}

Supply Installing Commissioning Of Hvac Services For Modular Operation Theaters, Faridkot-Punjab

Baba Farid University Of Helath Sciences has published Supply Installing Commissioning Of Hvac Services For Modular Operation Theaters. Submission Date for this Tender is 18-06-2021. HVAC Tenders in Faridkot Punjab. Bidders can get complete Tender details and download the document.




Tender Notice

28146775
Supply Installing Commissioning Of Hvac Services For Modular Operation Theaters
Open Tender
Indian
Punjab
Faridkot
18-06-2021

Tender Details

Supply Installing Commissioning Of Hvac Services For Modular Operation Theaters

Key Value

Document Fees
INR 3540 /-
EMD
INR 199200.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: Supply installing, Testing & Commissioning of HVAC Services for Modular Operation Theaters Floor of Super Speciality Block in GGS Medical College & Hospital, Faridkot
Sl. No. Item Description Item Code / Make Quantity Units
1 1 EQUIPMENT\nSupply, Installation, Testing and Commissioning of Air cooled scroll type water chilling machine with Variable speed drive each having a capacity as specified below at specified parameters, suitable for operation on refrigerant R-410A/R407C for scroll type machine each comprising of the following complete as per specifications and as required. Quoted price shall include price of Variable Frequency Drive starter of suitable capacity. Multiple invertor based compressor complete with safety switches, forced feed lubrication system etc. as per specifications.Suitable capacity squirrel cage induction motor with class 'B' insulation suitable for operation on 415 +- 10% volts, 50Hz, A.C. supply. Unit Mounted VFD Starter of suitable capacity. Necessary drive arrangement. 1 set - Lubrication device consisting of automatic electric oil pump, oil cooler, head tank, oil strainer, and automatic pressure regulating valve, oil heater, oil heater thermal switch etc. as per specifications. 1 no. - Matching Air cooled condenser with evaporater integrally finned copper tubes.1 Lot - Refrigerant piping fittings, valves and accessories to inter connect compressor, condenser, chiller and expansion valve.1 set - Microprocessor based control panel complete with accessories as per specifications. Lot - Refrigerant line accessories comprising of safety valves, angle valve, liquid line indications, liquid level control etc. Lot - Water flow switches at outlet of evaporator & water drain, air purge valves, thermometers and pressure gauges wherever required. Lot - Suction line and chiller insulation with minimum 19 mm thick polyvinyl nitrile rubber insulation complete as required. Lot- Frame work for mounting the above condenser, chiller compressor and motor with base plate complete with anti-vibration pads/springs.Lot- Initial/first charge of refrigerant gas & compressor oil. Lot- RCC / cement concrete foundation for the chilling unit. Chilling machine described above, as per specifications and complete in all respects for the operating parameters as given under. Capacity 60 TR At Site conditions. Chilled Water IN 54°F. Chilled Water OUT 44°F. Chilled water Flow 144 US GPM. Fouling Factor 0.0005 FPS . Fully assembled machine at works. Chilling machines as described above . (Make as per DNIT page No.84-87) item 1 3 Nos.
2 2 Supply, Installation, testing and commissioning of double skin construction draw thru type AIR HANDLING UNITS each complete with parts as described here under having coil of copper tube & aluminium fins construction, belt drive and vibration isolators. Coil size shall be selected for a maximum face velocity of 500 feet / minute. Motor shall be suitable for 415±10% volts, 50 cycles, 3 phase AC supply.he Floor mounted AHU with Themal Break Profile shall be having minimum panel thickness of 40 mm (suitable for outdoor installation) with following parts. Mixing Box with zero leakage dampers, Prefilter section with prefilters, 6 Row cooling coil, 2 Row Heating Coil , 125 mm Static Backward curved DIDW / Plug type blower with TEFC high efficiency motor, Fine filter section with fine filters, supply air dampers.\n6000 CFM (OT 1,2 &3,4) item 2 2 Nos.
3 3 3000 CFM (OT 5) item 3 1 Nos.
4 4 The Vertical Floor mounted AHU with Themal Break Profile shall be having minimum panel thickness of 25 mm with following parts. Prefilter section with prefilters, 6 Row cooling coil, 60 mm Static Backward curved DIDW/ Plug type blower with TEFC high efficiency motor, Fine filter section with fine filters, supply air dampers.\n2500 CFM ( passage TF) item 4 1 Nos.
5 5 The Ceiling suspended AHU with Themal Break Profile shall be having minimum panel thickness of 40 mm with following parts. Prefilter section with prefilters, 6 Row cooling coil, 55 mm Static Backward curved DIDW/ Plug type blower with TEFC high efficiency motor, Fine filter section with fine filters, supply air dampers.\n2500 CFM ( Sterile Corridor, Post OT) item 5 1 Nos.
6 6 The Ceiling Suspended AHU with Themal Break Profile shall be having minimum panel thickness of 40 mm with following parts. Prefilter section with prefilters, 6 Row cooling coil, 40 mm Static forward curved DIDW/ Plug type blower with TEFC high efficiency motor.\n2500 CFM item 6 1 Nos.
7 7 Supply, installation, testing and commissioning of 2-way motorized valves suitable for Chilled water as well as hot water application complete with Electrical / Electronic actuator, necessary wiring and required accessories for proper operation and control of valves of following sizes. (Vendor to submit the Selection sheets of the Control Valves for all sizes individually)\n65mm dia pipe /50 mm 3 way valve item 7 2 Nos.
8 8 50mm dia pipe /40 mm 3 way valve item 8 6 Nos.
9 9 40 mm dia pipe /32 mm 3 way valve item 9 1 Nos.
10 10 Supply, installation, testing and commissioning of cooling / heating thermostats for various Air Handling Units as per specifications including all accessories, mountings, wiring between thermostat & unit, terminations etc., complete in all respect as required and as per specifications.\nProportional thermostats for Air Handling Units item 10 6 Nos.
11 11 Supplying, installing, testing and commissioning of Fan coil unit, each complete with 3 rows deep chilled water coil, centrifugal fans, cleanable fabric filters, main condensate drain pans, auxiliary drain pan, as described in specifications, casing, coil piping connections, through copper pipes, condensate drain connections, wiring, control wiring in conduit upto thermostat boxes. All fan coil units shall be suitable for 220 + 6% volts, 50 cycles, single phase power supply. Fan Coil Units shall be of following refrigeration capacities as listed.\n2.0 TR nominal capacity item 11 4 Nos.
12 12 1.5 TR nominal capacity item 12 1 Nos.
13 13 1.0 TR nominal capacity item 13 4 Nos.
14 14 Supply, installation, testing and commissioning of controls for fan coil units consisting of 2-way motorized spring return valves, Snap acting type heating/cooling thermostat with fan speed switch, wiring etc.\n25 mm dia valve item 14 5 Nos.
15 15 20 mm dia valve item 15 4 Nos.
16 16 Supplying, installing, testing and commissioning of CENTRIFUGAL MONOBLOC END SUCTION PUMPS, factory mounted on a common base with electric motor for recirculation of water for the central air conditioning system.  End suction design, in cast iron/ bronze fitted construction specifically designed for quiet operation for chilled water cooling systems as shown in the drawings. All pumps shall be provided with mechanical seal and aligned properly as required. The pump motor shall be suitable for 415 + 10% volts, 50 cycles, 3 phase power supply. The quoted price shall include cost of thermal insulation and cladding of pumps. Pumps with performance characteristics as given below:\nChilled Water pumps \n1 No MONOBLOC type pump.\n1 No. Suitable HP, TEFC squirrel cage induction motor with class 'F' insulation, 2900 rpm, operating on 415 +/- 10% volts, 3 phase, 50 Hz A.C. supply.Lot - Expended Polystyrene (TF quantity) insulation not less than 50mm thick duly cladded between aluminum sheets of 0.5mm thickness and properly clamped to pump in two semicircular sections as per specifications.\n2 nos. - 150 mm dia. dial type pressure gauges.\nLot - Mounting frame with Anti vibration pads.\nLot - RCC/cement concrete foundation for the pump unit.\nOperating parameters\nWater flow rate = 144 USGPM \nHead = 92 Ft. of water /28 M\nMotor HP = 7.5 (Suggested)\nQuantity indicated includes one standby\n item 16 2 Nos.
17 17 Hot Water pumps \n1 No MONOBLOC type pump.\n1 No. Suitable HP, TEFC squirrel cage induction motor with class 'F' insulation, 2900 rpm, operating on 415 +/- 10% volts, 3 phase, 50 Hz A.C. supply.\nLot - Expended Polystyrene (TF quantity) insulation not less than 50mm thick duly cladded between aluminum sheets of 0.5mm thickness and properly clamped to pump in two semicircular sections as per specifications.\n2 nos. - 150 mm dia. dial type pressure gauges.\nLot - Mounting frame with Anti vibration pads.\nLot - RCC/cement concrete foundation for the pump unit.\nOperating parameters\nWater flow rate = 90 USGPM \nHead = 92 Ft. of water /28 M\nMotor HP = 5 (Suggested)\nQuantity indicated includes one standby item 17 2 Nos.
18 18 Supplying, installation, testing and commissioning of electrical HW generator equipped with sufficient number of electrical immersion heaters. The pressure vessel shall be constructed and insulated on all sides with 100 mm thick fiber glass and cladded with 0.80 mm aluminum sheet in a neat and clean manner. The generator shall be equipped with all automatic and safety controls such as manual reset high temperature water outlet, step controller and recycling relay, 'ON' 'OFF' switch thermostats, pilot light, low water cutoff and other controls as per manufacturers recommendations. All controls and terminals shall be located in an integral control cabinet factory wired and tested. The generator shall be suitable for 415 (+)/(-) 10% volts, 50 cycle, 3 phase power supply. The entire generator shall be factory assembled and tested at 350 PSI pressure. The Hot Water Generator shall be of following capacity made of 8mm MS sheet and dish end made of 10mm MS having 16 gauge stainless steel lining with heaters arranged in banks and controlled by electronic Controller and Thermostats so that hot water is generated at 55 Deg C with nominal variation including necessary controls including inlet and outlet connections for water as per specifications complete with pressure release valve, low level cut-out. Autovent sight-glass, foundation for HWG as per specifications complete as required.100 KW item 18 1 Nos.
19 19 Supply, installation, testing and commissioning of an insulated roof mounted chilled water expansion tank of PVC construction. The tank shall be complete with necessary connection for piping. Insulation shall be 50 mm thick expanded polystyrene covered with sand cement plaster. Each tank shall be of capacity minimum 1000 liters. item 19 1 Nos.
20 20 Supply, installation, testing and commissioning of Humidistats for various Air Handling Units as per specifications including all accessories, mountings, wiring between Humidistat & unit, terminations etc., complete in all respect as required and as per specifications. item 20 3 Nos.
21 21 Supply Installation Testing and commissioning of SS pan type Humidifier with controls, immersion type heaters, controls and humidistat. 6 KW item 21 3 Nos.
22 22 Supply, installation, testing and commissioning of Inline ducted Fans with casing suitable for outdoor application for Fumigation/ Exhaust. 600 CFM item 22 5 Nos.
23 23 300 CFM item 23 2 Nos.
24 24 100 CFM item 24 2 Nos.
25 25 Supply, installation, testing and commissioning of wall mounted propellor fans with casing suitable for exhaust. The dia of fan is 225 mm. item 25 5 Nos.
26 26 PIPING\nMS Chilled water Pipe\nSupply, fixing in position, testing and commissioning of the following Below ground/Over ground MS class ‘C’ pipes of following diameter cut to required lengths and installed with all welded joints, complete with the necessary fittings like elbows, tees and reducers, sockets etc. excluding valves for Chilled / Hot water lines but including insulation as per specifications.\n100 mm dia MS pipes item 26 90 Rmt.
27 27 80 mm dia MS pipes item 27 110 Rmt.
28 28 65 mm dia MS pipes item 28 30 Rmt.
29 29 50 mm dia MS pipes item 29 30 Rmt.
30 30 40 mm dia MS pipes item 30 110 Rmt.
31 31 32 mm dia MS pipes item 31 40 Rmt.
32 32 25 mm dia MS pipes item 32 50 Rmt.
33 33 20 mm dia MS pipes item 33 30 Rmt.
34 34 Providing and fixing in position the following Butterfly Valves duly insulated as per specifications.\n100 mm dia valves item 34 5 Nos.
35 35 80 mm dia Valves. item 35 18 Nos.
36 36 65 mm dia Valves. item 36 4 Nos.
37 37 50 mm dia Valves. item 37 8 Nos.
38 38 Providing and fixing in position following Balancing Valves duly insulated as per specifications.\n100 mm dia Valves. item 38 1 Nos.
39 39 80 mm dia Valves. item 39 5 Nos.
40 40 65 mm dia Valves. item 40 2 Nos.
41 41 50 mm dia Valves. item 41 4 Nos.
42 42 Providing and fixing in position following Check Valves duly insulated as per specifications.\n100 mm dia valves item 42 3 Nos.
43 43 Providing and fixing in position following Y-Strainer duly insulated as per specifications.\n100 mm dia item 43 6 Nos.
44 44 65 mm dia item 44 6 Nos.
45 45 50 mm dia item 45 4 Nos.
46 46 Supply Installation Testing of Ball Valve set with and without Strainer for Fan coil units\n25 mm dia item 46 5 Nos.
47 47 20 mm dia item 47 4 Nos.
48 48 Supplying, installation, testing and commissioning of Auto air vents. item 48 10 Nos.
49 49 Providing and fixing in position the industrial type pressure gauges with gun metal ball valves. item 49 24 Nos.
50 50 Providing and fixing in position the mercury-in- glass industrial type thermometers. item 50 16 Nos.
51 51 Providing and fixing in position the following PVC ( Min 3 mm thick) Heavy duty pipes cut to required lengths and installed with all screwed joints with the necessary elbows, tees and reducers etc duly insulated with 6 mm thick insulationas per specifications.\n50mm dia pipes item 51 10 Rmt.
52 52 40mm dia pipes item 52 50 Rmt.
53 53 32 mm dia pipes item 53 40 Rmt.
54 54 25 mm dia pipes item 54 30 Rmt.
55 55 Providing and fixing in position flow switch item 55 2 Nos.
56 56 AIR DISTRIBUTION\nSupply, Fabrication, installation and testing of sheet metal ducts in accordance with the approved shop drawings and as required by the specifications.\n24 gauge GI sheet steel item 56 150 Sqm.
57 57 22 gauge GI sheet steel item 57 100 Sqm.
58 58 20 gauge GI sheet steel item 58 50 Sqm.
59 59 Supply, Fabrication, installation and testing of sheet metal ducts in accordance with the approved shop drawings and as required by the specifications.\n22 gauge aluminium sheet steel item 59 80 Sqm.
60 60 20 gauge aluminium sheet steel item 60 80 Sqm.
61 61 Supply, fabrication, installation and testing the flexible connections constructed of fire resistance flexible double canvas sleeve as per the approved shop drawings. item 61 15 Nos.
62 62 Supply, installation and testing of GI construction Louver dampers within ducts to be provided with suitable ducts lever and quadrants for manual control of volume of air flow and for proper balancing of the air distribution system. item 62 3 Sqm.
63 63 Fire Damper with Control Mechanism\nSupplying, fixing, testing and commissioning of motor actuated Fire Dampers of at least 1.5 hour fire rating in supply air duct at wall crossing of AHU room/as and where required, of requires sizes including control wiring. The damper shall be motorized and spring return so as to close the damper in the event of a fire signal which shall be provided by smoke sensor/detector in AHU room as per specifications and as required. The spring return action shall be in-built mechanism and not externally mounted. The control wiring shall be interlocked ion such a way that along with actuation of damper-closing mechanism, the AHU fan motor gets automatically switched off. Fire damper as described above, as per specifications and complete in all respects. item 63 3 Sqm
64 64 Electric Actuator\nElectric actuator with necessary linkage to actuate fire dampers complete with required wiring and associated accessories.\nNote: Fire dampers shall be supplied with sensors/actuators/control etc duly factory fitted and tested at manufacturers works and certificate to this effect produced along with delivery of fire damper. item 64 5 Nos.
65 65 Supply, installation, testing and balancing of powder coated extruded aluminum construction Discreet Air Grilles without volume control dampers. item 65 5 Sqm
66 66 Supply, installation, testing and balancing of powder coated extruded aluminum construction Linear Air Grilles without volume control dampers. item 66 5 Sqm
67 67 Supply, installation, testing and balancing of powder coated extruded aluminum square shape ceiling diffusers with removable core and anti smudge ring & aluminum volume control dampers as per specifications item 67 5 Sqm.
68 68 Supply, installation, testing and balancing of Powder coated extruded aluminium construction square shape return air diffusers with removable core, anti smudge ring & without volume control damper as per specifications. item 68 5 Sqm
69 69 Supplying & fixing of opposed blade aluminium construction volume control dampers in supply air duct collars as per approved drawings and specifications. item 69 8 Sqm.
70 70 Supply, installation, testing and balancing of inlet air louvers with bird screen and volume damper for fresh air in powder coated extruded aluminium construction as per specifications and approved shop drawings. item 70 2 Sqm.
71 71 THERMAL INSULATION\nSupply, installation and testing of acoustic lining with 12 mm thick fiber glass rigid board in supply air ducts as per the specifications. item 71 50 Sqm
72 72 Supply and fixing of UL approved thermal insulation on AC ducts with 13 mm thick closed cell Nitrile rubber Class O insulation including providing adhesive, adhesive tapes etc. as per specifications. item 72 250 Sqm
73 73 Supply and fixing of UL approved thermal insulation as above, but 19mm thick coverd with 2 layers of Glass cloth soaked in star bond/equivalent UV Protection material as per direction of Engineer Incharge/ Consultant. In addtion the Insulation exposed to whether shall have 2 layers of Glass cloth soaked in star bond/equivalent UV Protection material as per direction of Engineer Incharge/ Consultant. item 73 100 Sqm
74 74 Electrical work \nScope of work shall include control panels, power / control cabling/ wiring/ GI earthing from Control Panel to various equipment and their starters like package chillers, Pumps, Hot water generators, AHUs Distribution Panel, etc along with GI strip connections.\nMAIN HVAC Panel: MCC-1 at plant room\nDesigning, fabricating, transporting to site, installing, testing and commissioning of floor mounted, self supported, compartmentalized LT cubical pattern (Extendable Type) metal clad switch board, fabricated from 2mm (14 G) thick CRCA sheet steel suitable for 31 MVA rupturing capacity at 415 V, 3 phase, 4 wire, 50 HZ AC supply and equipped with PVC sleeved aluminum bus bars of specified rating and following switch gears inter connected by PVC sleeved solid conductors, including 7-tank cleaning, degreasing, phosphating process and treatment of panel with anti-corrosive zinc based primer paint and finally powder coating the panel, complete with earthing terminals, cable and bus bar alleys and hoisting hooks as required. The LT panel will comprise ACBs and MCCBs as described below for incoming and outgoing power supplies. \nINCOMERS\n1 No 800 AMP MCCB \nOUTGOINGS :3 Nos. MCCB 800 Amp, 5 Nos. 40 amp MCCB, 1 Nos. MCCB 315 amp. \n(As per Sepecification DNIT Page No. 96-97) item 74 1 Nos
75 75 \nAHU Panel Type 1 ( OT1,2 and OT 3,4 and OT 5)\nIncoming\n1 no.100 amp MCCB TPN . Phase indicating lights with control fuses.\nBreaker ON/OFF/TRIP indicating lights.\nMetering for incoming:\n1 No. Voltmeter of range 0-500V, selector switch and 2 Amps SP MCB back up.\nOne Nos. Ammeter of range 0-125 A, selector switch and 3 Nos. of associated CT's of ratio 63/5 A.\n1 set of phase indicating lamps RYB with 2A,SP, MCB backup.\nBus Bars100 amp TPN Aluminum BB with heat shrinkable insulation colored sleeves.\nOutgoings\n1 nos TP MPCB, 20-25 A with DOL starter and VFD bypass for AHU Motor\n1 Nos. 40 A TPN MCCB with ammeter, indication lamp with MCB for ‘ON’ status of equipment. Overload and under voltage protection device, Single phase preventer, phase reversal protection. For Pan Type Humidifier\n1 Nos. 16 A TPN MCB indication lamp with MCB for ‘ON’ status of equipment. Overload and under voltage protection device, For Fumigation fan.\n1 No. 10 amps DP MCB (single Phase) with step down transformer 220V to 24V (AC)\nPhase indicating lights with control fuses. Breaker ON/OFF/TRIP indicating lights. \nEach outgoing shall have auto/manual selector switch, indication lamps with control MCB's, ON/OFF push buttons, space for VFD and suitable ventilation for VFD, necessary internal control and power wiring in all respect. .The panel shall have necessary contactors / ancillaries for BMS operation and fire signal.\nPanel as described above and in drawings. item 75 3 Nos.
76 76 AHU Panel Type 3\nIncoming\n1 no.63 amp MCCB TP \nPhase indicating lights with control fuses.\nBreaker ON/OFF/TRIP indicating lights.\nMetering for incoming:\n1 No. Voltmeter of range 0-500V, selector switch and 2 Amps SP MCB back up.\nOne Nos. Ammeter of range 0-63A, selector switch and 3 Nos. of associated CT's of ratio 63/5 A.\n1 set of phase indicating lamps RYB with 2A,SP, MCB backup.\nBus Bars\n100 amp TPN Aluminum BB with heat shrinkable insulation colored sleeves.\nOutgoings\n1 nos TP MPCB, 40 amp with DOL Starter \n1 No. 10 amps DP MCB (single Phase) with step down transformer 220V to 24V (AC)\nEach outgoing shall have auto/manual selector switch, indication lamps with control MCB's, ON/OFF push buttons, necessary internal control and power wiring in all respect. .The panel shall have necessary contactors / ancillaries for BMS operation and fire signal. The base frame shall be 75 mm x 5 mm.\nPanel as described above. item 76 3 Nos.
77 77 CONSOLE PANEL/AHU CONTROL CENTRE\nConsole Centre shall have the control facility of all AHU`s/Fans with selection facility of Local/Remote, LED Indicators for ON, OFF, & Trip and ON , OFF Push Stations. Including HRC Fuse/MCB/Isolators rquired for smooth functioning of control centre. The Console Centre shall be able to control 23AHU`s/Fan`s having 2 in number spare control stations. (One control stations shall contain Selector switch - 1nos, ON/OFF push button - 1 Each, ON/OFF/Trip LED Indicator - 1Each) other accessories like cable manager etc. shall be treated as included. Complete in all respect item 77 1 Nos.
78 78 \nSupply of HVAC dedicated VFDs with IP 55 enclosures with Mains disconnect, complying with the tender specifications and having:\n1. Built-in dual 5% impedance DC link reactor (harmonic filters) on the positive and negative rails of the DC bus of the VFD. \n2. Built-in EMC Filters (electromagnetic compatibility filters) for VFDs for restriction of conducted emissions to comply with IEC61800: 3 (unrestricted distribution):2004 Category C 3. 3. Three-feedback PID controller having capability to simultaneously accept 3 feedback signals from temperature sensors or pressure sensors for process optimization and accordingly regulate the speed of the AHUs.\n4. Additional 3 PID controllers to control external devices such as chilled water modulating valve, fresh air damper, etc. thus reducing the number of I/Os in DDC Controllers & improving system reliability.\n5. Automatic Energy Optimization / Load dependent flux optimization functionality for maximum energy savings.\n6. MODBUS RTU as the communication protocol between BMS & VFDs.\n7. VFDs not meeting above requirements shall provide external disconnect, external harmonic filters, additional external EMC Filters to comply with IEC61800: 3 (unrestricted distribution):2004 Category C 3, external PLCs / DDCs to achieve 3 Feedback PID Controller functionality and external devices controlling capabilities.\n8. The VFD cost shall include suitable PID controller for regulating the flow of air by controlling the frequency of VFD. 5 HP item 78 1 Nos.
79 79 7.5 HP item 79 2 Nos.
80 80 Power Cabling:\nSupply, laying testing and commissioning of 1100 volt grade armored XLPE. insulated and sheathed aluminium/copper conductor cables of sizes as below, on cable trays with suitable clamps, saddles, hooks, bolts etc. complete as per specifications and as required. The quoted rate shall include the cost of proper dressing of cables and also providing identification tags as required.\n3.5 core 150 Sq.mm Al cable item 80 200 Rmt.
81 81 3.5 core 35 Sq.mm Al cable item 81 100 Rmt.
82 82 3.5 core 25 Sq.mm Al cable item 82 100 Rmt.
83 83 4 core 16 Sq. mm Al cable item 83 200 Rmt.
84 84 4 core 10 Sq. mm Al cable item 84 200 Rmt.
85 85 4 core 6 Sq. mm Al cable item 85 100 Rmt.
86 86 4 core 4 Sq. mm Copper armoured item 86 200 Rmt.
87 87 4 C x 16 Sqmm Copper armoured item 87 100 Rmt.
88 88 3Cx2.5 Sqmm Copper armoured item 88 400 Rmt.
89 89 Supplying, installation, testing and commissioning of control cabling with insulated PVC sheathed wire/cable as per IS-7098 (Part-1) of following sizes including terminations on suitable cable trays / uPVC pipe with supports, as required including connections on both sides as per specifications and as required.\n2 core x 1.5 sq. mm. item 89 300 Rmt.
90 90 3 core x 1.5 sq. mm. item 90 400 Rmt.
91 91 4 core x 1.5 sq. mm. item 91 300 Rmt.
92 92 6 core x 1.5 sq. mm. item 92 200 Rmt.
93 93 8 core x 1.5 sq. mm. item 93 100 Rmt.
94 94 12 core x 1.5 sq. mm. item 94 100 Rmt.
95 95 Cable Trays\nSupplying and installing following size of performated pre-painted MS cable trays cross members with perforation not more than 17.5% joined with connectors, suspended from the ceilling with MS suspenders including nuts , bolts, bends , reducers etc. painted suspenders etc. as required.\n150mm (W) x 50mm (D) x 1.6mm thickness item 95 80 Rmt.
96 96 300mm (W) x 50mm (D) x 1.6mm thickness item 96 80 Rmt.
97 97 450mm (W) x 50mm (D) x 2.0mm thickness item 97 50 Rmt.
98 98 Earthing:\nSupply and fixing of GI earthing conductor of following sizes completely as required.\n25 x 5 mm GI strip item 98 150 Rmt.
99 99 4 Swg Cu wire item 99 250 Rmt.
100 100 6 Swg Cu wire item 100 400 Rmt.
101 101 Supply of isolators for fan motor comprising of 32/63 amp MCB enclosed in weather proof MS casing item 101 6 Nos.
102 102 Supplying and fixing of thermostat box for AHUs completely as required. item 102 6 Nos.
103 103 Supplying and fixing 2000mm x 900mm x 12 mm thick checkered rubber matting conforming to IS- 5424-1969 complete etc. as required. item 103 1 Set
104 104 PUFF PANELS FOR TEMPORARY PLANT ROOM\nSupply Installation, Testing and Commissioning of 100 mm thick PUF panels made up of minimum 0.60 mm thick Pre-painted G.I. sheet on both sides with tongue and groove arrangement and having internal cam locks for jointing. 'U' type flushing made of at least 20 G GI sheet shall be fixed on the foundation using secure foundation bolts throughout the edges of foundation. PUF panels shall be fixed inside the 'U' type flushings already fixed onto floor using rivets at suitable distance to form the walls of the AHU room. The jointing of panels should be internally cam locked type. The panels should have tongue and groove joints for proper fixing. At the joints of the panels on the outside and inside fix 50 mm wide flat strips made of 0.60 mm thick pre colour coated GI sheet so as to prevent any moisture ingress and leakage inside the panels. The PUF panels shall be minimum 50 mm thick with 0.6 mm thick PP GI sheet on both sides with tongue and groove arrangement having internal cam locks for jointing. The inside corner of panel walls corner angles made of 0.6 mm thick PPGI shall be fixed to cover the corner joints. Similarly external corner of PUF panels for walls and roof shall be fixed of 0.6 mm thick PP GI. The roof panels shall be further reinforced with hollow M.S. tubes to increase their load bearing capacity. 50 mm wide 'U' type flushing made of at least 20 G GI sheets shall be fixed on the edges of the roof using secure rivets to stop water entering into the panel. The roof panels will also have interlocking with cam locks and shall have a slope of 1: 50. All exposed foam panels will be covered with C type flushing. All joints are to be thoroughly filled with silicone sealant before covering the joints with flat joints. The rooms shall adequate openings duly sealed for cable, chilled water, and hot water and drain pipes. Provision shall be made in the AHU room for putting fresh air grill and the same will have adequate shelter to avoid ingress of water etc.\nProviding and fixing of 100 mm panel for walls in white alpine colour having tongue and groove joint with cam locks for interlocking the panels with all accessories as described above. item 104 90 Sqm.
105 105 Providing and fixing of 50 mm panel for Roof in white alpine colour having tongue and groove joint with cam locks for interlocking the panels with all accessories as described above. item 105 40 Sqm.
106 106 Providing and fixing of PUF panel door with door frame, door handle along with rubber gasket hinges etc and flushing as described above item 106 2 Nos.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail