissued byConsignee Rly.Item - ---- Commencement : Within 3 Months of issue of Supply should beContract, Completion : Within 24 Months completed asmentioned inindividual supplyorders to beissued byConsignee Rly.Payment TermsS.No DescriptionPayment Terms1 Payment will be made as per Clause No. 10.0 of Special Conditions of Contract of Tender Document.Statutory Variation ClauseS.No Description1 As per Clause No. 11.0 of General Conditions of Tender for Supply Contract of Tender Document.Option ClauseS.No Description1 As per Clause No. 14.0 of General Conditions of Tender for Supply Contract of Tender Document.Standard Governing ConditionsS.No Description1 IRS Conditions of Contract: The contract shall be governed by latest version (along with all correction slips) ofIRS Conditions of Contract, and all other terms and conditions incorporated in the tender documents.4. ELIGIBILITY CONDITIONSAll documents uploaded and remarks / confirmation entered by the bidders against any eligibility conditionImportant :shall be opened as part of technical bid onlySpecial Eligibility CriteriaS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 As per clause 12.0 of Special Conditions of Contract. Yes Yes Allowed(Optional)5. COMPLIANCE CONDITIONSAll documents uploaded and remarks / confirmation entered by the bidders against any complianceImportant :condition shall be opened as part of technical bid only.Page 4 of 6 Run Date/Time: 01/09/2021 12:38:59ER HQ-ENGINEERING/EASTERN RLYTENDER DOCUMENTTender No CETPER2021CP02 Closing Date/Time 08/10/2021 14:00Check ListS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 Documents to be uploaded along with e-bid as per clause No. 20.0 of No No Not AllowedInstructions to Tenderers for E-Tendereing.Commercial-ComplianceS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 Please enter the percentage of local content in the material being offered. No Yes AllowedPlease enter 0 for fully imported items, and 100 for fully indigenous items. (Optional)The definition and calculation of local content shall be in accordance withthe Make in India policy as incorporated in the tender conditions.2 The Bidder agrees to supply the Tendered Stores at the rates quoted by Yes Yes Allowedthem in accordance with the IRS Conditions of Contract, Special (Optional)Conditions, General Conditions and Other Conditions specified/attachedwith the Tender.General InstructionsS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 All Conditions shall be as per Tender Document. No No Not AllowedSpecial ConditionsS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 The Bidder agrees to supply the Tendered Stores at the rates quoted by No No Not Allowedthem in accordance with the IRS Conditions of Contract, SpecialConditions, General Conditions and Other Conditions specified/attachedwith the Tender.2 Registration of bidders from Land border countries is compulsory in No No Not Allowedaccordance with Model Clause/Certificate as per Annexure-F as perSpecial Conditions of Contract, if applicable.Technical-CompliancesS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 Specification and Drawing: The Manufacture and Supply of CMS Crossing Yes Yes Not Allowedfor BG. 60 Kg [UIC] on PSC Sleepers 1 in 8.5 to RDSO Drg. No. T-4967(latest alteration) and Spn. IRS T-29:2016 for CMS Crossing for CMSCrossing and other Conditions specified in the Special Conditions ofContract.6. DOCUMENTS ATTACHED WITH TENDERS.No. Document Name Document Description1 SPECIALCONDITIONSOFCONTRACT.pdf SPECIAL CONDITIONS OF CONTRACT2 GENERALCONDITIONSOFTENDERFORSUPPLYCONTRACT.pdf GENERAL CONDITIONS OF TENDER3 INSTRUCTIONTOTENDERER_ITT_.pdf INSTRUCTION TO TENDERERS7. RESPONSIVENESSS.No. Description1 No deviation to the unloading condition stipulated in the tender document is permitted.Page 5 of 6 Run Date/Time: 01/09/2021 12:38:59ER HQ-ENGINEERING/EASTERN RLYTENDER DOCUMENTTender No CETPER2021CP02 Closing Date/Time 08/10/2021 14:002 Any Technical or Commercial deviations having financial repercussion are not permitted.3 Tenderers (RDSO Approved Vendors) are not permitted to quote for less than 50% of Consignee wise quantity.4 Validity of Offer: No deviation from the offer validity period stipulated in the tender is permitted.5 Payment Terms: No deviation from the Payment Terms stipulated in the tender is permitted.6 Delivery Period: No deviation from the Delivery Period stipulated in the tender is permitted.7 Price Variation Clause: No deviation from the Price Variation Clause stipulated in the tender is permitted.8 Declaration as per Annexure-E if exemption from EMD/SD is sought.This tender complies with Public Procurement Policy (Make in India) Order 2017, dated 15/06/2017, issued byDepartment of Industrial Promotion and Policy, Ministry of Commerce, circulated vide Railway Board letter no.2015/RS(G)/779/5 dated 03/08/2017 and 27/12/2017 and amendments/ revisions thereof.As a Tender Inviting Authority, the undersigned has ensured that the issue of this tender does not violate provisions ofGFR regarding procurement through GeM.Digitally Signed By Dy.CE/TRACK/II ( PRIYARANJAN KUMAR )Page 6 of 6 Run Date/Time: 01/09/2021 12:38:59 |
| 7 | Manufacturing and Supply of CMS Crossing for BG. 60 Kg [UIC] on PSC Sleepers 1in 8.5 to RDSO Drg. No. T-4967 (latest alteration) and Spn. IRS T-29:2016 for CMS Crossing and drawingscomplete with C.I. Distance Blocks, Packing Pieces, M.S. Tapered Washers, Check Blocks and Bolts of differentsizes as listed in the drawing excluding other items indicated in the drawing. [N.B. Term- Latest- wherever usedwill mean the alteration/amendments up to the actual date of closing of tender]. |
| 8 | Manufacturing and Supply of CMS Crossing for BG. 60 Kg [UIC] on PSC Sleepers 1in 8.5 to RDSO Drg. No. T-4967 (latest alteration) and Spn. IRS T-29:2016 for CMS Crossing and drawingscomplete with C.I. Distance Blocks, Packing Pieces, M.S. Tapered Washers, Check Blocks and Bolts of differentsizes as listed in the drawing excluding other items indicated in the drawing. [N.B. Term- Latest- wherever usedwill mean the alteration/amendments up to the actual date of closing of tender].Consignee SSE/TD/ASN West Bengal 70.00 Set6 4967SECR Goods (Y) Non Stock --- Yes RDSO RDSO-QA INR Manufacturing and Supply of CMS Crossing for BG. 60 Kg [UIC] on PSC Sleepers 1in 8.5 to RDSO Drg. No. T-4967 (latest alteration)and Spn. IRS T-29:2016 for CMS Crossing and drawingscomplete with C.I. Distance Blocks, Packing Pieces, M.S. Tapered Washers, Check Blocks and Bolts of differentsizes as listed in the drawing excluding other items indicated in the drawing. [N.B. Term- Latest- wherever usedwill mean the alteration/amendments up to the actual date of closing of tender].Consignee SSE/P. WAY/DSD/BSP Madhya Pradesh 411.00 Set7 4967ECR Goods (Y) Non Stock --- Yes RDSO RDSO-QA INR Manufacturing and Supply of CMS Crossing for BG. 60 Kg [UIC] on PSC Sleepers 1in 8.5 to RDSO Drg. No. T-4967 (latest alteration)and Spn. IRS T-29:2016 for CMS Crossing and drawingscomplete with C.I. Distance Blocks, Packing Pieces, M.S. Tapered Washers, Check Blocks and Bolts of differentsizes as listed in the drawing excluding other items indicated in the drawing. [N.B. Term- Latest- wherever usedwill mean the alteration/amendments up to the actual date of closing of tender].Consignee SSE/P. WAY/CTD/ GAYA Bihar 530.00 Set8 4967SR Goods (Y) Non Stock --- Yes RDSO RDSO-QA INR Page 2 of 6 Run Date/Time: 01/09/2021 12:38:59ER HQ-ENGINEERING/EASTERN RLYTENDER DOCUMENTTender No CETPER2021CP02 Closing Date/Time 08/10/2021 14:00 Manufacturing and Supply of CMS Crossing for BG. 60 Kg [UIC] on PSC Sleepers 1in 8.5 to RDSO Drg. No. T-4967 (latest alteration)and Spn. IRS T-29:2016 for CMS Crossing and drawingscomplete with C.I. Distance Blocks, Packing Pieces, M.S. Tapered Washers, Check Blocks and Bolts of differentsizes as listed in the drawing excluding other items indicated in the drawing. [N.B. Term- Latest- wherever usedwill mean the alteration/amendments up to the actual date of closing of tender].Consignee SSE/PWD/GOC Telangana 50.00 Set9 4967ECoR Goods (Y) Non Stock --- Yes RDSO RDSO-QA INR Manufacturing and Supply of CMS Crossing for BG. 60 Kg [UIC] on PSC Sleepers 1in 8.5 to RDSO Drg. No. T-4967 (latest alteration)and Spn. IRS T-29:2016 for CMS Crossing and drawingscomplete with C.I. Distance Blocks, Packing Pieces, M.S. Tapered Washers, Check Blocks and Bolts of differentsizes as listed in the drawing excluding other items indicated in the drawing. [N.B. Term- Latest- wherever usedwill mean the alteration/amendments up to the actual date of closing of tender].Consignee SSE/DSD/CTC Odisha 363.00 Set3. T AND CF.O.RDescriptionDestinationDelivery PeriodDescription Delivery / Completion Rate of SupplyItem - ---- Commencement : Within 3 Months of issue of Supply should beContract, Completion : Within 24 Months completed asmentioned inindividual supplyorders to beissued byConsignee Rly.Item - ---- Commencement : Within 3 Months of issue of Supply should beContract, Completion : Within 24 Months completed asmentioned inindividual supplyorders to beissued byConsignee Rly.Item - ---- Commencement : Within 3 Months of issue of Supply should beContract, Completion : Within 24 Months completed asmentioned inindividual supplyorders to beissued byConsignee Rly.Item - ---- Commencement : Within 3 Months of issue of Supply should beContract, Completion : Within 24 Months completed asmentioned inindividual supplyorders to beissued byConsignee Rly.Page 3 of 6 Run Date/Time: 01/09/2021 12:38:59ER HQ-ENGINEERING/EASTERN RLYTENDER DOCUMENTTender No CETPER2021CP02 Closing Date/Time 08/10/2021 14:00Item - ---- Commencement : Within 3 Months of issue of Supply should beContract, Completion : Within 24 Months completed asmentioned inindividual supplyorders to beissued byConsignee Rly.Item - ---- Commencement : Within 3 Months of issue of Supply should beContract, Completion : Within 24 Months completed asmentioned inindividual supplyorders to beissued byConsignee Rly.Item - ---- Commencement : Within 3 Months of issue of Supply should beContract, Completion : Within 24 Months completed asmentioned inindividual supplyorders to beissued byConsignee Rly.Payment TermsS.No DescriptionPayment Terms1 Payment will be made as per Clause No. 10.0 of Special Conditions of Contract of Tender Document.Statutory Variation ClauseS.No Description1 As per Clause No. 11.0 of General Conditions of Tender for Supply Contract of Tender Document.Option ClauseS.No Description1 As per Clause No. 14.0 of General Conditions of Tender for Supply Contract of Tender Document.Standard Governing ConditionsS.No Description1 IRS Conditions of Contract: The contract shall be governed by latest version (along with all correction slips) ofIRS Conditions of Contract, and all other terms and conditions incorporated in the tender documents.4. ELIGIBILITY CONDITIONSAll documents uploaded and remarks / confirmation entered by the bidders against any eligibility conditionImportant :shall be opened as part of technical bid onlySpecial Eligibility CriteriaS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 As per clause 12.0 of Special Conditions of Contract. Yes Yes Allowed(Optional)5. COMPLIANCE CONDITIONSAll documents uploaded and remarks / confirmation entered by the bidders against any complianceImportant :condition shall be opened as part of technical bid only.Page 4 of 6 Run Date/Time: 01/09/2021 12:38:59ER HQ-ENGINEERING/EASTERN RLYTENDER DOCUMENTTender No CETPER2021CP02 Closing Date/Time 08/10/2021 14:00Check ListS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 Documents to be uploaded along with e-bid as per clause No. 20.0 of No No Not AllowedInstructions to Tenderers for E-Tendereing.Commercial-ComplianceS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 Please enter the percentage of local content in the material being offered. No Yes AllowedPlease enter 0 for fully imported items, and 100 for fully indigenous items. (Optional)The definition and calculation of local content shall be in accordance withthe Make in India policy as incorporated in the tender conditions.2 The Bidder agrees to supply the Tendered Stores at the rates quoted by Yes Yes Allowedthem in accordance with the IRS Conditions of Contract, Special (Optional)Conditions, General Conditions and Other Conditions specified/attachedwith the Tender.General InstructionsS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 All Conditions shall be as per Tender Document. No No Not AllowedSpecial ConditionsS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 The Bidder agrees to supply the Tendered Stores at the rates quoted by No No Not Allowedthem in accordance with the IRS Conditions of Contract, SpecialConditions, General Conditions and Other Conditions specified/attachedwith the Tender.2 Registration of bidders from Land border countries is compulsory in No No Not Allowedaccordance with Model Clause/Certificate as per Annexure-F as perSpecial Conditions of Contract, if applicable.Technical-CompliancesS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 Specification and Drawing: The Manufacture and Supply of CMS Crossing Yes Yes Not Allowedfor BG. 60 Kg [UIC] on PSC Sleepers 1 in 8.5 to RDSO Drg. No. T-4967(latest alteration) and Spn. IRS T-29:2016 for CMS Crossing for CMSCrossing and other Conditions specified in the Special Conditions ofContract.6. DOCUMENTS ATTACHED WITH TENDERS.No. Document Name Document Description1 SPECIALCONDITIONSOFCONTRACT.pdf SPECIAL CONDITIONS OF CONTRACT2 GENERALCONDITIONSOFTENDERFORSUPPLYCONTRACT.pdf GENERAL CONDITIONS OF TENDER3 INSTRUCTIONTOTENDERER_ITT_.pdf INSTRUCTION TO TENDERERS7. RESPONSIVENESSS.No. Description1 No deviation to the unloading condition stipulated in the tender document is permitted.Page 5 of 6 Run Date/Time: 01/09/2021 12:38:59ER HQ-ENGINEERING/EASTERN RLYTENDER DOCUMENTTender No CETPER2021CP02 Closing Date/Time 08/10/2021 14:002 Any Technical or Commercial deviations having financial repercussion are not permitted.3 Tenderers (RDSO Approved Vendors) are not permitted to quote for less than 50% of Consignee wise quantity.4 Validity of Offer: No deviation from the offer validity period stipulated in the tender is permitted.5 Payment Terms: No deviation from the Payment Terms stipulated in the tender is permitted.6 Delivery Period: No deviation from the Delivery Period stipulated in the tender is permitted.7 Price Variation Clause: No deviation from the Price Variation Clause stipulated in the tender is permitted.8 Declaration as per Annexure-E if exemption from EMD/SD is sought.This tender complies with Public Procurement Policy (Make in India) Order 2017, dated 15/06/2017, issued byDepartment of Industrial Promotion and Policy, Ministry of Commerce, circulated vide Railway Board letter no.2015/RS(G)/779/5 dated 03/08/2017 and 27/12/2017 and amendments/ revisions thereof.As a Tender Inviting Authority, the undersigned has ensured that the issue of this tender does not violate provisions ofGFR regarding procurement through GeM.Digitally Signed By Dy.CE/TRACK/II ( PRIYARANJAN KUMAR )Page 6 of 6 Run Date/Time: 01/09/2021 12:38:59 |
| 9 | Manufacturing and Supply of CMS Crossing for BG. 60 Kg [UIC] on PSC Sleepers 1in 8.5 to RDSO Drg. No. T-4967 (latest alteration) and Spn. IRS T-29:2016 for CMS Crossing and drawingscomplete with C.I. Distance Blocks, Packing Pieces, M.S. Tapered Washers, Check Blocks and Bolts of differentsizes as listed in the drawing excluding other items indicated in the drawing. [N.B. Term- Latest- wherever usedwill mean the alteration/amendments up to the actual date of closing of tender]. |
| 10 | Manufacturing and Supply of CMS Crossing for BG. 60 Kg [UIC] on PSC Sleepers 1in 8.5 to RDSO Drg. No. T-4967 (latest alteration)and Spn. IRS T-29:2016 for CMS Crossing and drawingscomplete with C.I. Distance Blocks, Packing Pieces, M.S. Tapered Washers, Check Blocks and Bolts of differentsizes as listed in the drawing excluding other items indicated in the drawing. [N.B. Term- Latest- wherever usedwill mean the alteration/amendments up to the actual date of closing of tender].Consignee SSE/P. WAY/DSD/BSP Madhya Pradesh 411.00 Set7 4967ECR Goods (Y) Non Stock --- Yes RDSO RDSO-QA INR Manufacturing and Supply of CMS Crossing for BG. 60 Kg [UIC] on PSC Sleepers 1in 8.5 to RDSO Drg. No. T-4967 (latest alteration)and Spn. IRS T-29:2016 for CMS Crossing and drawingscomplete with C.I. Distance Blocks, Packing Pieces, M.S. Tapered Washers, Check Blocks and Bolts of differentsizes as listed in the drawing excluding other items indicated in the drawing. [N.B. Term- Latest- wherever usedwill mean the alteration/amendments up to the actual date of closing of tender].Consignee SSE/P. WAY/CTD/ GAYA Bihar 530.00 Set8 4967SR Goods (Y) Non Stock --- Yes RDSO RDSO-QA INR Page 2 of 6 Run Date/Time: 01/09/2021 12:38:59ER HQ-ENGINEERING/EASTERN RLYTENDER DOCUMENTTender No CETPER2021CP02 Closing Date/Time 08/10/2021 14:00 Manufacturing and Supply of CMS Crossing for BG. 60 Kg [UIC] on PSC Sleepers 1in 8.5 to RDSO Drg. No. T-4967 (latest alteration)and Spn. IRS T-29:2016 for CMS Crossing and drawingscomplete with C.I. Distance Blocks, Packing Pieces, M.S. Tapered Washers, Check Blocks and Bolts of differentsizes as listed in the drawing excluding other items indicated in the drawing. [N.B. Term- Latest- wherever usedwill mean the alteration/amendments up to the actual date of closing of tender].Consignee SSE/PWD/GOC Telangana 50.00 Set9 4967ECoR Goods (Y) Non Stock --- Yes RDSO RDSO-QA INR Manufacturing and Supply of CMS Crossing for BG. 60 Kg [UIC] on PSC Sleepers 1in 8.5 to RDSO Drg. No. T-4967 (latest alteration)and Spn. IRS T-29:2016 for CMS Crossing and drawingscomplete with C.I. Distance Blocks, Packing Pieces, M.S. Tapered Washers, Check Blocks and Bolts of differentsizes as listed in the drawing excluding other items indicated in the drawing. [N.B. Term- Latest- wherever usedwill mean the alteration/amendments up to the actual date of closing of tender].Consignee SSE/DSD/CTC Odisha 363.00 Set3. T AND CF.O.RDescriptionDestinationDelivery PeriodDescription Delivery / Completion Rate of SupplyItem - ---- Commencement : Within 3 Months of issue of Supply should beContract, Completion : Within 24 Months completed asmentioned inindividual supplyorders to beissued byConsignee Rly.Item - ---- Commencement : Within 3 Months of issue of Supply should beContract, Completion : Within 24 Months completed asmentioned inindividual supplyorders to beissued byConsignee Rly.Item - ---- Commencement : Within 3 Months of issue of Supply should beContract, Completion : Within 24 Months completed asmentioned inindividual supplyorders to beissued byConsignee Rly.Item - ---- Commencement : Within 3 Months of issue of Supply should beContract, Completion : Within 24 Months completed asmentioned inindividual supplyorders to beissued byConsignee Rly.Page 3 of 6 Run Date/Time: 01/09/2021 12:38:59ER HQ-ENGINEERING/EASTERN RLYTENDER DOCUMENTTender No CETPER2021CP02 Closing Date/Time 08/10/2021 14:00Item - ---- Commencement : Within 3 Months of issue of Supply should beContract, Completion : Within 24 Months completed asmentioned inindividual supplyorders to beissued byConsignee Rly.Item - ---- Commencement : Within 3 Months of issue of Supply should beContract, Completion : Within 24 Months completed asmentioned inindividual supplyorders to beissued byConsignee Rly.Item - ---- Commencement : Within 3 Months of issue of Supply should beContract, Completion : Within 24 Months completed asmentioned inindividual supplyorders to beissued byConsignee Rly.Payment TermsS.No DescriptionPayment Terms1 Payment will be made as per Clause No. 10.0 of Special Conditions of Contract of Tender Document.Statutory Variation ClauseS.No Description1 As per Clause No. 11.0 of General Conditions of Tender for Supply Contract of Tender Document.Option ClauseS.No Description1 As per Clause No. 14.0 of General Conditions of Tender for Supply Contract of Tender Document.Standard Governing ConditionsS.No Description1 IRS Conditions of Contract: The contract shall be governed by latest version (along with all correction slips) ofIRS Conditions of Contract, and all other terms and conditions incorporated in the tender documents.4. ELIGIBILITY CONDITIONSAll documents uploaded and remarks / confirmation entered by the bidders against any eligibility conditionImportant :shall be opened as part of technical bid onlySpecial Eligibility CriteriaS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 As per clause 12.0 of Special Conditions of Contract. Yes Yes Allowed(Optional)5. COMPLIANCE CONDITIONSAll documents uploaded and remarks / confirmation entered by the bidders against any complianceImportant :condition shall be opened as part of technical bid only.Page 4 of 6 Run Date/Time: 01/09/2021 12:38:59ER HQ-ENGINEERING/EASTERN RLYTENDER DOCUMENTTender No CETPER2021CP02 Closing Date/Time 08/10/2021 14:00Check ListS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 Documents to be uploaded along with e-bid as per clause No. 20.0 of No No Not AllowedInstructions to Tenderers for E-Tendereing.Commercial-ComplianceS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 Please enter the percentage of local content in the material being offered. No Yes AllowedPlease enter 0 for fully imported items, and 100 for fully indigenous items. (Optional)The definition and calculation of local content shall be in accordance withthe Make in India policy as incorporated in the tender conditions.2 The Bidder agrees to supply the Tendered Stores at the rates quoted by Yes Yes Allowedthem in accordance with the IRS Conditions of Contract, Special (Optional)Conditions, General Conditions and Other Conditions specified/attachedwith the Tender.General InstructionsS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 All Conditions shall be as per Tender Document. No No Not AllowedSpecial ConditionsS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 The Bidder agrees to supply the Tendered Stores at the rates quoted by No No Not Allowedthem in accordance with the IRS Conditions of Contract, SpecialConditions, General Conditions and Other Conditions specified/attachedwith the Tender.2 Registration of bidders from Land border countries is compulsory in No No Not Allowedaccordance with Model Clause/Certificate as per Annexure-F as perSpecial Conditions of Contract, if applicable.Technical-CompliancesS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 Specification and Drawing: The Manufacture and Supply of CMS Crossing Yes Yes Not Allowedfor BG. 60 Kg [UIC] on PSC Sleepers 1 in 8.5 to RDSO Drg. No. T-4967(latest alteration) and Spn. IRS T-29:2016 for CMS Crossing for CMSCrossing and other Conditions specified in the Special Conditions ofContract.6. DOCUMENTS ATTACHED WITH TENDERS.No. Document Name Document Description1 SPECIALCONDITIONSOFCONTRACT.pdf SPECIAL CONDITIONS OF CONTRACT2 GENERALCONDITIONSOFTENDERFORSUPPLYCONTRACT.pdf GENERAL CONDITIONS OF TENDER3 INSTRUCTIONTOTENDERER_ITT_.pdf INSTRUCTION TO TENDERERS7. RESPONSIVENESSS.No. Description1 No deviation to the unloading condition stipulated in the tender document is permitted.Page 5 of 6 Run Date/Time: 01/09/2021 12:38:59ER HQ-ENGINEERING/EASTERN RLYTENDER DOCUMENTTender No CETPER2021CP02 Closing Date/Time 08/10/2021 14:002 Any Technical or Commercial deviations having financial repercussion are not permitted.3 Tenderers (RDSO Approved Vendors) are not permitted to quote for less than 50% of Consignee wise quantity.4 Validity of Offer: No deviation from the offer validity period stipulated in the tender is permitted.5 Payment Terms: No deviation from the Payment Terms stipulated in the tender is permitted.6 Delivery Period: No deviation from the Delivery Period stipulated in the tender is permitted.7 Price Variation Clause: No deviation from the Price Variation Clause stipulated in the tender is permitted.8 Declaration as per Annexure-E if exemption from EMD/SD is sought.This tender complies with Public Procurement Policy (Make in India) Order 2017, dated 15/06/2017, issued byDepartment of Industrial Promotion and Policy, Ministry of Commerce, circulated vide Railway Board letter no.2015/RS(G)/779/5 dated 03/08/2017 and 27/12/2017 and amendments/ revisions thereof.As a Tender Inviting Authority, the undersigned has ensured that the issue of this tender does not violate provisions ofGFR regarding procurement through GeM.Digitally Signed By Dy.CE/TRACK/II ( PRIYARANJAN KUMAR )Page 6 of 6 Run Date/Time: 01/09/2021 12:38:59 |
| 11 | Manufacturing and Supply of CMS Crossing for BG. 60 Kg [UIC] on PSC Sleepers 1in 8.5 to RDSO Drg. No. T-4967 (latest alteration)and Spn. IRS T-29:2016 for CMS Crossing and drawingscomplete with C.I. Distance Blocks, Packing Pieces, M.S. Tapered Washers, Check Blocks and Bolts of differentsizes as listed in the drawing excluding other items indicated in the drawing. [N.B. Term- Latest- wherever usedwill mean the alteration/amendments up to the actual date of closing of tender]. |
| 12 | Manufacturing and Supply of CMS Crossing for BG. 60 Kg [UIC] on PSC Sleepers 1in 8.5 to RDSO Drg. No. T-4967 (latest alteration)and Spn. IRS T-29:2016 for CMS Crossing and drawingscomplete with C.I. Distance Blocks, Packing Pieces, M.S. Tapered Washers, Check Blocks and Bolts of differentsizes as listed in the drawing excluding other items indicated in the drawing. [N.B. Term- Latest- wherever usedwill mean the alteration/amendments up to the actual date of closing of tender].Consignee SSE/P. WAY/CTD/ GAYA Bihar 530.00 Set8 4967SR Goods (Y) Non Stock --- Yes RDSO RDSO-QA INR Page 2 of 6 Run Date/Time: 01/09/2021 12:38:59ER HQ-ENGINEERING/EASTERN RLYTENDER DOCUMENTTender No CETPER2021CP02 Closing Date/Time 08/10/2021 14:00 Manufacturing and Supply of CMS Crossing for BG. 60 Kg [UIC] on PSC Sleepers 1in 8.5 to RDSO Drg. No. T-4967 (latest alteration)and Spn. IRS T-29:2016 for CMS Crossing and drawingscomplete with C.I. Distance Blocks, Packing Pieces, M.S. Tapered Washers, Check Blocks and Bolts of differentsizes as listed in the drawing excluding other items indicated in the drawing. [N.B. Term- Latest- wherever usedwill mean the alteration/amendments up to the actual date of closing of tender].Consignee SSE/PWD/GOC Telangana 50.00 Set9 4967ECoR Goods (Y) Non Stock --- Yes RDSO RDSO-QA INR Manufacturing and Supply of CMS Crossing for BG. 60 Kg [UIC] on PSC Sleepers 1in 8.5 to RDSO Drg. No. T-4967 (latest alteration)and Spn. IRS T-29:2016 for CMS Crossing and drawingscomplete with C.I. Distance Blocks, Packing Pieces, M.S. Tapered Washers, Check Blocks and Bolts of differentsizes as listed in the drawing excluding other items indicated in the drawing. [N.B. Term- Latest- wherever usedwill mean the alteration/amendments up to the actual date of closing of tender].Consignee SSE/DSD/CTC Odisha 363.00 Set3. T AND CF.O.RDescriptionDestinationDelivery PeriodDescription Delivery / Completion Rate of SupplyItem - ---- Commencement : Within 3 Months of issue of Supply should beContract, Completion : Within 24 Months completed asmentioned inindividual supplyorders to beissued byConsignee Rly.Item - ---- Commencement : Within 3 Months of issue of Supply should beContract, Completion : Within 24 Months completed asmentioned inindividual supplyorders to beissued byConsignee Rly.Item - ---- Commencement : Within 3 Months of issue of Supply should beContract, Completion : Within 24 Months completed asmentioned inindividual supplyorders to beissued byConsignee Rly.Item - ---- Commencement : Within 3 Months of issue of Supply should beContract, Completion : Within 24 Months completed asmentioned inindividual supplyorders to beissued byConsignee Rly.Page 3 of 6 Run Date/Time: 01/09/2021 12:38:59ER HQ-ENGINEERING/EASTERN RLYTENDER DOCUMENTTender No CETPER2021CP02 Closing Date/Time 08/10/2021 14:00Item - ---- Commencement : Within 3 Months of issue of Supply should beContract, Completion : Within 24 Months completed asmentioned inindividual supplyorders to beissued byConsignee Rly.Item - ---- Commencement : Within 3 Months of issue of Supply should beContract, Completion : Within 24 Months completed asmentioned inindividual supplyorders to beissued byConsignee Rly.Item - ---- Commencement : Within 3 Months of issue of Supply should beContract, Completion : Within 24 Months completed asmentioned inindividual supplyorders to beissued byConsignee Rly.Payment TermsS.No DescriptionPayment Terms1 Payment will be made as per Clause No. 10.0 of Special Conditions of Contract of Tender Document.Statutory Variation ClauseS.No Description1 As per Clause No. 11.0 of General Conditions of Tender for Supply Contract of Tender Document.Option ClauseS.No Description1 As per Clause No. 14.0 of General Conditions of Tender for Supply Contract of Tender Document.Standard Governing ConditionsS.No Description1 IRS Conditions of Contract: The contract shall be governed by latest version (along with all correction slips) ofIRS Conditions of Contract, and all other terms and conditions incorporated in the tender documents.4. ELIGIBILITY CONDITIONSAll documents uploaded and remarks / confirmation entered by the bidders against any eligibility conditionImportant :shall be opened as part of technical bid onlySpecial Eligibility CriteriaS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 As per clause 12.0 of Special Conditions of Contract. Yes Yes Allowed(Optional)5. COMPLIANCE CONDITIONSAll documents uploaded and remarks / confirmation entered by the bidders against any complianceImportant :condition shall be opened as part of technical bid only.Page 4 of 6 Run Date/Time: 01/09/2021 12:38:59ER HQ-ENGINEERING/EASTERN RLYTENDER DOCUMENTTender No CETPER2021CP02 Closing Date/Time 08/10/2021 14:00Check ListS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 Documents to be uploaded along with e-bid as per clause No. 20.0 of No No Not AllowedInstructions to Tenderers for E-Tendereing.Commercial-ComplianceS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 Please enter the percentage of local content in the material being offered. No Yes AllowedPlease enter 0 for fully imported items, and 100 for fully indigenous items. (Optional)The definition and calculation of local content shall be in accordance withthe Make in India policy as incorporated in the tender conditions.2 The Bidder agrees to supply the Tendered Stores at the rates quoted by Yes Yes Allowedthem in accordance with the IRS Conditions of Contract, Special (Optional)Conditions, General Conditions and Other Conditions specified/attachedwith the Tender.General InstructionsS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 All Conditions shall be as per Tender Document. No No Not AllowedSpecial ConditionsS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 The Bidder agrees to supply the Tendered Stores at the rates quoted by No No Not Allowedthem in accordance with the IRS Conditions of Contract, SpecialConditions, General Conditions and Other Conditions specified/attachedwith the Tender.2 Registration of bidders from Land border countries is compulsory in No No Not Allowedaccordance with Model Clause/Certificate as per Annexure-F as perSpecial Conditions of Contract, if applicable.Technical-CompliancesS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 Specification and Drawing: The Manufacture and Supply of CMS Crossing Yes Yes Not Allowedfor BG. 60 Kg [UIC] on PSC Sleepers 1 in 8.5 to RDSO Drg. No. T-4967(latest alteration) and Spn. IRS T-29:2016 for CMS Crossing for CMSCrossing and other Conditions specified in the Special Conditions ofContract.6. DOCUMENTS ATTACHED WITH TENDERS.No. Document Name Document Description1 SPECIALCONDITIONSOFCONTRACT.pdf SPECIAL CONDITIONS OF CONTRACT2 GENERALCONDITIONSOFTENDERFORSUPPLYCONTRACT.pdf GENERAL CONDITIONS OF TENDER3 INSTRUCTIONTOTENDERER_ITT_.pdf INSTRUCTION TO TENDERERS7. RESPONSIVENESSS.No. Description1 No deviation to the unloading condition stipulated in the tender document is permitted.Page 5 of 6 Run Date/Time: 01/09/2021 12:38:59ER HQ-ENGINEERING/EASTERN RLYTENDER DOCUMENTTender No CETPER2021CP02 Closing Date/Time 08/10/2021 14:002 Any Technical or Commercial deviations having financial repercussion are not permitted.3 Tenderers (RDSO Approved Vendors) are not permitted to quote for less than 50% of Consignee wise quantity.4 Validity of Offer: No deviation from the offer validity period stipulated in the tender is permitted.5 Payment Terms: No deviation from the Payment Terms stipulated in the tender is permitted.6 Delivery Period: No deviation from the Delivery Period stipulated in the tender is permitted.7 Price Variation Clause: No deviation from the Price Variation Clause stipulated in the tender is permitted.8 Declaration as per Annexure-E if exemption from EMD/SD is sought.This tender complies with Public Procurement Policy (Make in India) Order 2017, dated 15/06/2017, issued byDepartment of Industrial Promotion and Policy, Ministry of Commerce, circulated vide Railway Board letter no.2015/RS(G)/779/5 dated 03/08/2017 and 27/12/2017 and amendments/ revisions thereof.As a Tender Inviting Authority, the undersigned has ensured that the issue of this tender does not violate provisions ofGFR regarding procurement through GeM.Digitally Signed By Dy.CE/TRACK/II ( PRIYARANJAN KUMAR )Page 6 of 6 Run Date/Time: 01/09/2021 12:38:59 |
| 13 | Manufacturing and Supply of CMS Crossing for BG. 60 Kg [UIC] on PSC Sleepers 1in 8.5 to RDSO Drg. No. T-4967 (latest alteration)and Spn. IRS T-29:2016 for CMS Crossing and drawingscomplete with C.I. Distance Blocks, Packing Pieces, M.S. Tapered Washers, Check Blocks and Bolts of differentsizes as listed in the drawing excluding other items indicated in the drawing. [N.B. Term- Latest- wherever usedwill mean the alteration/amendments up to the actual date of closing of tender]. |
| 14 | Manufacturing and Supply of CMS Crossing for BG. 60 Kg [UIC] on PSC Sleepers 1in 8.5 to RDSO Drg. No. T-4967 (latest alteration)and Spn. IRS T-29:2016 for CMS Crossing and drawingscomplete with C.I. Distance Blocks, Packing Pieces, M.S. Tapered Washers, Check Blocks and Bolts of differentsizes as listed in the drawing excluding other items indicated in the drawing. [N.B. Term- Latest- wherever usedwill mean the alteration/amendments up to the actual date of closing of tender].Consignee SSE/PWD/GOC Telangana 50.00 Set9 4967ECoR Goods (Y) Non Stock --- Yes RDSO RDSO-QA INR Manufacturing and Supply of CMS Crossing for BG. 60 Kg [UIC] on PSC Sleepers 1in 8.5 to RDSO Drg. No. T-4967 (latest alteration)and Spn. IRS T-29:2016 for CMS Crossing and drawingscomplete with C.I. Distance Blocks, Packing Pieces, M.S. Tapered Washers, Check Blocks and Bolts of differentsizes as listed in the drawing excluding other items indicated in the drawing. [N.B. Term- Latest- wherever usedwill mean the alteration/amendments up to the actual date of closing of tender].Consignee SSE/DSD/CTC Odisha 363.00 Set3. T AND CF.O.RDescriptionDestinationDelivery PeriodDescription Delivery / Completion Rate of SupplyItem - ---- Commencement : Within 3 Months of issue of Supply should beContract, Completion : Within 24 Months completed asmentioned inindividual supplyorders to beissued byConsignee Rly.Item - ---- Commencement : Within 3 Months of issue of Supply should beContract, Completion : Within 24 Months completed asmentioned inindividual supplyorders to beissued byConsignee Rly.Item - ---- Commencement : Within 3 Months of issue of Supply should beContract, Completion : Within 24 Months completed asmentioned inindividual supplyorders to beissued byConsignee Rly.Item - ---- Commencement : Within 3 Months of issue of Supply should beContract, Completion : Within 24 Months completed asmentioned inindividual supplyorders to beissued byConsignee Rly.Page 3 of 6 Run Date/Time: 01/09/2021 12:38:59ER HQ-ENGINEERING/EASTERN RLYTENDER DOCUMENTTender No CETPER2021CP02 Closing Date/Time 08/10/2021 14:00Item - ---- Commencement : Within 3 Months of issue of Supply should beContract, Completion : Within 24 Months completed asmentioned inindividual supplyorders to beissued byConsignee Rly.Item - ---- Commencement : Within 3 Months of issue of Supply should beContract, Completion : Within 24 Months completed asmentioned inindividual supplyorders to beissued byConsignee Rly.Item - ---- Commencement : Within 3 Months of issue of Supply should beContract, Completion : Within 24 Months completed asmentioned inindividual supplyorders to beissued byConsignee Rly.Payment TermsS.No DescriptionPayment Terms1 Payment will be made as per Clause No. 10.0 of Special Conditions of Contract of Tender Document.Statutory Variation ClauseS.No Description1 As per Clause No. 11.0 of General Conditions of Tender for Supply Contract of Tender Document.Option ClauseS.No Description1 As per Clause No. 14.0 of General Conditions of Tender for Supply Contract of Tender Document.Standard Governing ConditionsS.No Description1 IRS Conditions of Contract: The contract shall be governed by latest version (along with all correction slips) ofIRS Conditions of Contract, and all other terms and conditions incorporated in the tender documents.4. ELIGIBILITY CONDITIONSAll documents uploaded and remarks / confirmation entered by the bidders against any eligibility conditionImportant :shall be opened as part of technical bid onlySpecial Eligibility CriteriaS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 As per clause 12.0 of Special Conditions of Contract. Yes Yes Allowed(Optional)5. COMPLIANCE CONDITIONSAll documents uploaded and remarks / confirmation entered by the bidders against any complianceImportant :condition shall be opened as part of technical bid only.Page 4 of 6 Run Date/Time: 01/09/2021 12:38:59ER HQ-ENGINEERING/EASTERN RLYTENDER DOCUMENTTender No CETPER2021CP02 Closing Date/Time 08/10/2021 14:00Check ListS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 Documents to be uploaded along with e-bid as per clause No. 20.0 of No No Not AllowedInstructions to Tenderers for E-Tendereing.Commercial-ComplianceS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 Please enter the percentage of local content in the material being offered. No Yes AllowedPlease enter 0 for fully imported items, and 100 for fully indigenous items. (Optional)The definition and calculation of local content shall be in accordance withthe Make in India policy as incorporated in the tender conditions.2 The Bidder agrees to supply the Tendered Stores at the rates quoted by Yes Yes Allowedthem in accordance with the IRS Conditions of Contract, Special (Optional)Conditions, General Conditions and Other Conditions specified/attachedwith the Tender.General InstructionsS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 All Conditions shall be as per Tender Document. No No Not AllowedSpecial ConditionsS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 The Bidder agrees to supply the Tendered Stores at the rates quoted by No No Not Allowedthem in accordance with the IRS Conditions of Contract, SpecialConditions, General Conditions and Other Conditions specified/attachedwith the Tender.2 Registration of bidders from Land border countries is compulsory in No No Not Allowedaccordance with Model Clause/Certificate as per Annexure-F as perSpecial Conditions of Contract, if applicable.Technical-CompliancesS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 Specification and Drawing: The Manufacture and Supply of CMS Crossing Yes Yes Not Allowedfor BG. 60 Kg [UIC] on PSC Sleepers 1 in 8.5 to RDSO Drg. No. T-4967(latest alteration) and Spn. IRS T-29:2016 for CMS Crossing for CMSCrossing and other Conditions specified in the Special Conditions ofContract.6. DOCUMENTS ATTACHED WITH TENDERS.No. Document Name Document Description1 SPECIALCONDITIONSOFCONTRACT.pdf SPECIAL CONDITIONS OF CONTRACT2 GENERALCONDITIONSOFTENDERFORSUPPLYCONTRACT.pdf GENERAL CONDITIONS OF TENDER3 INSTRUCTIONTOTENDERER_ITT_.pdf INSTRUCTION TO TENDERERS7. RESPONSIVENESSS.No. Description1 No deviation to the unloading condition stipulated in the tender document is permitted.Page 5 of 6 Run Date/Time: 01/09/2021 12:38:59ER HQ-ENGINEERING/EASTERN RLYTENDER DOCUMENTTender No CETPER2021CP02 Closing Date/Time 08/10/2021 14:002 Any Technical or Commercial deviations having financial repercussion are not permitted.3 Tenderers (RDSO Approved Vendors) are not permitted to quote for less than 50% of Consignee wise quantity.4 Validity of Offer: No deviation from the offer validity period stipulated in the tender is permitted.5 Payment Terms: No deviation from the Payment Terms stipulated in the tender is permitted.6 Delivery Period: No deviation from the Delivery Period stipulated in the tender is permitted.7 Price Variation Clause: No deviation from the Price Variation Clause stipulated in the tender is permitted.8 Declaration as per Annexure-E if exemption from EMD/SD is sought.This tender complies with Public Procurement Policy (Make in India) Order 2017, dated 15/06/2017, issued byDepartment of Industrial Promotion and Policy, Ministry of Commerce, circulated vide Railway Board letter no.2015/RS(G)/779/5 dated 03/08/2017 and 27/12/2017 and amendments/ revisions thereof.As a Tender Inviting Authority, the undersigned has ensured that the issue of this tender does not violate provisions ofGFR regarding procurement through GeM.Digitally Signed By Dy.CE/TRACK/II ( PRIYARANJAN KUMAR )Page 6 of 6 Run Date/Time: 01/09/2021 12:38:59 |
| 15 | Manufacturing and Supply of CMS Crossing for BG. 60 Kg [UIC] on PSC Sleepers 1in 8.5 to RDSO Drg. No. T-4967 (latest alteration)and Spn. IRS T-29:2016 for CMS Crossing and drawingscomplete with C.I. Distance Blocks, Packing Pieces, M.S. Tapered Washers, Check Blocks and Bolts of differentsizes as listed in the drawing excluding other items indicated in the drawing. [N.B. Term- Latest- wherever usedwill mean the alteration/amendments up to the actual date of closing of tender]. |
| 16 | Manufacturing and Supply of CMS Crossing for BG. 60 Kg [UIC] on PSC Sleepers 1in 8.5 to RDSO Drg. No. T-4967 (latest alteration)and Spn. IRS T-29:2016 for CMS Crossing and drawingscomplete with C.I. Distance Blocks, Packing Pieces, M.S. Tapered Washers, Check Blocks and Bolts of differentsizes as listed in the drawing excluding other items indicated in the drawing. [N.B. Term- Latest- wherever usedwill mean the alteration/amendments up to the actual date of closing of tender].Consignee SSE/DSD/CTC Odisha 363.00 Set3. T AND CF.O.RDescriptionDestinationDelivery PeriodDescription Delivery / Completion Rate of SupplyItem - ---- Commencement : Within 3 Months of issue of Supply should beContract, Completion : Within 24 Months completed asmentioned inindividual supplyorders to beissued byConsignee Rly.Item - ---- Commencement : Within 3 Months of issue of Supply should beContract, Completion : Within 24 Months completed asmentioned inindividual supplyorders to beissued byConsignee Rly.Item - ---- Commencement : Within 3 Months of issue of Supply should beContract, Completion : Within 24 Months completed asmentioned inindividual supplyorders to beissued byConsignee Rly.Item - ---- Commencement : Within 3 Months of issue of Supply should beContract, Completion : Within 24 Months completed asmentioned inindividual supplyorders to beissued byConsignee Rly.Page 3 of 6 Run Date/Time: 01/09/2021 12:38:59ER HQ-ENGINEERING/EASTERN RLYTENDER DOCUMENTTender No CETPER2021CP02 Closing Date/Time 08/10/2021 14:00Item - ---- Commencement : Within 3 Months of issue of Supply should beContract, Completion : Within 24 Months completed asmentioned inindividual supplyorders to beissued byConsignee Rly.Item - ---- Commencement : Within 3 Months of issue of Supply should beContract, Completion : Within 24 Months completed asmentioned inindividual supplyorders to beissued byConsignee Rly.Item - ---- Commencement : Within 3 Months of issue of Supply should beContract, Completion : Within 24 Months completed asmentioned inindividual supplyorders to beissued byConsignee Rly.Payment TermsS.No DescriptionPayment Terms1 Payment will be made as per Clause No. 10.0 of Special Conditions of Contract of Tender Document.Statutory Variation ClauseS.No Description1 As per Clause No. 11.0 of General Conditions of Tender for Supply Contract of Tender Document.Option ClauseS.No Description1 As per Clause No. 14.0 of General Conditions of Tender for Supply Contract of Tender Document.Standard Governing ConditionsS.No Description1 IRS Conditions of Contract: The contract shall be governed by latest version (along with all correction slips) ofIRS Conditions of Contract, and all other terms and conditions incorporated in the tender documents.4. ELIGIBILITY CONDITIONSAll documents uploaded and remarks / confirmation entered by the bidders against any eligibility conditionImportant :shall be opened as part of technical bid onlySpecial Eligibility CriteriaS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 As per clause 12.0 of Special Conditions of Contract. Yes Yes Allowed(Optional)5. COMPLIANCE CONDITIONSAll documents uploaded and remarks / confirmation entered by the bidders against any complianceImportant :condition shall be opened as part of technical bid only.Page 4 of 6 Run Date/Time: 01/09/2021 12:38:59ER HQ-ENGINEERING/EASTERN RLYTENDER DOCUMENTTender No CETPER2021CP02 Closing Date/Time 08/10/2021 14:00Check ListS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 Documents to be uploaded along with e-bid as per clause No. 20.0 of No No Not AllowedInstructions to Tenderers for E-Tendereing.Commercial-ComplianceS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 Please enter the percentage of local content in the material being offered. No Yes AllowedPlease enter 0 for fully imported items, and 100 for fully indigenous items. (Optional)The definition and calculation of local content shall be in accordance withthe Make in India policy as incorporated in the tender conditions.2 The Bidder agrees to supply the Tendered Stores at the rates quoted by Yes Yes Allowedthem in accordance with the IRS Conditions of Contract, Special (Optional)Conditions, General Conditions and Other Conditions specified/attachedwith the Tender.General InstructionsS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 All Conditions shall be as per Tender Document. No No Not AllowedSpecial ConditionsS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 The Bidder agrees to supply the Tendered Stores at the rates quoted by No No Not Allowedthem in accordance with the IRS Conditions of Contract, SpecialConditions, General Conditions and Other Conditions specified/attachedwith the Tender.2 Registration of bidders from Land border countries is compulsory in No No Not Allowedaccordance with Model Clause/Certificate as per Annexure-F as perSpecial Conditions of Contract, if applicable.Technical-CompliancesS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 Specification and Drawing: The Manufacture and Supply of CMS Crossing Yes Yes Not Allowedfor BG. 60 Kg [UIC] on PSC Sleepers 1 in 8.5 to RDSO Drg. No. T-4967(latest alteration) and Spn. IRS T-29:2016 for CMS Crossing for CMSCrossing and other Conditions specified in the Special Conditions ofContract.6. DOCUMENTS ATTACHED WITH TENDERS.No. Document Name Document Description1 SPECIALCONDITIONSOFCONTRACT.pdf SPECIAL CONDITIONS OF CONTRACT2 GENERALCONDITIONSOFTENDERFORSUPPLYCONTRACT.pdf GENERAL CONDITIONS OF TENDER3 INSTRUCTIONTOTENDERER_ITT_.pdf INSTRUCTION TO TENDERERS7. RESPONSIVENESSS.No. Description1 No deviation to the unloading condition stipulated in the tender document is permitted.Page 5 of 6 Run Date/Time: 01/09/2021 12:38:59ER HQ-ENGINEERING/EASTERN RLYTENDER DOCUMENTTender No CETPER2021CP02 Closing Date/Time 08/10/2021 14:002 Any Technical or Commercial deviations having financial repercussion are not permitted.3 Tenderers (RDSO Approved Vendors) are not permitted to quote for less than 50% of Consignee wise quantity.4 Validity of Offer: No deviation from the offer validity period stipulated in the tender is permitted.5 Payment Terms: No deviation from the Payment Terms stipulated in the tender is permitted.6 Delivery Period: No deviation from the Delivery Period stipulated in the tender is permitted.7 Price Variation Clause: No deviation from the Price Variation Clause stipulated in the tender is permitted.8 Declaration as per Annexure-E if exemption from EMD/SD is sought.This tender complies with Public Procurement Policy (Make in India) Order 2017, dated 15/06/2017, issued byDepartment of Industrial Promotion and Policy, Ministry of Commerce, circulated vide Railway Board letter no.2015/RS(G)/779/5 dated 03/08/2017 and 27/12/2017 and amendments/ revisions thereof.As a Tender Inviting Authority, the undersigned has ensured that the issue of this tender does not violate provisions ofGFR regarding procurement through GeM.Digitally Signed By Dy.CE/TRACK/II ( PRIYARANJAN KUMAR )Page 6 of 6 Run Date/Time: 01/09/2021 12:38:59 |
| 17 | Manufacturing and Supply of CMS Crossing for BG. 60 Kg [UIC] on PSC Sleepers 1in 8.5 to RDSO Drg. No. T-4967 (latest alteration)and Spn. IRS T-29:2016 for CMS Crossing and drawingscomplete with C.I. Distance Blocks, Packing Pieces, M.S. Tapered Washers, Check Blocks and Bolts of differentsizes as listed in the drawing excluding other items indicated in the drawing. [N.B. Term- Latest- wherever usedwill mean the alteration/amendments up to the actual date of closing of tender]. |
Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail