Name of Work: CONSTRUCTION OFTROMMEL MACHINE SHADE AT KUDA DUMPING GROUND
Sl. No.
Item Description
1
Excavation in foundation in ordinary soil(loam clay or sand) including lift up to 1.5 meter(5ft) and lead upto 30m (100ft) and including filling, watering &ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of suplus earth as direction by the Engineer-in-charge upto a distance of 30m(100ft) from the foundation trenches.(As per item no. 251)
2
Providing & laying Cement concrete 1:4:8 (1 cement:4 coarse sand : 8 graded stone ballast 40 mm size nominal size) & curingcomplete including supply of all materials, labour, T&P comp. required for proper completion of the work. (S.I. No. 273)
3
Random course Rubble massonary in 1:4 cement and fine mortar in foundation and plinth, including supply of all materials, labour & T&P etc. required for proper completion of the work. (chap-8 Add Item (b))
4
RCC work with cement approved coarse sand and 2cm (3/4’’) gauge approved stone ballast in the proportion 1:1½:3 in lintels of door and windows, excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.I. wire and including necessary cantering and suttering etc and also including supply of all materials, labour and tool and plnats etc.required for proper completion of the work binding wire to be supplied by the contactor free of coast.
5
Mild srteel of iron in plain work such as reinforced concrete/ brick work (when not included in over all rates) wrought to required shape as necessary of the work and including supply of steel, its wastage and hooks and authorized over lapping shall be measured.
6
C.C with 2cm (1/2\") gauge approved stone ballast, approved coarse sand. Cement in the proportion 3:1.5:1 including supply of all materials, labour and tools and plants etc required of the work.
7
Mild steel or iron work of heavy sizes and sections such as trussres, tierods, gratings etc. (when not included in over all rates) wrought to required from excluding supply of steel bolts, nuts, wastage etc and including their fixing required for proper completion of the work.
8
Supply and fixing of galvanized corrugated iron roofing 24 B.W.C. in position including supply of all material labour T&P etc. required for proper completion of works and including wastage.
9
Supply and fixing of 22 B.W.G. ridges valles and gutters for iron roofing fixed with jor U 10 mm dia with GI limpet and bitumen washers complete including supply of all material labour T&P etc. required for proper completion of works including wastage.
10
Painting or venshing new iron work in small areas or new wood with one coat ( up to one sq. meter) of raedy mixed priming paint and three coat of approved superior quilty ready misxed paint or varnish including supply of all materials,labuor and tools plant etc.requred for proper completion of the work.paint to be used should confirm the ISI no-103-1950.
11
Supply and fixing of Inaguration BG stoneincluding all material labour T&P etc. required for proper completion of works as per direction of Engineer-in-charge.
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.