Madhya Pradesh Madhya Kshetra Vidyut Vitaran Company Limited-MPMKVVCL has published Rate Contract For Supply Installation Commissioning And Testing Of Scada Rtdas Equipment At Various Location In Mpmkvvcl , Remote Terminal Unit ( Rtu ) For 2 No. Power Transformer ( Having 1 Mcu 6A, 1 Power Card, 5 Di Card Of 32 Digital Input, 3 D. Submission Date for this Tender is 13-09-2021. Connectors Supply Tenders in Bhopal Madhya Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 19-Aug-2021 | Amendment in 708 | Technical Bid | 23-08-2021 |
2 | 24-Aug-2021 | Date Extension TS-708 | Date | 02-09-2021 |
3 | 03-Sep-2021 | Amendment in dates 708 | Date | 13-09-2021 |
Sl. No. | Item Description |
1 | REMOTE TERMINAL UNIT (RTU) FOR 2 NO. POWER TRANSFORMER (having 1 MCU 6A, 1 Power Card, 5 DI card of 32 digital input, 3 DO card of 16 Digital output, 1 DCAI card, 1 COM 6 cards, 1 DC Voltage Transducer) with communication protocol IEC, DNP 3.0, 61850 etc., 48V operated |
2 | MULTI FUNCTION TRANSDUCER 48V (5 Amp, 110 V with RS485 Modbus communication protocol |
3 | CONTACT MULTIPLYING RELAYS (CMRS) with 2NO + 1 NC operating at 30V DC |
4 | HEAVY DUTY RELAY (HDR) FOR CB TRIP/CLOSE (48V DC, 2 NO, 1 NC) |
5 | LDMS along with necessary LDMS software License and convertor 48V DC to 230V AC |
6 | 48 V DC POWER SUPPLY (DCPS) SYSTEM BASED ON SMPS |
7 | Numerical relay SCADA compatible for 33 KV & 11 KV feeder protection |
8 | Auxiliary relay (MTR) 4 No and 4NC, 30V DC, 10 Amp |
9 | SCADA Compatible WINDING TEMPERATURE INDICATOR (WTI), DIAL 150MM, WITH CAPILARY, MERCURY SWICTH TYPE |
10 | SCADA Compatible OIL TEMPERATURE INDICATOR (OTI), DIAL 150MM, WITH CAPILARY, MERCURY SWICTH TYPE |
11 | 11 KV stand alone Fault Passage Indicator complete with GPRS enabled modem (SCADA Compatible) |
12 | Battery for 11KV stand-alone Fault Passage Indicator (SIEMENS make FPI) |
13 | AC/DC Auxiliary Supply Board with suitable MCB & Fuse protection |
14 | Earthing of RTU/FRTU Panel |
15 | FRTU:- comprising panels, racks, sub-racks, Power Supply modules, minimum 02 cards of 32 Digital Input module, CPU Analog MCU card with minimum 03 Ethernet port04 COM port, DCAI, 1 DC Voltage Transducer & support all standard Protocol IEC (i.e. 103, 61850, 104, Modbus), DCPS (24V) with dual battery of minimum 4 hrs backup as per specification interfacing equipment along with 30V DC to 24V DC convertor, dual sim 4G modem with active-active mode with fallback facility of 4G/3G/2G, Necessary cables/connectors for successful commissioning complete with the panels and 50% additional space for modules |
16 | MULTI FUNCTION TRANSDUCER 24V (5 Amp, 110 V with RS485 Modbus communication protocol |
17 | DC Voltage Transducer |
18 | Dual SIM 4G Router/ modem with Active-Active mode with fallback facility of 4G/3G/2G |
19 | Additional Rack for RTU/FRTU |
20 | MCU 6A Module Card Master 48V operated |
21 | MCU 1A Module Card Master 48V operated |
22 | MCU 4A Module Card Slave 48V operated |
23 | MCU 6A Module Card Master 24V operated |
24 | MCU 1A Module Card Master 24V operated |
25 | MCU 4A Module Card Slave 24V operated |
26 | Power Module Card 48V operated |
27 | Power Module Card 24V operated |
28 | DI Card having 32 Digital input, 48V operated |
29 | DI Card having 32 Digital input, 24V operated |
30 | DO Card having 16 Digital output, 48V operated |
31 | DO Card having 16 Digital output, 24V operated |
32 | AI Card having 8 Analog input, 48V operated |
33 | COM 6 Card, 48V operated |
34 | DCPS (24V) with dual battery of minimum 4 hrs backup |
35 | Convertor 48V DC to 230V AC (200 watt) |
36 | Convertor 30V DC to 48V DC (200 watt) |
37 | Convertor 30V DC to 24V DC (200 watt) |
38 | SCADA RTU installation & commissioning charges |
39 | SCADA RTU integration with control centre, creation of Database, SLD and End to End testing |
40 | RT-DAS FRTU installation & commissioning charges |
41 | RT-DAS FRTU integration with control centre, creation of Database, SLD and End to End testing |
42 | Installation and Commissioning of SCADA Feeder Panel along with necessary retrofitting and termination of either ends including all cables, lugs, connectors and accessories if required any |
43 | Installation and Commissioning of SCADA PTR Panel along with necessary retrofitting and termination of either ends including all cables, lugs, connectors and accessories if required any |
44 | Installation and Commissioning of SCADA Capacitor Bank Panel along with necessary retrofitting and termination of either ends including all cables, lugs, connectors and accessories if required any |
45 | Installation and Commissioning of RT-DAS Feeder Panel along with necessary retrofitting and termination of either ends including all cables, lugs, connectors and accessories if required any |
46 | Installation and Commissioning of RT-DAS PTR Panel along with necessary retrofitting and termination of either ends including all cables, lugs, connectors and accessories if required any |
47 | Installation and Commissioning of RT-DAS Capacitor Bank Panel along with necessary retrofitting and termination of either ends including all cables, lugs, connectors and accessories if required any |