| 1 | Naphtha Stabilizer Including U Stamp inepction, Erection & Commissioing spares, special tools & teckles, scope as defined in material requisition but excluding mandatory spares. Cost of mandatory spares to be furnished in 1.01Tag no-1P30-CC-1227 |
| 2 | Mandatory Spares for item no.1.00,Naphtha Stabilizer, Scope as per material requisition. |
| 3 | TRANSPORTATION: (For Item no. 1.00)-Naphtha StabilizerTransportation to be made in 2 pieces with complete shell including partial skirt ( with dish end to skirt welding at shop) as one piece andremaining length ofskirt as other piece (skirt to skirtsite joint to be considered by supplier )For Indegenious Bidders : Inland transportation charges by road of all supplies from Vendor’s works toProject Site, Numaligarh Refinery, Golaghat, Asaam, ( Excluding GST) |
| 4 | CIF value of Import Content against S.no-1.0, Naphtha Stabilizer(To be quoted by INDIAN BIDDERS ONLY ). |
| 5 | Lean Oil Absorber including U Stamp inepction, Erection & Commissioing spares, special tools & teckles,, scope as defined in material requisition but excluding mandatory spares. Cost of mandatory spares to be furnished in 2.01Tag no-1P30-CC-1326 |
| 6 | Mandatory Spares for item no.2.00, HDT HP/MT Separator Scope as per material requisition. |
| 7 | TRANSPORTATION: (For Item no. 2.00)-Lean Oil AbsorberTransportation to be made in 2 pieces with complete shell including partial skirt ( with dish end to skirt welding at shop) as one piece andremaining length ofskirt as other piece (skirt to skirtsite joint to be considered by supplier )For Indegenious Bidders : Inland transportation charges by road of all supplies from Vendor’s works / shop to directly to Project Site, Numaligarh Refinery, Golaghat, Asaam, ( Excluding GST). |
| 8 | CIF value of Import Content against S.no-2.0, Lean Oil Absorber(To be quoted by INDIAN BIDDERS ONLY ). |
| 9 | Sponge Oil Absorber IncludingU Stamp inepction, Erection & Commissioing spares, special tools & teckles, scope as defined in material requisition but excluding mandatory spares. Cost of mandatory spares to be furnished in 3.01Tag no-1P30-CC-1327 |
| 10 | Mandatory Spares for item no.3.00, Sponge Oil Absorber,Scope as per material requisition. |
| 11 | TRANSPORTATION: (For Item no. 3.00)-Sponge Oil AbsorberFor Indegenious Bidders : Inland transportation charges by road of all supplies from Vendor’s works / shop to directly to Project Site, Numaligarh Refinery, Golaghat, Asaam, ( Excluding GST) |
| 12 | CIF value of Import Content against S.no-3.0,Sponge Oil Absorber(To be quoted by INDIAN BIDDERS ONLY ). |
| 13 | Diesel Stripper IncludingU Stamp inepction, Erection & Commissioing spares, special tools & teckles, scope as defined in material requisition but excluding mandatory spares. Cost of mandatory spares to be furnished in 4.01Tag no-1P31-CC-2628 |
| 14 | Mandatory Spares for item no.4.00, Diesel Stripper,Scope as per material requisition. |
| 15 | TRANSPORTATION: (For Item no. 4.00)-Diesel StripperFor Indegenious Bidders : Inland transportation charges by road of all supplies from Vendor’s works / shop to directly to Project Site, Numaligarh Refinery, Golaghat, Asaam, ( Excluding GST) |
| 16 | CIF value of Import Content against S.no-4.0,Diesel Stripper(To be quoted by INDIAN BIDDERS ONLY ). |
| 17 | Unit rate forSupervision Sevices of skirt fitup, welding, NDT /erection and commissioning / Performance testing as per details mentioned in material requisition for quoted items as per enclosed instructions to vendor Per Diem charges upto 8 hrs on normal working days. ( BIDDERS TO QUOTEUNIT RATE FOR DIEM CHARGES ) |
| 18 | Unit rate forSupervision Sevices of skirt fitup, welding, NDT /erection and commissioning / Performance testing as per details mentioned in material requisition for quoted items as per enclosed instructions to vendor Overtime rate per hour (beyond normal 8 hours on normal working days).( BIDDERS TO QUOTE OVER TIMERATE PER HOUR ) |
| 19 | Unit rate forSupervision Sevices of skirt fitup, welding, NDT /erection and commissioning / Performance testing as per details mentioned in material requisition for quoted items as per enclosed instructions to vendor Overtime rate per hour for work on weekly off days / holidays (as applicable to Refinery Site). ( BIDDERS TO QUOTE OVER TIMERATE PER HOUR ) |