| 1 | Earth work excavation of foundation in hard or gravelly soil within initial lead of 50m and initial lift of 1.5m including dressing the sides, leveling the bed and depositing the excavated materials away from the work site, shoring etc if required, complete the item of work in all respect as per direction of the Engineer-in-charge. |
| 2 | Filling foundation and plinth with filling sand laying in layers including ramming, watering, compacting including cost, conveyance and royalty of sand from approved quarry and other taxes if any with all leads, lifts, T&P etc complete the items of work in all respect as per specification and direction of Engineer in charge. |
| 3 | CC (1:3:6) using 40 mm size and down graded crusher broken HG stone metal free from weathered surface of approved quality from approved quarry in foundation and plinth including laying concrete in layers with due compaction, watering and curing including cost, conveyance, royalty and taxes of all materials with all lead, lifts and delifts, T&P etc required for completion of the work in all respect as per direction of the Engineer-in-charge. |
| 4 | Brick work with Flyash bricks of size 23 cm X 11 cm X 8 cm having crushing strength between 100 kg/cm2 to 149 kg/cm2 in cement mortar (1:4) in foundation & plinth including cost, conveyance, royalty, taxes of all materials, labour, T&P required for the work complete and as per the direction of the Engineer-in-charge. |
| 5 | Brick work with Flyash bricks of size 23 cm X 11 cm X 8 cm having crushing strength between 100 kg/cm2 to 149 kg/cm2 in cement mortar (1:6) in foundation & plinth including cost, conveyance, royalty, taxes of all materials, labour, T&P required for the work complete and as per the direction of the Engineer-in-charge. |
| 6 | Brick work with Flyash bricks of size 23 cm X 11 cm X 8 cm having crushing strength between 100 Kg/cm2 to 149 kg/cm2 in cement mortar (1:6) in superstructure including cost, conveyance, royalty, taxes of all materials, labour, T&P required for the work complete and as per the direction of the Engineer-in-charge. |
| 7 | Ground Floor |
| 8 | First Floor |
| 9 | Second Floor |
| 10 | RCC work of M-20 grade with 20 mm and down grade black hard granite chips including cost, conveyance, royalty and all taxes of all materials with all leads, lifts, T&P etc including rigid and smooth centering, shuttering and dismantling the same after the curing of RCC work for 28 days complete the item of work in all respect as per specification and direction of Engineer-in-charge. |
| 11 | Column base & Footing |
| 12 | Plinth Bend |
| 13 | Column & Beam |
| 14 | Ground Floor |
| 15 | First Floor |
| 16 | Second Floor |
| 17 | Lintel Bend |
| 18 | Ground Floor |
| 19 | First Floor |
| 20 | Roof Slab |
| 21 | Ground Floor |
| 22 | First Floor |
| 23 | Second Floor |
| 24 | Staircase excluding landing |
| 25 | Ground Floor |
| 26 | First Floor |
| 27 | Labour charges for straightening coiled or bent up MS rods including cutting, bending and welding if required and tying the grills, laying and placing in proper position as per design including cost, conveyance, taxes etc of tested MS/TS rod with testing data of required specification & cost of binding wires of 18 to 20 gauge, labour, T&P required for the work complete and as per the specification and direction of the Engineer-in-charge. |
| 28 | Ground Floor |
| 29 | First Floor |
| 30 | Second Floor |
| 31 | Supplying of MS grill gate, MS angle chowkhat of approved specification for doors and windows welded with MS sheet shutters of 18 to 20 gauge thick, openable and electrically welded with all necessary fittings including cost of all materials, labour, T&P, transportation to worksite etc all complete in all respect as per the direction of the Engineer-in-charge. |
| 32 | Ground Floor |
| 33 | Door with double leaved shutter |
| 34 | M.S. Window Grill |
| 35 | First Floor |
| 36 | Door with double leaved shutter |
| 37 | M.S. Window Grill |
| 38 | Second Floor |
| 39 | Door with double leaved shutter |
| 40 | Labour charges for fitting and fixing of door and window shutter with all complete work as per the direction of the Engineer-in-charge. |
| 41 | Ground Floor |
| 42 | First Floor |
| 43 | Second Floor |
| 44 | Providing fitting fixing of Alluminium door with OEL anodized Al door section of 9202 as vertical member, 9201 as top member and 9200 as bottom and middle member and 4 mm thick ACP sheet fixed on door frame by means of tapered clip No 4660 and the framed to be completed by means of joininting angle No 1855 including cost of labour, T&P hire charges of drilling machine labour charges etc. complete as per the direction of the Engineer-in-charge. |
| 45 | Ground Floor |
| 46 | First Floor |
| 47 | 12mm thick cement plaster (1:4) including Cement Punning including watering curing to required period including cost conveyance, royalty of all materials, T&P complete etc. as per specification and direction of Engineer in charge. |
| 48 | 12mm thick cement plaster (1:6) in cement mortar finished smooth surface on brick wall after racking out joints including watering curing to required period including cost conveyance, royalty of all materials, T&P complete etc. as per specification and direction of Engineer in charge. |
| 49 | Ground Floor |
| 50 | First Floor |
| 51 | Second Floor |
| 52 | 16mm thick cement plaster (1:6) in cement mortar finished smooth surface on brick wall after racking out joints including watering curing to required period including cost conveyance, royalty of all materials, T&P complete etc. as per specification and direction of Engineer in charge. |
| 53 | Ground Floor |
| 54 | First Floor |
| 55 | Second Floor |
| 56 | 6mm thick cement plaster in cement mortar(1:4)to RCC surface finishedincluding watering curing to required period including cost conveyance, royalty of all materials, T&P complete etc. as per specification and direction of Engineer in charge. |
| 57 | Ground Floor |
| 58 | First Floor |
| 59 | Second Floor |
| 60 | Fixing kota tiles in floors, treads on steps and landing on 25mm thick bed of cement mortar 1:1 (1 cement: 1 sand) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing, cost, conveyance, royalty, taxes of all materials, labour, T&P required for the work complete and as per the direction of the Engineer-in-charge. |
| 61 | Ground Floor |
| 62 | First Floor |
| 63 | Fixing Ceramic tiles in floors, treads on steps and landing on 25mm thick bed of cement mortar 1:1 (1 cement: 1 sand) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing, cost, conveyance, royalty, taxes of all materials, labour, T&P required for the work complete and as per the direction of the Engineer-in-charge. |
| 64 | Ground Floor |
| 65 | First Floor |
| 66 | Fixing ceramic tiles in dado, skirting and rises of steps on 12mm thick cement plaster (1:3) joined with neat cement slurry mixed with pigment to match the shade of the tiles including cost, conveyance, royalty, taxes of all materials, labour, T&P required for the work complete and as per the direction of the Engineer-in-charge. |
| 67 | Ground Floor |
| 68 | First Floor |
| 69 | 2.5 cm grading concrete(1:2:2) on roof slab using 6mmhard granite chips including cost, carriage and royalty of materials complete as per specification and direction of Engineer in charge. |
| 70 | Ground Floor |
| 71 | First Floor |
| 72 | First Floor |
| 73 | CC (1:2:4) using 12mm and down graded size in hard granite crusher broken stone chips free from weathered surface of approved quality from approved quarry including cost, conveyance, royalty and all taxes of all materials with all leads, lifts, T&P etc. complete in all respect as per specification and direction of Engineer-in-charge. |
| 74 | Ground Floor |
| 75 | First Floor |
| 76 | First Floor |
| 77 | Painting two coats of synthetic enamel paint over a coat of primer of approved quality, brand and shade including smoothening the surface by sand paper and filler etc complete with cost, conveyance, royalty, taxes of all materials, labours T&P required as per specification and direction of Engineer-in-charge. |
| 78 | Ground Floor |
| 79 | First Floor |
| 80 | First Floor |
| 81 | Finishing to walls with two coats weather coat over putty work with one coat primer of approved brand and approved colour and shade including cleaning the surfacewith cost, conveyance, royalty taxes of all materials labour T&P and scaffolding as required for the work and as per specification and direction of Engineer-in-charge. |
| 82 | Ground Floor |
| 83 | First Floor |
| 84 | First Floor |
| 85 | Wall painting two coats with plastic emulsion paint over putty work and one coat primer with cost, conveyance, royalty, taxes of all materials labour T&P and scaffolding as required for the work and as per direction of Engineer-in-charge. |
| 86 | Ground Floor |
| 87 | First Floor |
| 88 | First Floor |
| 89 | Supplying, fitting and fixing of Stainless steel of 304 grade in hand railing using 50mm dia of 2mm thick circular pipe with Balustrade of size 32mmx32mmx2mm @ 0.90m C/C and stainless square pipe bracing of size 32mmx32mmx2mm in 3 rows in staircase as per approved design and specification, buffing, polishing etc. with cost, conveyance, taxes of all materials, labour, T&P etc. required for completion of work in all respect as perdirection of Engineer-in-charge. |
| 90 | Ground Floor |
| 91 | First Floor |
| 92 | Fitting & fixing glass louvers in position in wooden, steel, window frames including cutting grooves as per the direction of the Engineer-in-charge. |
| 93 | Ground Floor |
| 94 | First Floor |
| 95 | Supplying,fitting and fixing of 5mm thick black glass as panel in sliding type window as per the direction of Engineer-in-charge. |
| 96 | Ground Floor |
| 97 | First Floor |