}

Annual Rate Contract For Drilling And Development Of Tubewells By Heavy Duty Percussion/Direct Rotary/Dual Rotary Rig Machine Anywhere In Uttarakhand, Uttarakhand State-Uttarakhand

Drinking Water And Sanitation Department has published Annual Rate Contract For Drilling And Development Of Tubewells By Heavy Duty Percussion/Direct Rotary/Dual Rotary Rig Machine Anywhere In Uttarakhand. Submission Date for this Tender is 11-06-2021. Bolts Tenders in Uttarakhand State Uttarakhand. Bidders can get complete Tender details and download the document.




Tender Notice

28030840
Annual Rate Contract For Drilling And Development Of Tubewells By Heavy Duty Percussion/Direct Rotary/Dual Rotary Rig Machine Anywhere In Uttarakhand
National Competitive Bid
Indian
Uttarakhand
Uttarakhand State
11-06-2021

Tender Details

Annual Rate Contract For Drilling And Development Of Tubewells By Heavy Duty Percussion/Direct Rotary/Dual Rotary Rig Machine Anywhere In Uttarakhand , Rates Of The Drilling & Development Of Tube Wells By Heavy Duty Percussion Rig Machine Anywhere In Uttarakhand ( 150 Meter Deep ) Schedule A-1 , Transportation Of Suitable Truck Mounted Rig Machine , Air Compressor , Op Unit , Camp Equipage , Connected T&P And Necessary Accessories , Casing Pipe , Tube Well Assembly Housing Pipe Etc Including Loading , Unloading Creation And Levelling Of Rig Machine Upto Site Of Work Etc Complete In All Respect As Per Direction Of Engineer In Charge Required For Drilling And Development Of Tw ( I ) For Plain Area , ( Ii ) Erection & Leveling Of Rig Machine At Site Of Work , Drilling Of Bore Following Sizes By Heavy Duty Percussion Rig Machine ( Telescopic Method ) In Alluvial , Boulders , Pebbles , Rocky Stone , Sticky Clay Etc From Ground Level Upto Entire Depth Using By 600/550/500/450/400 Mm Casing Pipes As Below . ( I ) 600/550/500 Mm Dia Bore From Gl To 50 M Bgl , ( Ii ) 450 Mm Dia Bore From 50 M To 100 M Bgl , ( Iii ) 400 Mm Dia Bore From 100 M To 150 M Bgl , Lowering Of Different Size Of Casing Pipes In Drilled And Lined Bore As Below ( I ) Lowering Of 500/450 Mm Dia Casing Pipe ( A ) From Gl To 50 M Bgl , ( Ii ) Lowering Of 400 Mm Dia Casing Pipe ( A ) From Gl To 100 M Bgl , Extraction Of Different Size Of Casing Pipe From Bottom To Gl As Below ( I ) Extraction Of 400Mm Dia Casing Pipe From 150 M Bgl To 100 M Bgl , ( Ii ) Extraction Of 500/450Mm Dia Casing Pipe From 150 M Bgl To 50 M Bgl , ( Iii ) Extraction Of 600/550/500Mm Dia Casing Pipe From 50 M Bgl To Gl , Lifting Of Different Size Of Casing Pipe In Drilled Lined Bore As Below ( I ) Lifting Of 400Mm Dia Casing Pipe From 100 M Bgl To Gl As Below , ( Ii ) Lifting Of 500/450Mm Dia Casing Pipe From 50 M Bgl To Gl As Below , Procurement Of Tw Assembly As Below ( I ) 300 Mm Dia Mserw Pipe 7 . 90Mm Thick ( A ) Blind & Threaded , ( B ) Slotted & Threaded , ( Ii ) 300 Mm Dia Bail Plug , ( Iii ) 300 Mm Dia Ms Well Cap , ( Iv ) 300 Mm Dia Ms Clamp With Nuts & Bolts , ( V ) Supply Of Pea Gravel Of Size 1 . 6 Mm To 4 . 8 Mm , ( Vi ) Surrounding Of Pea Gravels In Between Bore And Tubewell Assembly Upto Entire Depth Of Tubewell Ordered By The Department , Lowering Of Tw Assembly As Below ( I ) Preparing & Lowering Of Tubewell Assembly Starting From Gl To The Required Depth Including Cutting Welding As Per Required At Site Complete With All T&P ( A ) 300 Mm Dia Ms Erw Pipe ( Plain & Slotted ) As Required , Dismantling Of Heavy Duty Percussion Rig Machine & Other Equipments And Clearance Of Site After Finishing The Job . , Development Of T/W By 350 Psi/1400 Cfm Air Compressor Unit To The Satisfaction Of Engineering In Charge To Give Sand Free Discharge And Proper Packing Of Pea Gravels At Least For 70 Hrs , Development Of T/W By The Suitable Submersible Op Units Complete With Lowering And Lifting Of Pumping Plant Having 2000 Lpm Discharge Approximate Including Running Of Op Unit And Weld Testing Of Tubewell By V Notch Atleast For 60 Hrs To The Satisfactory Completion Of Work , Rates Of The Drilling & Development Of Tube Wells By Heavy Duty Direct Rotary Rig Machine In District Dehradun . ( 150 Meter Deep ) Schedule A-2 , Transportation Of Suitable Truck Mounted Rig Machine , Air Compressor , Op Unit , Camp Equipage , Connected T&P And Necessary Accessories , Casing Pipe , Tube Well Assembly Housing Pipe Etc Including Loading , Unloading Creation And Leveling Of Rig Machine Upto Site Of Work Etc Complete In All Respect As Per Direction Of Engineer In Charge Required For Drilling And Development Of Tw , ( I ) Erection & Leveling Of Rig Machine At Site Of Work , Drilling Of 550 Mm Dia Bore By Heavy Duty Direct Rotary Rig Machine In Alluvial , Boulders , Pebbles , Rocky Stone , Sticky Clay Etc From Ground Level Upto Entire Depth For 300 Mm Dia Linear Assembly , Procurement Of Tw Assembly As Below ( I ) 300 Mm Dia Mserw Pipe 7 . 90Mm Thick ( A ) Blind & Threaded , ( B ) Slotted & Threaded , ( Ii ) 300 Mm Dia Bail Plug , ( Iii ) 300 Mm Dia Ms Well Cap , ( Iv ) 300 Mm Dia Ms Clamp With Nuts & Bolts , ( V ) Supply Of Pea Gravel Of Size 1 . 6 Mm To 4 . 8 Mm , ( Vi ) Surrounding Of Pea Gravels In Between Bore And Tube Well Assembly Upto Entire Depth Of Tube Well Ordered By The Department , Preparing & Lowering Of Tube Well Assembly Starting From G . L . To The Required Depth Including Cutting , Welding As Required At Site Complete With All T&P Required . ( I ) Fixing Of 300 Mm Dia Bail Plug With Nut & U-Bolt . , ( Ii ) Lowering Of 300 Mm Dia Mserw Housing Pipe ( Plain & Slotted Pipe ) As Required . , ( Iii ) Fixing Of 300 Mm Dia , 8 Mm Thick Tube Well Cap . , ( Iv ) Fixing Of 300 Mm Dia M . S . D . I . Housing Clamp . , Dismantling Of Rig Machine & Clearance Of Site After Satisfactory Completion Of Work . , Development Of T/W By 350 Psi/1400 Cfm Air Compressor Unit To The Satisfaction Of Engineering In Charge To Give Sand Free Discharge And Proper Packing Of Pea Gravels At Least For 70 Hrs . , Development Of T/W By The Suitable Submersible Op Units Complete With Lowering And Lifting Of Pumping Plant Having 2000 Lpm Discharge Approximate Including Running Of Op Unit And Weld Testing Of Tube Well By V Notch Atleast For 60 Hrs To The Satisfactory Completion Of Work . , Rates Of The Drilling & Development Of Tube Wells By Heavy Duty Dual Rotary Rig Machine In District Dehradun . ( 150 Meter Deep ) Schedule A-3 , Transportation Of Suitable Truck Mounted Rig Machine , Air Compressor , Op Unit , Camp Equipage , Connected T&P And Necessary Accessories , Casing Pipe , Tube Well Assembly Housing Pipe Etc Including Loading , Unloading Creation And Levelling Of Rig Machine Upto Site Of Work Etc Complete In All Respect As Per Direction Of Engineer In Charge Required For Drilling And Development Of Tw ( I ) For Plain Area , ( Ii ) Erection & Leveling Of Rig Machine At Site Of Work , Drilling Of Bore Following Sizes By Heavy Duty Dual Rotary Rig Machine ( Telescopic Method ) In Alluvial , Boulders , Pebbles , Rocky Stone , Sticky Clay Etc From Ground Level Upto Entire Depth Using By 600/550/500/450/400 Mm Casing Pipes As Below . ( I ) 600/550/500 Mm Dia Bore From Gl To 50 M Bgl , ( Ii ) 450 Mm Dia Bore From 50 M To 100 M Bgl , ( Iii ) 400 Mm Dia Bore From 100 M To 150 M Bgl , Lowering Of Different Size Of Casing Pipes In Drilled And Lined Bore As Below ( I ) Lowering Of 500/450 Mm Dia Casing Pipe ( A ) From Gl To 50 M Bgl , ( Ii ) Lowering Of 400 Mm Dia Casing Pipe ( A ) From Gl To 100 M Bgl , Extraction Of Different Size Of Casing Pipe From Bottom To Gl As Below ( I ) Extraction Of 400Mm Dia Casing Pipe From 150 M Bgl To 100 M Bgl , ( Ii ) Extraction Of 500/450Mm Dia Casing Pipe From 150 M Bgl To 50 M Bgl , ( Iii ) Extraction Of 600/550/500Mm Dia Casing Pipe From 50 M Bgl To Gl , Lifting Of Different Size Of Casing Pipe In Drilled Lined Bore As Below ( I ) Lifting Of 400Mm Dia Casing Pipe From 100 M Bgl To Gl As Below , ( Ii ) Lifting Of 500/450Mm Dia Casing Pipe From 50 M Bgl To Gl As Below , Procurement Of Tw Assembly As Below ( I ) 300 Mm Dia Mserw Pipe 7 . 90Mm Thick ( A ) Blind & Threaded , ( B ) Slotted & Threaded , ( Ii ) 300 Mm Dia Bail Plug , ( Iii ) 300 Mm Dia Ms Well Cap , ( Iv ) 300 Mm Dia Ms Clamp With Nuts & Bolts , ( V ) Supply Of Pea Gravel Of Size 1 . 6 Mm To 4 . 8 Mm , ( Vi ) Surrounding Of Pea Gravels In Between Bore And Tubewell Assembly Upto Entire Depth Of Tubewell Ordered By The Department , Lowering Of Tw Assembly As Below ( I ) Preparing & Lowering Of Tubewell Assembly Starting From Gl To The Required Depth Including Cutting Welding As Per Required At Site Complete With All T&P ( A ) 300 Mm Dia Ms Erw Pipe (

Key Value

Document Fees
INR 1180 /-
EMD
INR 78000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: Annual Rate Contract for: Drilling and Development of Tubewells by Heavy Duty Percussion/Direct Rotary/Dual Rotary Rig Machine anywhere in Uttarakhand.
Sl. No. Item Description Item Code / Make Quantity Units
1 1 RATES OF THE DRILLING & DEVELOPMENT OF TUBE WELLS BY HEAVY DUTY PERCUSSION RIG MACHINE ANYWHERE IN UTTARAKHAND \n(150 meter Deep)\nSchedule A-1
2 1.01 Transportation of suitable truck mounted rig machine, air compressor, OP unit, camp equipage ,connected T&P and necessary accessories, casing pipe ,tube well assembly housing pipe etc including loading, unloading creation and levelling of rig machine upto site of work etc complete in all respect as per direction of Engineer in charge required for drilling and development of TW\n(i) For plain Area item1 1 Job
3 1.02 (ii) Erection & Leveling of rig machine at site of work item2 1 Job
4 1.03 Drilling of bore following sizes by heavy duty percussion Rig machine (Telescopic Method) in alluvial, boulders, pebbles, rocky stone,sticky clay etc from ground level upto entire depth using by 600/550/500/450/400 mm casing pipes as below.\n(i) 600/550/500 mm dia bore from GL to 50 m BGL item3 50 M
5 1.04 (ii) 450 mm dia bore from 50 m to 100 m BGL item4 50 M
6 1.05 (iii) 400 mm dia bore from 100 m to 150 m BGL item5 50 M
7 1.06 Lowering of different size of casing pipes in drilled and lined bore as below\n(i) Lowering of 500/450 mm Dia casing pipe\n(a) from GL to 50 m BGL item6 50 M
8 1.07 (ii) Lowering of 400 mm Dia casing pipe\n(a) from GL to 100 m BGL item7 100 M
9 1.08 Extraction of different size of casing pipe from bottom to GL as below\n(i) Extraction of 400mm dia casing pipe from 150 m BGL to 100 m BGL item8 50 M
10 1.09 (ii) Extraction of 500/450mm dia casing pipe from 150 m BGL to 50 m BGL item9 50 M
11 1.1 (iii) Extraction of 600/550/500mm dia casing pipe from 50 m BGL to GL item10 50 M
12 1.11 Lifting of different size of casing pipe in drilled lined bore as below\n(i) Lifting of 400mm dia casing pipe from 100 m BGL to GL as below item11 100 M
13 1.12 (ii) Lifting of 500/450mm dia casing pipe from 50 m BGL to GL as below item12 50 M
14 1.13 Procurement of TW assembly as below\n(i) 300 mm dia MSERW pipe 7.90mm thick \n(a) Blind & Threaded item13 120 M
15 1.14 (b) Slotted & threaded item14 30 M
16 1.15 (ii) 300 mm Dia Bail Plug item15 1 Each
17 1.16 (iii) 300 mm Dia MS well cap item16 1 Each
18 1.17 (iv) 300 mm Dia MS clamp with nuts & bolts item17 1 Each
19 1.18 (v) Supply of pea gravel of size 1.6 mm to 4.8 mm item18 80 Cum
20 1.19 (vi) Surrounding of pea Gravels in between bore and tubewell assembly upto entire depth of tubewell ordered by the department item19 150 M
21 1.2 Lowering of TW assembly as below\n(i) preparing & Lowering of tubewell assembly starting from GL to the required depth including cutting welding as per required at site complete with all T&P \n(a) 300 mm dia MS ERW pipe (plain & Slotted)as required item20 150 M
22 1.21 Dismantling of heavy duty percussion Rig machine & other equipments and clearance of site after finishing the job. item21 1 Job
23 1.22 Development of T/W by 350 PSI/1400 CFM air compressor unit to the satisfaction of Engineering in charge to give sand free discharge and proper packing of pea Gravels at least for 70 Hrs item22 100 Hrs
24 1.23 Development of T/W by the suitable submersible OP units complete with Lowering and lifting of pumping plant having 2000 LPM discharge approximate including running of OP unit and weld testing of tubewell by V Notch atleast for 60 Hrs to the satisfactory completion of work item23 60 Hrs
25 2 RATES OF THE DRILLING & DEVELOPMENT OF TUBE WELLS BY HEAVY DUTY DIRECT ROTARY RIG MACHINE IN DISTRICT DEHRADUN.\n(150 meter Deep)\nSchedule A-2
26 2.01 Transportation of suitable truck mounted rig machine, air compressor, OP unit, camp equipage ,connected T&P and necessary accessories, casing pipe ,tube well assembly housing pipe etc including loading, unloading creation and leveling of rig machine upto site of work etc complete in all respect as per direction of Engineer in charge required for drilling and development of TW item24 1 Job
27 2.02 (i) Erection & Leveling of rig machine at site of work item25 1 Job
28 2.03 Drilling of 550 mm dia bore by heavy duty direct rotary Rig machine in alluvial, boulders, pebbles, rocky stone, sticky clay etc from ground level upto entire depth for 300 mm dia linear assembly item26 150 M
29 2.04 Procurement of TW assembly as below\n(i) 300 mm dia MSERW pipe 7.90mm thick \n(a) Blind & Threaded item27 120 M
30 2.05 (b) Slotted & threaded item28 30 M
31 2.06 (ii) 300 mm Dia Bail Plug item29 1 Each
32 2.07 (iii) 300 mm Dia MS well cap item30 1 Each
33 2.08 (iv) 300 mm Dia MS clamp with nuts & bolts item31 1 Per No
34 2.09 (v) Supply of pea gravel of size 1.6 mm to 4.8 mm item32 80 Cum
35 2.1 (vi) Surrounding of pea Gravels in between bore and tube well assembly upto entire depth of tube well ordered by the department item33 150 M
36 2.11 Preparing & lowering of tube well assembly starting from G.L. to the required depth including cutting, welding as required at site complete with all T&P required. \n(i) Fixing of 300 mm dia bail plug with Nut & U-bolt. item34 1 Job
37 2.12 (ii) Lowering of 300 mm dia MSERW housing pipe (Plain & Slotted pipe) as required. item35 150 M
38 2.13 (iii) Fixing of 300 mm dia, 8 mm thick tube well cap. item36 1 Job
39 2.14 (iv) Fixing of 300 mm dia M.S.D.I. housing clamp. item37 1 Job
40 2.15 Dismantling of Rig Machine & Clearance of site after satisfactory completion of work. item38 1 Job
41 2.16 Development of T/W by 350 PSI/1400 CFM air compressor unit to the satisfaction of Engineering in charge to give sand free discharge and proper packing of pea Gravels at least for 70 Hrs. item39 100 Hrs
42 2.17 Development of T/W by the suitable submersible OP units complete with Lowering and lifting of pumping plant having 2000 LPM discharge approximate including running of OP unit and weld testing of tube well by V Notch atleast for 60 Hrs to the satisfactory completion of work. item40 60 Hrs
43 3 RATES OF THE DRILLING & DEVELOPMENT OF TUBE WELLS BY HEAVY DUTY DUAL ROTARY RIG MACHINE IN DISTRICT DEHRADUN.\n(150 meter Deep)\nSchedule A-3
44 3.01 Transportation of suitable truck mounted rig machine, air compressor, OP unit, camp equipage ,connected T&P and necessary accessories, casing pipe ,tube well assembly housing pipe etc including loading, unloading creation and levelling of rig machine upto site of work etc complete in all respect as per direction of Engineer in charge required for drilling and development of TW\n(i) For plain Area item41 1 Job
45 3.02 (ii) Erection & Leveling of rig machine at site of work item42 1 Job
46 3.03 Drilling of bore following sizes by heavy duty dual rotary Rig machine (Telescopic Method) in alluvial, boulders, pebbles, rocky stone,sticky clay etc from ground level upto entire depth using by 600/550/500/450/400 mm casing pipes as below.\n(i) 600/550/500 mm dia bore from GL to 50 m BGL item43 50 M
47 3.04 (ii) 450 mm dia bore from 50 m to 100 m BGL item44 50 M
48 3.05 (iii) 400 mm dia bore from 100 m to 150 m BGL item45 50 M
49 3.06 Lowering of different size of casing pipes in drilled and lined bore as below\n(i) Lowering of 500/450 mm Dia casing pipe\n(a) from GL to 50 m BGL item46 50 M
50 3.07 (ii) Lowering of 400 mm Dia casing pipe\n(a) from GL to 100 m BGL item47 100 M
51 3.08 Extraction of different size of casing pipe from bottom to GL as below\n(i) Extraction of 400mm dia casing pipe from 150 m BGL to 100 m BGL item48 50 M
52 3.09 (ii) Extraction of 500/450mm dia casing pipe from 150 m BGL to 50 m BGL item49 50 M
53 3.1 (iii) Extraction of 600/550/500mm dia casing pipe from 50 m BGL to GL item50 50 M
54 3.11 Lifting of different size of casing pipe in drilled lined bore as below\n(i) Lifting of 400mm dia casing pipe from 100 m BGL to GL as below item51 100 M
55 3.12 (ii) Lifting of 500/450mm dia casing pipe from 50 m BGL to GL as below item52 50 M
56 3.13 Procurement of TW assembly as below\n(i) 300 mm dia MSERW pipe 7.90mm thick \n(a) Blind & Threaded item53 120 M
57 3.14 (b) Slotted & threaded item54 30 Each
58 3.15 (ii) 300 mm Dia Bail Plug item55 1 Each
59 3.16 (iii) 300 mm Dia MS well cap item56 1 Each
60 3.17 (iv) 300 mm Dia MS clamp with nuts & bolts item57 1 Each
61 3.18 (v) Supply of pea gravel of size 1.6 mm to 4.8 mm item58 80 Cum
62 3.19 (vi) Surrounding of pea Gravels in between bore and tubewell assembly upto entire depth of tubewell ordered by the department item59 150 M
63 3.2 Lowering of TW assembly as below\n(i) preparing & Lowering of tubewell assembly starting from GL to the required depth including cutting welding as per required at site complete with all T&P \n(a) 300 mm dia MS ERW pipe (plain & Slotted)as required item60 150 M
64 3.21 Dismantling of heavy duty percussion Rig machine & other equipments and clearance of site after finishing the job. item61 1 Job
65 3.22 Development of T/W by 350 PSI/1400 CFM air compressor unit to the satisfaction of Engineering in charge to give sand free discharge and proper packing of pea Gravels at least for 70 Hrs item62 100 Hrs
66 3.23 Development of T/W by the suitable submersible OP units complete with Lowering and lifting of pumping plant having 2000 LPM discharge approximate including running of OP unit and weld testing of tubewell by V Notch atleast for 60 Hrs to the satisfactory completion of work item63 60 Hrs
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail