Public Health Engineering Department-PHED has published Fixing Of Rate Contract For Repairs / Replacement To Electrical Equipment Installed At Different Wsss Of Phe Mechanical Sub-Division Qazigund Fixing Of Rate Contract For Repairs / Replacement To Electrical Equipment Installed At Different Ws. Submission Date for this Tender is 26-08-2021. Bolts Tenders in Qazigund Jammu And Kashmir. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Providing, fitting and testing of Copper thimbles at site |
2 | 1. 10 Sq. mm |
3 | 2. 16 Sq. mm |
4 | 3. 25 Sq. mm |
5 | 4. 50 Sq. mm |
6 | 5. 70 Sq. mm |
7 | 5. 90 Sq. mm |
8 | 6. 120 Sq. mm |
9 | 7. 150 Sq. mm |
10 | Providing, fitting and testing of Aluminum thimbles at site |
11 | 1. 10 Sq. mm |
12 | 2. 16 Sq. mm |
13 | 3. 25 Sq. mm |
14 | 4. 50 Sq. mm |
15 | 5. 70 Sq. mm |
16 | 5. 90 Sq. mm |
17 | 6. 120 Sq. mm |
18 | 7. 150 Sq. mm |
19 | Providing, fitting of below mentioned item for repairs to 50KVA Voltage Stabilizer including extraction of damaged items, transportation, loading, unloading, shifting back and then fitting and successful testing on no and full load at site. |
20 | Copper wire of specific gauge for fabrication of primary / secondary coil |
21 | Bush rod with porcelain insulator and packing |
22 | Rewinding/Re-taping /re-insulation of coils |
23 | T-Oil |
24 | Copper strip |
25 | Filtration / dehydration of T-oil |
26 | Cost of scrap copper dismattled windings |
27 | Cost of damaged lamination |
28 | Providing, fitting of below mentioned item for repairs to 75KVA Voltage Stabilizer including extraction of damaged items, transportation, loading, unloading, shifting back and then fitting and successful testing on no and full load at site. |
29 | Copper wire of specific gauge for fabrication of primary / secondary coil |
30 | Bush rod with porcelain insulator and packing |
31 | Rewinding/Re-taping /re-insulation of coils |
32 | T-Oil |
33 | Copper strip |
34 | Filtration / dehydration of T-oil |
35 | Cost of scrap copper dismattled windings |
36 | Cost of damaged lamination |
37 | Providing, fitting of below mentioned item for repairs to 100KVA Voltage Stabilizer including extraction of damaged items, transportation, loading, unloading, shifting back and then fitting and successful testing on no and full load at site. |
38 | Copper wire of specific gauge for fabrication of primary / secondary coil |
39 | Bush rod with porcelain insulator and packing |
40 | Rewinding/Re-taping /re-insulation of coils |
41 | T-Oil |
42 | Copper strip |
43 | Filtration / dehydration of T-oil |
44 | Cost of scrap copper dismattled windings |
45 | Cost of damaged lamination |
46 | Providing, fitting of below mentioned item for repairs to Voltage regulator (plate type switch) including extraction of damaged items, transportation, loading, unloading, shifting back and then fitting and successful testing on no and full load at site. |
47 | 1. 150mmx150mm |
48 | 2. 225mm x 225mm |
49 | 3. 200mm x 200mm |
50 | 4. 250mm x 250mm |
51 | 5.300mm x 300mm |
52 | 6. 375mm x 375mm |
53 | 7.450mm x 450mm |
54 | Providing, fitting of below mentioned item for repairs to Voltage regulator (drum type switch) including extraction of damaged items, transportation, loading, unloading, shifting back and then fitting and successful testing on no and full load at site. |
55 | 1. 32A |
56 | 2. 63A |
57 | 3. 100A |
58 | 4. 200A |
59 | Providing, fitting and testing of Voltmeters at site |
60 | 0-200V |
61 | 0-500V |
62 | Providing, fitting and testing ofThree phase digital type LED voltmeters class 1at site - Make L&T/Rishab |
63 | 0-500V |
64 | Providing, fitting and testing of Ammeters at site |
65 | 1. 0-50A with CT ratio of 5/50 |
66 | 2. 0-100A with CT ratio of 5/100 |
67 | 3. 0-150A with CT ratio of 5/150 |
68 | 4. 0-200A with CT ratio of 5/200 |
69 | Providing, fitting and testing of 96 sq mm Three phase digital LED Ammeters class1at site - Make L&T/Rishab |
70 | Providing, fitting and testing of 96 sq mm Three phaseLED Frequency meter class0.2 at site - Make L&T/Rishab |
71 | Providing, fitting and testing of Three phase Analogus type 0-50HZ frequency meter at site - Make L&T/Rishab/AE |
72 | Providing, fitting and testing of post type drop out set including extraction of damaged ones, transportation, loading, unloading, fitting and successful testing on no and full load at site. |
73 | Suitable for 25KVA SS |
74 | Suitable for 63KVA SS |
75 | Suitable for 100KVA SS |
76 | Suitable for 250KVA SS |
77 | Providing, fitting and testing of link set including extraction of damaged ones, transportation, loading, unloading, fitting and successful testing on no and full load at site. |
78 | Suitable for 25KVA SS |
79 | Suitable for 63KVA SS |
80 | Suitable for 100KVA SS |
81 | Suitable for 250KVA SS |
82 | Providing, fitting and testing of 11KVA Disc set including extraction of damaged ones, transportation, loading, unloading, fitting and successful testing on no and full load at site. |
83 | Providing, fitting and testing of 11KVA pin insulators including extraction of damaged ones, transportation, loading, unloading, fitting and successful testing on no and full load at site. |
84 | Providing, fitting and testing of submersible copper cables of below mentioned specifications including extraction of damaged ones, transportation, loading, unloading, fitting and successful testing on no and full load at site. |
85 | 1. 10 sq mm |
86 | 2. 16 sq mm |
87 | 3. 25 sq mm |
88 | Providing, fitting and testing of copper cables of below mentioned specifications including extraction of damaged ones, transportation, loading, unloading, fitting and successful testing on no and full load at site. |
89 | 19/0.0064 |
90 | 19/0.044 |
91 | 7/16.00 |
92 | Providing, fitting and testing of 3.5 core XLPE aluminum conductor of below mentioned specifications including extraction of damaged ones, transportation, loading, unloading, fitting and successful testing on no and full load at site. |
93 | 1. 35 Sq. mm |
94 | 2. 50 Sq. mm |
95 | 3. 70 Sq. mm |
96 | 3. 95 Sq. mm |
97 | 4. 120 Sq. mm |
98 | 5. 185 Sq. mm |
99 | Providing, fitting and testing of 11KVAXLPE aerial Bunched cable(HT)of below mentioned specifications including extraction of damaged ones, transportation, loading, unloading, fitting and successful testing on no and full load at site. |
100 | 1. 35 Sq. mm |
101 | 2. 50 Sq. mm |
102 | Providing, fitting and testing of 11KVAcable termination/Jointing kit set below mentioned specifications including extraction of damaged ones, transportation, loading, unloading, fitting and successful testing on no and full load at site. |
103 | 1. 35 Sq. mm |
104 | 2. 50 Sq. mm |
105 | Providing, fitting and testing of 11KV post type lightening arrestor including extraction of damaged ones, transportation, loading, unloading, fitting and successful testing on no and full load at site. |
106 | Providing, fitting and testing of G.O.D set including extraction of damaged ones, transportation, loading, unloading, fitting and successful testing on no and full load at site. |
107 | Providing, fitting and testing of Cross arms including extraction of damaged ones, transportation, loading, unloading, fitting and successful testing on no and full load at site. |
108 | 1. Channels 75x40 |
109 | 2. Channels 100 x 50 |
110 | 3. Angle iron support |
111 | 4. F-top |
112 | 5. U Clamps |
113 | 6. Guy-wire with turn buckle |
114 | 7. Guy-Insulator |
115 | Providing, fitting and testing of ACSR Conductor including extraction of damaged ones, transportation, loading, unloading, fitting and successful testing on no and full load at site. |
116 | 1. 0.03 |
117 | 2. 0.05 |
118 | Providing, fitting and testing of MCCBs (04 Pole) including extraction of damaged ones, transportation, loading, unloading, fitting and successful testing on no and full load at site. |
119 | 63 Amps |
120 | 100 Amps |
121 | 125 Amps |
122 | 160 Amps |
123 | 200 Amps |
124 | 250 Amps |
125 | 320 Amps |
126 | 400 Amps |
127 | Providing, fitting and testing of MCCBs (03 Pole) including extraction of damaged ones, transportation, loading, unloading, fitting and successful testing on no and full load at site. |
128 | 63amps |
129 | 100amps |
130 | 125amps |
131 | 160amps |
132 | 200Amps |
133 | 250amps |
134 | Providing, fitting and testing of Change over switch including extraction of damaged ones, transportation, loading, unloading, fitting and successful testing on no and full load at site. |
135 | 63 A |
136 | 100 A |
137 | 200 A |
138 | 630 A |
139 | Providing, fitting and testing of on load Change over switch Front operated on load 4 pole including extraction of damaged ones, transportation, loading, unloading, fitting and successful testing on no and full load at site. Make - L& T |
140 | 100 Amp |
141 | 200Amp |
142 | Providing, fitting and testing of Combined volt-ammeter for MU-G starters |
143 | 30A |
144 | 60A |
145 | 75A |
146 | 100A |
147 | 125A |
148 | Providing, fitting and testing of 415V Indicating lamps |
149 | Red |
150 | Yellow |
151 | Green |
152 | Providing, fitting and testing of 415V Single phase preventor (MU G10 to MU G75) |
153 | Providing, fitting and testing of Terminal block with start/stop button |
154 | 30A-5 way |
155 | 60A-3way |
156 | 60A-6 way |
157 | 100A-3 way |
158 | 120A-3 way |
159 | Providing, fitting and testing of Power contactor for MU-G starters |
160 | MU-G10 |
161 | MU-G15 |
162 | MU-G20 |
163 | MU-G30 |
164 | MU-G40 |
165 | MU-G50 |
166 | MU-G75 |
167 | Providing, fitting and testing of Overload relay/under voltage relay/single phase preventer/Timer for MU-G starters |
168 | MU-G10 |
169 | MU-G15 |
170 | MU-G20 |
171 | MU-G30 |
172 | MU-G40 |
173 | MU-G50 |
174 | MU-G75 |
175 | Providing and fitting of GSM based remote access motor control module complete replacement |
176 | Providing and fitting of Multi-Function Meter Square Dial type |
177 | Providing, fitting of below mentioned item for repairs to 40KVA to 100 KVA Voltage Stabilizer including extraction of damaged items, transportation, loading, unloading, shifting back and then fitting and successful testing on no and full load at site. |
178 | Copper wire of specific gauge for fabrication of primary / secondary coil |
179 | Bush rod with porcelain insulator and packing |
180 | Rewinding/Re-taping /re-insulation of coils |
181 | T-Oil |
182 | Copper strip |
183 | Filtration / dehydration of T-oil |
184 | Cost of scrap copper dismattled windings |
185 | Cost of damaged lamination |
186 | Nuts and bolts of different size |
187 | Providing Fitting Ammeter /Voltmeter/Selector Switch |
188 | Providing, fitting of below mentioned item for repairs to 10KVA to 50KVA Servo Stabilizer including extraction of damaged items, transportation, loading, unloading, shifting back and then fitting and successful testing on no and full load at site. |
189 | Replacement of digital micro controlled processor based control card |
190 | Replacement of AC syncronous servo motor |
191 | Replacement of copper wound motorized auto transformer |
192 | Replacement of buck and boost series transformer |
193 | Repairs to LED lights at site by way of replacing strips |
194 | 25Watt |
195 | 45Watt |
196 | 48Watt |
197 | 50Watt |
198 | 60Watt |
199 | 90Watt |
200 | 100Watt |
201 | 120Watt |
202 | Erection of MS tubular 9m/11m tilted pole by way of excavation of new trench and concrete bottoming including re-fitting/fixing of ACSR conductor on the insulators |
203 | Repairs to horizontal Motor with rating from 5HP to 50HP Dismantling of the horizontal motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successfull testing on full load. Job includes repairing / fabrication and providing / replacement of following items. |
204 | Copper wire used in rewinding the motor. |
205 | Rewinding,Skilled labor, insulated paper and sleeves used during rewinding and testing of motor at site. |
206 | Cost on account of associated/consumable items like crimpled paper, sleeves, PVC paper, bamboo sticks, thread, varnish etc |
207 | Cost of scrap copper dismanttled windings |
208 | Repairs to submersible Motor with rating from 5HP to 50HP Dismantling of the submersible motor at site, shifting to the workshop, repairing, shifting back to site, re-fitting and successfull testing on full load. Job includes repairing / fabrication and providing / replacement of following items. |
209 | Copper wire used in rewinding the motor. |
210 | Rewinding, Skilled labor, tapping and sleeves used during rewinding and testing of motor at site. |
211 | Cost on account of associated/consumable items like crimpled paper, sleeves, PVC paper, bamboo sticks, thread, etc |
212 | Replacement of motor shaft |
213 | Cost of scrap copper dismanttled windings |
214 | Replacing of damages illumination single core multistranded copper wiring |
215 | 1 Sq mm |
216 | 1.5 Sq mm |
217 | 2 Sq mm |
218 | 2.5 Sq mm |
219 | 4 Sq mm |
220 | Replacement of damaged electrification and electrification of pump house including cost of channels/conduits, fitting charges, transportation and testing on load at site |
221 | Lighting points in 1.0mm2 copper wire including 5W LED lamp |
222 | Heating points in 2.5 mm2 copper wire including 16Amp SS combined |
223 | Providing of 5W/7W LED lamp |
224 | Replacement of damaged LED street light 48W (Havells make) |
225 | Providing, fitting Racer plate to submersible motor from 05HP to 50HP including extraction of damaged items, transportation, loading, unloading, shifting back and then fitting and successful testing on no and full load at site |
226 | Providing/fitting of Steel coupling for submersible motors from 05HP to 50 HP including cotter |
227 | Providing/fitting of connection platefor Horizontal motors from 05HP to 50 HP |
228 | Repairs to the rotor/body of submersible motor |
229 | Repairs to the rotor/body, fan, shield of Horizontal motor |
230 | Providing/fitting of M S coupling for Horizontal motors from 05HP to 50 HP including cotter and boring |
231 | Providing/fitting of Gun metalbush (finished) to the submersible motor from 05HP to 50HP as per sample |
232 | Repair works on DG Set 25 KVA - 62.5 KVA |
233 | Repairs to self / Dynamo of DG set |
234 | Providing/fitting of AVR to DG set as per sample (25 KVA to 62.5KVA) |
235 | Repair and rewinding of DG set cooling fan |
236 | Minor overhauling of DG set including repair to radiator |
237 | Providing/fitting of Battery connection leads with copper connectors |
238 | Replacement of M-Oil |
239 | Replacement of Air Hose Pipe |
240 | Replacement of Fuel Pipe |
241 | Providing/fitting of Battery connection leads with copper connectors |
242 | Providing and fitting of Side thrust bearing for different capacity open well submersible pumping units (horizontal type) compatible for |
243 | 7.5HP |
244 | 10HP |
245 | 12.5HP |
246 | 15HP |
247 | Providing and fitting of Bush bearing (DE & NDE) for different capacity open well submersible horizontal type pumping units compatible for |
248 | 7.5HP |
249 | 10HP |
250 | 12.5HP |
251 | 15HP |
252 | Providing and fitting of Ball/Thrust bearing (DE & NDE) for different capacity motors and pumps compatible for |
253 | No. 6308 |
254 | No. 6309 |
255 | No. 6312 |
256 | No. 6306 |
257 | No. 6208 |
258 | No. 6211 |
259 | No. 6311 |
260 | No. 6310 |
261 | No. 6212 |
262 | Providing and fitting of thrust bearings for deep well submersible pumping units compatible for |
263 | Thrust base V4 |
264 | Thrust base V6 |
265 | Thrust base V8 |
266 | Thrust pad V4 |
267 | Thrust pad V6 |
268 | Thrust pad V8 |
269 | Note: The Scrap Value mentioned above shall be deducted from the total valve of BOQ to arrive at value without scrap. The value thus attained shall be again deducted by total scrap value to get the effective amount on BOQ for ascertainingoverall L1. Unless specified, the old material shall be returned to divisional/sub divisional store |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail