| 1 | 1 | Cost of the Machine\n\n1) Main machine press with automatic material feeding, pallet feeding, pallet dispatch, 5500-6500 bricks/8 hrs. 04 bricks/stroke, vibration motor 1 HP Crompton. (1 no. of 1 HP)\n2) Belt conveyor 17 feet long and 500mm width grade M25 (1 no. of 2 HP)\n3) Standard bricks or block die punch set\n(9 x 4 x 3 or 4 x 4 x 4) (1 Set)\n4) Hydraulic Power Pack Crompton/ABB Motors haws pipe with Yuken/Rexroth Valves and Polyhedron Pump (1 no. of 7.5 HP)\n5) PLC controlled panel box (Siemens) (Delta HMI) (1 no.)\n6) Pan mixture with capacity of 500 kg with rollers and scarpers with standard gear box, Crompton/ABB Motors (2 nos. of 5 HP) | BI01010001010000000000000515BI0100001112 | 3 | Set |
|---|
| 2 | 2 | Automatic bricks pallet stacker with 3 nos. hydraulic trolly (Auto-Stacking) (1 Set of 3 HP) | BI01010001010000000000000515BI0100001113 | 3 | Set |
|---|
| 3 | 3 | Extra die punch (Bricks) | BI01010001010000000000000515BI0100001114 | 3 | nos. |
|---|
| 4 | 4 | Goods & Services Tax (G.S.T.) @ 18% | BI01010001010000000000000515BI0100001115 | 3.204e+06 | Rs. |
|---|
| 5 | 5 | Civil Construction\n\nEarth work in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance up to 50M including all lifts with leveling, ramming the foundation trenches, removing roots of trees, shrubs all complete as per approved design, building specification and direction of E/I. | BI01010001010000000000000515BI0100001116 | 21.84 | M3 |
|---|
| 6 | 6 | Extra for earth work in hard soil as per specification and direction of E/I. (vide classification of soil item B) | BI01010001010000000000000515BI0100001117 | 21.84 | M3 |
|---|
| 7 | 7 | Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials, labours, royaly and taxes all complete as per building specification and direction of E/l. | BI01010001010000000000000515BI0100001118 | 20.664 | M3 |
|---|
| 8 | 8 | Providing designation 75B one brick flat soling joints filled with local sand including cost of watering taxes, royalty all complete as per building specification and direction of E/I. | BI01010001010000000000000515BI0100001119 | 20.49 | M2 |
|---|
| 9 | 9 | Providing average 150mm. thick dry rammed khoa beaten to 112mm (compacted with water) made of well burnt or jhama bricks including ramming properly till compacted thickness is achieved curing with carriage of water with all leads making proper slope and binding the top with cement mortar (1:10) all complete as per building specification and direction of E/I. | BI01010001010000000000000515BI0100001120 | 250.83 | M2 |
|---|
| 10 | 10 | Providiag designation 75B brick work in Cement Mortar (1:6) in superstructure with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth, curing taxes and royalty all complete job as per building specificition and direction of E/l. | BI01010001010000000000000515BI0100001121 | 5.841 | M3 |
|---|
| 11 | 11 | Providing P.C.C. M-150 with nominal mix of (1:2:4) in foundation with approved quality of stone chips 20mm to 6mm size graded and clean coarse sand of requisite F.M (2.5 to 3) including screening, shuttening, mixing cement concrete in mixer and placing in position, vibriting, striking, curing taxes and royalty all complete as per building specification and direction of E/l. | BI01010001010000000000000515BI0100001122 | 5.124 | M3 |
|---|
| 12 | 12 | Providing R.C.C. M-150 with nominal mix of (1:2:4) in foundation and plinth with approved quality of stone chips 20mm to 6mm size graded and clean coarse sand of F.M (2.5 to 3) including screening, shuttening, mixing cement concrete in mixer and placing in position, vibriting, striking, curing (but excluding the cost of reinforcement) taxes and royalty all complete as per building specification and direction of E/l. | BI01010001010000000000000515BI0100001123 | 7.83 | M3 |
|---|
| 13 | 13 | Providing R.C.C. M-150 with nominal mix of (1:2:4) in column with approved quality of stone chips 20mm to 6mm size graded and clean coarse sand of requisite F.M (2.5 to 3) including screening, shuttening, mixing cement mortar in mixer and placing in position, vibriting, striking, curing (but excluding the cost of reinforcement) tax and royalty all complete as per building specification and direction of E/l. | BI01010001010000000000000515BI0100001124 | 2.46 | M3 |
|---|
| 14 | 14 | Providing TMT steel reinforcement 8mm, 10mm, 12mm & 16mm dia bars as per approved design and drawing excluding carriage of M.S bar to work site, cutting, bending end binding with annealed wire with cost of wire removal of rust placing the rods in position all complete as per building specification and direction of E/I.\n8mm dia | BI01010001010000000000000515BI0100001125 | 0.276 | MT |
|---|
| 15 | 14.01 | 12mm dia | BI01010001010000000000000515BI0100001126 | 0.828 | MT |
|---|
| 16 | 15 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | BI01010001010000000000000515BI0100001127 | 5044.23 | Kg. |
|---|
| 17 | 16 | Labour for fabricating, erection, hoisting and fixing in position structural steel work in R.S. joist, channel, angle, tee, flat, plate, lattice member built up compound section in column, girder staircase or truss including cost of gusset plate at all heights and depths bolting welding (machining wherever necessary) with applying a priming coat of red lead paint all complete as per approved drawing, building specification and direction of E/I. | BI01010001010000000000000515BI0100001128 | 5.043 | MT |
|---|
| 18 | 17 | Providing 12 mm thick cement plaster (1:6) with clean coarse sand of F.M. 1.5 including screening, curing with all leads and lifts of water, scaffolding, taxes and royalty all complete as per specification and direcition of E/l. | BI01010001010000000000000515BI0100001129 | 45.99 | M2 |
|---|
| 19 | 18 | White washing three coat over new surface with approved quality of lime including cost of cleaning surface thoroughly and removing the scales of smoke and ash marks with jhama rubbing, scaffolding, washing of floors and taxes all complete as per specification and direction of E/I. | BI01010001010000000000000515BI0100001130 | 45.99 | M2 |
|---|
| 20 | 19 | Supplying corrugated 6mm thick 1.50m to 3.05m C.A. sheet for roof covering of shed all complete as per specification and direction of E/I. | BI01010001010000000000000515BI0100001131 | 267.54 | M2 |
|---|
| 21 | 20 | Labour for fitting and fixing GCI or CA sheet roofing in proper slope including the cost of ’J’ or ‘L’ hooks, limpel and bitumen washers, carriage of sheets to work site and taxes all complete as per building specification and direction of E/I. | BI01010001010000000000000515BI0100001132 | 267.54 | M2 |
|---|
| 22 | 21 | Providing ridges or hips of width 60 cm overall width plain G.S. sheet fixed with polymer coated J or L hooks, bolts and nuts 8 mm dia G.I. limpet and bitumen washers complete.\n0.63 mm thick with zinc coating not less than 275 gm/m² | BI01010001010000000000000515BI0100001133 | 28.5 | M |
|---|
| 23 | 22 | Carriage of materials by diesel truck including loading at source, unloading at work site and stacking properly, labour etc. all complete as per direction of E/I.\n\nCement - Lead 5 km | BI01010001010000000000000515BI0100001134 | 24.621 | MT |
|---|
| 24 | 22.01 | Steel - Lead 5 km | BI01010001010000000000000515BI0100001135 | 6.15 | MT |
|---|
| 25 | 22.02 | Bricks - Lead 18 km | BI01010001010000000000000515BI0100001136 | 3036 | nos. |
|---|
| 26 | 22.03 | Sand - Lead 15 km | BI01010001010000000000000515BI0100001137 | 15.585 | M3 |
|---|
| 27 | 22.04 | Stone Chips - Lead 25 km | BI01010001010000000000000515BI0100001138 | 25.152 | M3 |
|---|
| 28 | 23 | Goods & Services Tax (G.S.T.) @ 12% | BI01010001010000000000000515BI0100001139 | 791802 | Rs. |
|---|
| 29 | 24 | Labour Cess @ 1% | BI01010001010000000000000515BI0100001140 | 886818 | Rs. |
|---|
| 30 | 25 | Other Expanses\n\nWooden Pallet - 600mm x 300mm x 18mm | BI01010001010000000000000515BI0100001141 | 5250 | nos. |
|---|
| 31 | 26 | Submersible Pump | BI01010001010000000000000515BI0100001142 | 3 | nos. |
|---|
| 32 | 27 | Bore Well | BI01010001010000000000000515BI0100001143 | 3 | nos. |
|---|
| 33 | 28 | Power Backup (10 KVA Diesel Generator) | BI01010001010000000000000515BI0100001144 | 3 | nos. |
|---|
| 34 | 29 | Goods & Services Tax (G.S.T.) @ 18% | BI01010001010000000000000515BI0100001145 | 2.7285e+06 | Rs. |
|---|
| 35 | 30 | Working Capital\n\nCost of Raw Material | BI01010001010000000000000515BI0100001146 | 90 | days |
|---|