| 1 | Item No.1: Labour charges for Erection of scaffolding all around outside the outer prakara for attending repairs to brick structure (Salahara) on outer prakara wall with departmental scaffolding materials Including conveyance of materials, loading, transportation, unloading, labour, GST and other applicable taxes etc. complete item of the work as directed by Site in charge. |
| 2 | Item No.2: Patch Plastering (Base Coat) with Lime Sand Surkhi Mortar 1:1: 1, 20 mm thick at damaged locations on Salahara over outer prakara wall after removing and cleaning the dead mortar and setting fallen edges if any in bricks pieces etc. Including cost, conveyance of materials, loading, transportation, unloading, labour, seigniorage charges, GST and other applicable taxes etc. complete item of the work as directed by Site in charge. |
| 3 | Item No.3: Lime Plastering with finishing coat (Sivara coat ) with Lime Sand Surkhi Mortar 1:1:1, 6 mm thick for water tightening the Salahara on outer prakara wall after thoroughly cleaned the surfaces with soap and potable water to remove black mass formed and setting fallen edges if any in bricks pieces etc. Including cost, conveyance of materials, loading, transportation, unloading, labour, seigniorage charges, GST and other applicable taxes etc. complete item of the work as directed by Site in charge. |
| 4 | Item No.4: Removal scaffolding and stacked the scaffolding materials in stores carefully after cleaning etc. Including conveyance of materials, loading, transportation, unloading, labour, GST and other applicable taxes etc. complete item of the work as directed by Site in charge. |
| 5 | Item No. 5: Earthwork excavation in Hard soil, (for Construction of Rain water / outcome water from Garbalaya collection pit and pumped waste water to outside as temple ground level is approximately 2 Mts. lower than existing surrounding ground level and the same pit can be used as Pushkarini during temple rituals.), and disposing waste by tractor about 4 km distance away from the town etc. Including cost, conveyance of materials, loading, transportation, unloading, labour, seigniorage charges, GST and other applicable taxes etc. complete item of the work as directed by Site in charge. |
| 6 | Item No.6: Laying of PCC 1:4:8 bed with 40 mm HBG metal for foundation (Below steps only). Including cost, conveyance of materials, loading, transportation, unloading, labour, seigniorage charges, curing charges, GST and other applicable taxes etc. complete item of the work as directed by Site in charge. |
| 7 | Item No.7: Construction RR wall in CM 1:4. Including cost, conveyance of materials, loading, transportation, unloading, labour, seigniorage charges, curing charges, GST and other applicable taxes etc. complete item of the work as directed by Site in charge.. |
| 8 | Item No.8: Supply and laying ofthree line dressed hard granite stones of average size 1.20 x 0.30 x 0.15 mts. as steps all around the Pushkarini in CM 1:4.Including cost, conveyance of materials, loading, transportation, unloading, labour, seigniorage charges, GST and other applicable taxes etc. complete item of the work as directed by Site in charge. |
| 9 | Item No.9: Laying a layer of 40 mm HBG metal to 15 cms. Depth and a layer of good quality gravel to 10 cms depth for rain water harvesting. Including cost, conveyance of materials, loading, transportation, unloading, labour, seigniorage charges, curing charges,GST and other applicable taxes etc. complete item of the work as directed by Site in charge. |