| 1 | 1 | Removing exisitng mangalore tiles / AC / GI / Galvalume sheets / polycarbonate plain and corrugated sheets from roof / cladding / partitions etc., excluding supporting structure but including scaffolding, handling, tansporting, sorting and stacking at site lead up to 150m and or disposing etc complete as directed. | A1 | 2700 | M2 |
|---|
| 2 | 2 | Providing and fixing 6 mm thick Non-asbestos high impact Polypropylene reinforced cement corrugated sheet of approved make conforming to IS: 14871-2000 laying the same in position as per the stipulation in IS: 3007-1991 using 8m dia polymer coated iron L or J hook bolts, galvanized iron & bituminous washers, or self drilling fasteners and EPDM washers, galvanized iron clamps, nuts and bolts etc. complete and as directed. (Net Area covered by sheeting will be measured. Laps will not be paid separately) | A2 | 1800 | M2 |
|---|
| 3 | 3 | Providing and fixing non-asbestos fiber cement high impact polypropylene reinforced roofing accessories in all colours with polymer coated J or L hooks, bolts and nuts and or G.I. seam bolts and nuts, G.I. plain and bitumen washers or with self drilling fastener and EPDM washer etc. complete as directed. Corrugated serrated adjustable ridges. | A3 | 150 | M |
|---|
| 4 | 4 | Providing & fixing UV stabilised fiberglass reinforced plastic sheet roofing up to any pitch, including fixing with polymer coated 'J' or 'L' hooks, bolts & nuts 8mm dia. G.I plain/bitumen washers complete but excluding the cost of purlins, rafters, trusses etc. The sheets shall be manufactured out of 2400 TEX panel rovigs incorporating minimum 0.3% ultra-violet stabiliser in resin system under approximately 2400 psi and hot cured. They shall be of uniform pigmentation and thickness without air pockets and shall conform to IS 10192 and IS 12866. The sheets shall be opaque or translucent, clear or pigmented, textured or smooth as specified. (1.50 mm thick coloured F.R.P. corrugated sheet) | A3 | 640 | M2 |
|---|
| 5 | 5 | Erecting and fixing scaffolding system up to 18m height made with M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock or clamp system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after .The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer-in-charge . | A3 | 13100 | M3 |
|---|
| 6 | 6 | Providing, detailing, fabricating and fixing at desired location using hot rolled sections and MS Plates of grade Fe 250 as per specifications and approved fabrication drawings (which are to be prepared by Contractor and got approved from Engineer), transporting to site and erecting structural steel members for all heights & at all levels including provision of necessary erection bolts, fixing bolts, nuts, washers, cleats, stiffeners, gussets, base plate, and all necessary fixtures and operations like preheating as per specifications, straightening, bending, cutting, drilling, grinding, machining if specified, welding, grinding and removing the welding burr and preparing surface for painting with wire brush cleaning and applying two coats of epoxy red oxide zinc hosphate primer of 30 microns each and two coats of Epoxy Corrosion Resistant Enamel paint of 30 microns after fabrication including touching up with spray painting after erection etc complete as directed by Engineer In Charge. (The qty. for this item shall be measured for gusset plates, base plates, bolts in M.T.) | A4 | 2 | MT |
|---|