| 1 | 1 | Earthwork in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc (not exceeding 1.5m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, includidng dressing of sides and ramming of bottoms lift upto 1.5m including getting out excavated earth and disposal of surplus excavated earth as directed within a lead of 50m : in all kinds of soils | | 200.66 | cum |
|---|
| 2 | 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | | 18.54 | cum |
|---|
| 3 | 3 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, column, pillars, piers, abutments, posts and struts etc. upy floor five level excluding cost of centering, shuttering, finishing and reinforcement: (1:1.5:3) 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size). | | 130.6 | cum |
|---|
| 4 | 4 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. (Thermo-Mechanically treated bars.) | | 13060 | MT |
|---|
| 5 | 5 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundation,Plinth Beam, footing bases of column | | 121.86 | sqm |
|---|
| 6 | 6 | Random Rubble masonry with hard stone from quarry in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement:6 coarse sand :12 graded stone aggregate 20 mm nominal sizer ) upto plinth level with cement mortar 1:6 ( 1 cement :6 coarse sand) QUARRY | | 25.93 | cum |
|---|
| 7 | 7 | Dry random rubble masonary with hard stone in foundation and plinth without bond stone | | 32.96 | cum |
|---|
| 8 | 8 | Providing and laying damp proof course 40mm thick with cement concrete 1:2:4 ( 1 cement : 2 coarse sand: 4 graded stone aggregate 12.5mm nominal size) and curing complete | | 106.47 | sqm |
|---|
| 9 | 9 | Providing and fixing upto floor five level precast cement concrete solid blocks including hoisting and setting in position in position in cement mortar 1:3 , cost of required centering centering, shuttering and curing complete 1:3:6 ( 1 cement : 3 coarse sand : 6 stone aggregate 20mm nominal size | | 76.15 | cum |
|---|
| 10 | 10 | Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fastners of required dia and length (hold fast lugs or with dash fastners shall be paid for separately). Second class kail wood | | 3.8 | cum |
|---|
| 11 | 11 | Providing and fixing panelled or panelled and glazed shutters for doors, windows and clerestory windows including ISI marked M.S pressed Butt hinges bright finished of required size with necessary screws excluding panelling which will be paid for seperately all complete as per direction of engineer-in-charge. Second Kail Wood 35mm thick | | 27.38 | sqm |
|---|
| 12 | 12 | Providing and fixing 35mm thick wire gauge shutters using galvanized M.S wire gauge of average width for aperture 1.4 mm in both direction with wire of dia. 0.63 mm for doors, windows and clerestory windows with hinges and necessary screws. Second kail wood. | | 27.38 | sqm |
|---|
| 13 | 13 | Providing and fixing glazed shutters for doors, windows and clerestory windows using 4mm thick float glass panes including ISI marked pressed butt hinges bright finished of required size with necessary screws. Second class kail wood: 35mm thick | | 5.24 | sqm |
|---|
| 14 | 14 | Cement Plaster in two coats : 15mm cement plaster on the rough side of single or half brick wall of mix: 1:4 ( 1 cement : 4 fine sand (internal plastering) | | 76.15 | sqm |
|---|
| 15 | 15 | Providing and applying plaster of paris putty of 2mm thickness over plastered surface to prepare the surface smooth and even complete (internal plastering) | | 76.15 | sqm |
|---|
| 16 | 16 | Cement Plaster in two coats : 15mm cement plaster on the rough side of single or half brick wall of mix: 1:4 ( 1 cement : 4 fine sand) (External Plaster) | | 59.03 | sqm |
|---|
| 17 | 17 | Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade on New work over and including primingn coat of water thinnable cement primer (Internal) | | 76.15 | sqm |
|---|
| 18 | 18 | Finishing walls with textured exterior paint of required shade on new work (two or more coats applied @ 3.28 l/10sqm) over and including base coat of exterior primer applied @ 2.20 kg/10 sqm) (External) | | 59.03 | sqm |
|---|
| 19 | 19 | Wooden flooring tongued and grooved in flooring including fixing with iron screws complete: 12 mm thick | | 66.89 | sqm |
|---|
| 20 | 20 | Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer with water absorption less than 0.08% and condormation to IS 15622 of approved make in all colours and shades laid on 20mm tick cement mortar 1:4 including groutng the joints with shite cement and matching pgiments etc ciomplete : size of tiles 500x500 | | 8.26 | sqm |
|---|
| 21 | 21 | Providing and fixing 1st class quality cermaic glazed tiles conforming to IS 15622 of approved make in all colours, shades expect burgundy, bottle green black of any thickness as approved byn Engineer-In-charge in skirting, risers in steps and dado over 12mm thck bed of cement mortar 1:3 and jointng with grey cement slurry in all complete job | | 56.11 | sqm |
|---|
| 22 | 22 | Add 12.50 % of total costs for electric fittings | | 0.125 | % |
|---|
| 23 | 23 | Add 7.5 % of total costs for sanitary fittings | | 0.075 | % |
|---|
| 24 | 24 | Add 3.5% for W.C and contingence | | 0.035 | % |
|---|
| 25 | 25 | Add 1% labour cess | | 0.01 | % |
|---|