| 1 | 0 | MODULE – I | | | |
|---|
| 2 | 0.1 | Civil works for Stubs Electrode welding RCC Pit and Miscellaneous works at MS-II | | | |
|---|
| 3 | 1 | Dismantling RCC including taking out reinforcement & stacking at 50m lead. Rate also including disposal upto lead of 1.00 Km. | item1 | 14 | Cu.m |
|---|
| 4 | 2 | Earthwork in Excavation by mechanical means (hydraulic means) / manual means over area including disposal of excavated earth, lead upto 50 m from natural ground level and backfilling of soils wherever & whenever required as directed by E.I.C. Disposed earth to be leveled and neatly dressed. This item includes surface cleaning and site clearance | item2 | 50 | Cu.m |
|---|
| 5 | 3 | Carriage / Carting of excavated soils / rocks by mechanical transport including loading, unloading, stacking and levelling for the required areas upto 1.00 km. | item3 | 50 | Cu.m |
|---|
| 6 | 4 | Providing Plain Cement concrete in foundations filling and mass concrete Type d2 1:4:8 (40mm graded aggregate) including mixing, placing, compacting, ramming and curing (allowance of 100% Manufacture sand) | item4 | 1 | Cu.m |
|---|
| 7 | 5 | Providing Reinforcement cement concrete design mix in Foundations including rafts, footings, foundation beams, plinth beams, walls, basement slabs, base for columns etc. - M 25 (20mm graded aggregates) including mixing, placing, pumping, compacting, vibrating and curing. (allowance of 50% river sand + 50% Robo sand) | item5 | 17 | Cu.m |
|---|
| 8 | 6 | Supply and Fixing TMT bars 10 mm dia to 16mm dia, cut to length bend to shape required, including cranking, bending, spirally for hooping for columns, hooking ends and binding and including mild steel wire (unyielding) not less than 0.9mm dia are securing with clips. | item6 | 1200 | Kg |
|---|
| 9 | 7 | Providing Form work to sides of concrete bases, rafts, beams, Pillars, posts, structs, piers, columns, walls, slabs, ircase steps and stanchions etc – Flat Surfaces. | item7 | 25 | Sqm |
|---|
| 10 | 8 | Supply & fixing of structural steel - M.S Steel Insert plates, Angles, including caps, bases, splices etc. built-up from two or more beam or channel sections or angles with plates, including all lattice bars, stiffeners, gusset plates, kerb angles, channels and beams, etc at all levels as per drawing. The cost of providing gas cutting including gas bottles, welding machines, welding rods , all tools required etc is in the scope of contractor. | item8 | 2000 | kg |
|---|
| 11 | 8.1 | Supply of labours | | | |
|---|
| 12 | 9 | A) Skilled | item9 | 5 | Each |
|---|
| 13 | 10 | B) Un-Skilled | item10 | 10 | Each |
|---|
| 14 | 10.1 | MODULE – II | | | |
|---|
| 15 | 10.2 | Construction of Ramps, Plinth protection and Drain works for MS-III Extension at MIDHANI | | | |
|---|
| 16 | 11 | Dismantling RCC including taking out reinforcement in G. floors & stacking at 50m lead. Rate also including disposal upto lead of 1.00 Km. | item11 | 2 | Cu.m |
|---|
| 17 | 12 | Earth work in excavation by mechanical means (hydraulic excavator) / manual means over areas (exceeding 30cm but below 3.0 depth, 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5Km, disposed earth to be levelled and neatly dressed cost includes back filling. | item12 | 80 | Cu.m |
|---|
| 18 | 13 | Providing and laying in position cement concrete of specified grade excluding the cost of centering & shuttering-All work up to plinth level : PCC 1:4:8 (1 cement, 4 aggregate 40mm nominal size) including curing, leveling, consolidation etc (allowance of 100% Manufacturer sand). | item13 | 35 | Cu.m |
|---|
| 19 | 14 | Providing & laying RCC M25 Design Mix of specified grade excluding the cost of centering & including shuttering all work at all levels as indicated in drawing including cost of mixing, placing, compaction, vibration, pumping, consolidation, curing complete, walls, staircase, roads etc with 20mm & down size metal at all levels as per drawing (allowance of 50% River sand + 50% Manufacturer sand). | item14 | 25 | Cu.m |
|---|
| 20 | 15 | Supply , and fixing in position HYSD / TMT / Fe 500 steel reinforcements of various diameters at all levels and positions including cost of straightening, cutting, laying, bending, cranking and tying with annealed GI wire after placing in positions as directed by the Engineer-in- charge including cost and conveyance of steel and GI wires, lifting, labor charges and concrete cover blocks etc.. The overlaps will not be measured seperately, Use steel-Tata Tisco/VSP/Sail Steel or approved make only. | item15 | 500 | Kg's |
|---|
| 21 | 16 | Providing CRS walls built in cement mortar (1:6) (cement : sand) including labour for cutting stone to required size and shape, mixing of cement mortar, construction, curing etc complete. (allowance of 50% River sand + 50% Manufacturer sand). | item16 | 35 | Cu.m |
|---|
| 22 | 17 | Providing internal plaster of 15mm thick cement-sand plaster in two coats, backing coat 10mm thick in CM (1:6) and finishing coat 5mm thick, finished smooth at all heights , providing chicken mesh with CM 1:3 proportion at all RCC & masonry joints, necessary dabbing, curing, 10x10mm Grooves as required including scaffolding complete as per specifications (for all heights ). The plaster work shall be true to the plumb and square and contractor shall provide proper gauges prior to start of work for approval including cost and conveyance of all materials, scaffolding at all heights, labour charges and all operational, incidental charges etc., complete for finished item of work as directed by the engineer in charge. | item17 | 160 | Sq.m |
|---|
| 23 | 18 | Providing Plinth protection with a bed of 100mm thick PCC (1:3:6) using 20mm size HBG metal and on top of PCC, laid monolithically and finishing the top surface to required smoothness with cement punning and slopes including Grooves, thread lining as directed by the Engineer - in – charge including cost and conveyance of all materials to site incidental and labor charges like mixing of cement concrete, laying, curing, lift charges etc., complete including cost of CC bed for finished item of work | item18 | 110 | Sq.m |
|---|
| 24 | 19 | Supply & fixing 6mm chequuered plates on cable trenches including the cost of cutting to size, positioning, painting one coat primer and two coats of synthetic enamel paint. The cost also includes making handles with 12mm MS Rods for lifting purpose at all levels as per drawing. The cost of providing gas cutting machine, gas bottles, welding machine, welding rods, all tools required etc is in the scope of contractor. | item19 | 2000 | Kg |
|---|
| 25 | 19.1 | Supply of labours | | | |
|---|
| 26 | 20 | a. Un skilled | item20 | 10 | Nos. |
|---|
| 27 | 20.1 | MODULE – III | | | |
|---|
| 28 | 20.2 | Civil work for Renovation of Hydraulic Power Pack rooms in Melt Shop-IV at plant | | | |
|---|
| 29 | 21 | Providing & construction of 230mm Brick work with second class bricks locally avaliable best quality bricks of class above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including scaffolding, curing, tools, tackles etc. | item21 | 12.76 | Cu.m |
|---|
| 30 | 22 | Providing & Plastering 15 mm cement plaster in two coats under layer 1:4 mm thick cement plaster 1:4 (1 cement : 4 coarse sand) and a top layer 5mm thick cement plaster 1:2 (1 cement : 2 coarse sand) finished rough with sponge including scaffolding, curing etc complete. | item22 | 120 | Sq.m |
|---|
| 31 | 23 | Providing & painting One coat primer & two coats OBD painting including surface preparation for wall & ceiling complete, as per instructions of Engineer-In-Charge at all heights & levels including scaffolding complete. | item23 | 120 | Sqm |
|---|
| 32 | 24 | Providing and fixing Gypsum Board 12mm thick in ceiling fixed with Anodised aluminium frame work with Hangers 6 mm dia. G.I. (upto 1200mm length) adjusting level fixed to roof slabs by means of ceilling cleats made out of G.I.flat 40 x 3 mm size 60mm long and expansion hold fasteners 12.5mm dia. 40mm long complete all as specified. The cost includes two coats of OBD painting with luppum. | item24 | 55 | Sqm |
|---|
| 33 | 25 | Providing & Fixing of M.S Door (Double leaf) made up of 3mm sheet & with half 5mm clear glass and frame made up of ISMC 75,ISA 50X50X6 angles & 3mm gusset plates at junction & corners. Cost also including all fittings-handles aldrop for locking, tower bolt, hinges and hold fasts. It also includes cost of one coat red oxide primer and two coats of synthetic enamel paint ( at all heights & levels and as per instruction of engineer-in-charge | item25 | 8 | Sq.m |
|---|