| 1 | Construction of Bathroom in all respects(works like slab ,door ventilators of height 7 feet of dimension 8 feet x 6 feet ) and Septic Tank ( of Size 8 feet x 6 feet x 6 feet) as per standard design on already laid plinth , in9 inch brick worksincluding sanitary fitting complete( bibcocks, washbasin, seat complete job) , tile work on internal wall and on floor etc. along with handle pillar, including GI pipe fittings , PVCpipe for sewerage including construction of manholes along with their covers upto Septic Tank and including Plumbing Works complete as per the direction of site engineer incharge. Complete job. |
| 2 | Providing and placing of 3 layer PVC water tank of capacity 1000 L(Sintex MAKE )on bathroom roof slab. Complete job |
| 3 | Construction of 1 No. Septic tank 8\"0\"x 8\"0\"x8.0\" =512 sft |
| 4 | Construction of 1 No.under ground water tank (7\"0\"x 7\"0\"x7.0\")= 343 sqft |
| 5 | Deweeding of vegetation in outdoor yardRemoving of stone metal dewedding of unwanted vegetation spreading of stone metal collected earlier for removal of vegetation, levelling the area with existing stone metal |
| 6 | Providing of additional stone metaland its carriage and levelling in outdoor yard . This include breaking of stonecomplete job . |
| 7 | Dismantling door, windows and clerestory windows including chowkhats etc complete and stacking with in 50 m lead and providing and fixing anodized aluminium work for door, windows and partition with extruded buct up standard tublar and other section of approved make conforming to IS 733 of IS 1285 anodized tranpart to dyed to required shade according to IS 1868 fixed with rawl plugs and screws or with fixing clipper with expansion hold fasten as including filling up of gaps at junction at top bottom andsides with required PVC.. The dismaatling and replacement quantity shall be as per the directions of the concerned incharge site Engineer. |
| 8 | Repair and replacement of worn out internal elecrtification point(light / power )wiring of control room building complete in all respect including replacement of existing wiring and worn out electrical accessories including main board. |
| 9 | Distempering with dry distemper of approved brand and manufacture two or more coat and of required shade on new work over and including priming coat of whiting to give an even shade |
| 10 | Finishing walls with water proofing cement paint of required shade old work applied (Outside of control room |
| 11 | Providing and fixing false ceiling with 12 mm thick plain/ semiperforated or with design ceiling tiles of BWP type phenolformaldehyde synthetic resin bonded pressed particle board - *conforming to 18:3087, finished with a coat of aluminium primer on both sides & edges, including two coats of synthetic enamelpaint of approved quality on exposed face, fixed to a grid made out of anodised aluminium (with 15 micron anodic coating) Tsections 35 x15x1.5 mm size main runners, cross runners 23.5x19x1.5 mm fixed tomain runners placed 600 mm centre to centre both ways so as to form a grid of 600 mm square. The frame work shall be suspended from ceiling by level adjusting hangers of 6 mm dia M.S rod fixed to roof slab by means of ceiling cleats and dash fastener. The suspenders shall be placed 600 x 1200 mm centre to centre including fixing to the frame with C.P brass screws and applying a priming coat of zinc chromate yellow primer (aluminium frame work shall be paid separately. |
| 12 | Repairing of roof ceiling of control room building by way of supply and replacing damaged (approx 8 CGI sheets heavy duty) , repairing of holding hooksand bitumin washers to stop water leakage Complete job. |
| 13 | Providing and Fixing of 80 watt Street light Fixtures complete with cable etc of make Phillips, Bajaj etc. |
| 14 | Supply of Heay Duty foldable/collapsible typeAluminium Ladder of length 30 feet |