Bharat Coking Coal Limited-BCCL has published Hiring Of Hemm For Removal Of Ob , Extraction And Transportation Of Coal From Iv ( T ) , V/Vi/Vii , Viiia , Viiib , Viiic , Ix , X And Xi/Xii Seams Of Patch H , New Akashkinaree Colliery , Govindpur Area , Bccl .. Submission Date for this Tender is 05-06-2021. Explosives Tenders in CMC DEPARTMENT, BCCL HQ Jharkhand. Bidders can get complete Tender details and download the document.
Name of Work: NIT No: | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Excavation in benches (In-Situ) by mechanical means at any depth in all kinds of soil, rock, including mixed soil, mixed hard soil i.e. clay soils mixed with pebbles / laterite / stone boulders, soft or hard rock etc., removal of slushy earth, mud and slurry as required, loading, transporting and unloading the excavated materials mechanically from face and disposed off outside the working area at surface OB dump in proper manner including spreading, dozing, lighting, water sprinkling, grading and other ancillary mining activities etc. all complete as per instructions/directions of Engineer-in-charge. The job involves making access trench/haul roads, dozing, grading as required for excavation operation and for transportation of excavated materials etc., all complete.\nCarriage Lead: (0-1) KM from face surface OB dump.\n | ITEM 1 | 66000 | Cum |
2 | 1.1 | Excavation in benches (In-Situ) by mechanical means at any depth in all kinds of soil, rock, including mixed soil, mixed hard soil i.e. clay soils mixed with pebbles / laterite / stone boulders, soft or hard rock etc., removal of slushy earth, mud and slurry as required, loading, transporting and unloading the excavated materials mechanically from face and disposed off outside the working area at surface/ in-pit OB dump in proper manner including spreading, dozing, lighting, water sprinkling, grading and other ancillary mining activities etc. all complete as per instructions/directions of Engineer-in-charge. The job involves making access trench/haul roads, dozing, grading as required for excavation operation and for transportation of excavated ma terials etc., all complete.\n(Blasting shall be done by department free of cost, as and when required. Supply of explosives, detonators and related materials will be made available by BCCL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the Management free of cost.\nBlasting will not be done at the places specified by Engineer-In- charge for deployment of vertical/xcentric or equivalent ripper)\nCarriage Lead: (0-1) KM from face surface/ in-pit OB dump.\n | ITEM 2 | 5.334e+06 | Cum |
3 | 1.2 | Excavation in benches (In-Situ) by mechanical means at any depth in all kinds of soil, rock, including mixed soil, mixed hard soil i.e. clay soils mixed with pebbles / laterite / stone boulders, soft or hard rock etc., removal of slushy earth, mud and slurry as required, loading, transporting and unloading the excavated materials mechanically and disposed off to Surface/ in-pit OB dump in proper manner including spreading, dozing, lighting, water sprinkling, grading and other ancillary mining activities etc. all complete as per instructions/directions of Engineer-in-charge. The job involves making access trench/haul roads, dozing, grading as required for excavation operation and for transportation of excavated materials etc., all complete.\n(Blasting shall be done by department free of cost, as and when required. Supply of explosives, detonators and related materials will be made available by BCCL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the Management free of cost.\nBlasting will not be done at the places specified by Engineer-In- charge for deployment of vertical/xcentric or equivalent ripper)\nCarriage Lead: (1-2) KM from face to Surface/ In-pit OB dump.\n | ITEM 3 | 3.691e+06 | Cum |
4 | 1.3 | Excavation in benches (In-Situ) by mechanical means at any depth in all kinds of soil, rock, including mixed soil, mixed hard soil i.e., clay soils mixed with pebbles / laterite / stone boulders, soft or hard rock etc., removal of slushy earth, mud and slurry as required, loading, transporting and unloading the excavated materials mechanically and disposed off to Surface/ in-pit OB dump in proper manner including spreading, dozing, lighting, water sprinkling, grading and other ancillary mining activities etc. all complete as per instructions/directions of Engineer-in-charge. The job involves making access trench/haul roads, dozing, grading as required for excavation operation and for transportation of excavated materials etc., all complete.\n(Blasting shall be done by department free of cost, as and when required. Supply of explosives, detonators and related materials will be made available by BCCL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the Management free of cost.\nBlasting will not be done at the places specified by Engineer-In- charge for deployment of vertical/xcentric or equivalent ripper)\nCarriage Lead: (2-3) KM from face to Surface/ In-pit OB dump.\n | ITEM 4 | 8.12e+06 | Cum |
5 | 1.4 | Excavation in benches (In-Situ) by mechanical means at any depth in all kinds of soil, rock, including mixed soil, mixed hard soil i.e. clay soils mixed with pebbles / laterite / stone boulders, soft or hard rock etc., removal of slushy earth, mud and slurry as required, loading, transporting and unloading the excavated materials mechanically and disposed off to Surface OB dump in proper manner including spreading, dozing, lighting, water sprinkling, grading and other ancillary mining activities etc. all complete as per instructions/directions of Engineer-in-charge. The job involves making access trench/haul roads, dozing, grading as required for excavation operation and for transportation of excavated materials etc., all complete.\n(Blasting shall be done by department free of cost, as and when required. Supply of explosives, detonators and related materials will be made available by BCCL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the Management free of cost.\nBlasting will not be done at the places specified by Engineer-In- charge for deployment of vertical/xcentric or equivalent ripper)\nCarriage Lead: (3-4) KM from face to Surface OB dump.\n | ITEM 5 | 1.229e+06 | Cum |
6 | 2 | Removal of dumped loose overburden by mechanical means in all kinds of soil, rock including mixed soil, mixed hard soil i.e. clay soils mixed with pebbles / laterite/ stone boulders, soft or hard rock etc., removal of slushy earth, mud & slurry as required, loading, transporting & unloading the excavated materials mechanically and disposed off outside the working zone at surface/ In-pit OB dump in proper manner on the dumping yard including spreading, dozing, lighting, water sprinkling, grading & other ancillary mining activities etc., all complete as per instructions/directions of Engineer- in charge. The job involves making access trench/haul roads, dozing, grading as required for excavation operation and for transportation of excavated materials etc., all complete.\nCarriage Lead :(1-2) KM from face to Surface/ In-pit OB dump.\n | ITEM 6 | 1.0239e+07 | Cum |
7 | 3 | Winning / extraction of coal in benches from available coal seams at any depth, blasting (Blasting shall be done by department free of cost, as and when required. Supply of explosives, detonators and related materials will be made available by BCCL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the Management free of cost. \nBlasting will not be done at the places specified by Engineer-In- charge for deployment of vertical/xcentric or equivalent ripper) including mechanical loading of coal free from extraneous materials into tippers/ dumpers, water sprinkling, dozing, lighting, grading and other ancillary mining activities and transportation of coal from face to Surface Dump etc. complete job as per instructions/directions of Engineer-in-charge. The above job also involves making and maintenance of access trench / haul road, dozing, grading and all other allied jobs required to accomplish the entire operation of winning / extraction and transportation of coal.\nCarriage Lead: (0-1) KM from face to Surface Coal Dump\n\n | ITEM 7 | 270000 | MT |
8 | 3.1 | Winning / extraction of coal in benches from available coal seams at any depth, blasting (Blasting shall be done by department free of cost, as and when required. Supply of explosives, detonators and related materials will be made available by BCCL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the Management free of cost. \nBlasting will not be done at the places specified by Engineer-In- charge for deployment of vertical/xcentric or equivalent ripper) including mechanical loading of coal free from extraneous materials into tippers/ dumpers, water sprinkling, dozing, lighting, grading and other ancillary mining activities and transportation of coal from face to Surface Dump etc. complete job as per instructions/directions of Engineer-in-charge. The above job also involves making and maintenance of access trench / haul road, dozing, grading and all other allied jobs required to accomplish the entire operation of winning / extraction and transportation of coal.\nCarriage Lead: (1-2) KM from face to Surface Coal Dump\n | ITEM 8 | 2.601e+06 | MT |
9 | 3.2 | Winning / extraction of coal in benches from available coal seams at any depth, blasting (Blasting shall be done by department free of cost, as and when required. Supply of explosives, detonators and related materials will be made available by BCCL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the Management free of cost. \nBlasting will not be done at the places specified by Engineer-In- charge for deployment of vertical/xcentric or equivalent ripper) including mechanical loading of coal free from extraneous materials into tippers/ dumpers, water sprinkling, dozing, lighting, grading and other ancillary mining activities and transportation of coal from face to Surface Dump etc. complete job as per instructions/directions of Engineer-in-charge. The above job also involves making and maintenance of access trench / haul road, dozing, grading and all other allied jobs required to accomplish the entire operation of winning / extraction and transportation of coal.\nCarriage Lead: (2-3) KM from face to Surface Coal Dump\n | ITEM 9 | 549000 | MT |
10 | 4 | Drilling in Coal and OB by crawler mounted drill at any depth in all kinds of soil, rock, including mixed soil, mixed hard soil or hard rock, coal etc. water sprinkling, dozing and other ancillary mining activities etc. all complete as per instructions/directions of Engineer-in-charge. | ITEM 10 | 1.057e+06 | Metre |
11 | 5 | Ripping/extraction of In-Situ Hard OB by deploying vertical/Xcentric or equivalent ripper at any depth in all kinds of soil, rock, including mixed soil, mixed hard soil i.e. clay soils mixed with pebbles / laterite / stone boulders, soft or hard rock etc., and other ancillary mining activities etc. all complete as per instructions/directions of Engineer-in-charge. | ITEM 11 | 6.784e+06 | Cum |
12 | 6 | Ripping/extraction in Coal by deploying vertical/xcentric or equivalent ripper at any depth with other ancillary mining activities etc. all complete as per instructions/directions of Engineer-in-charge. | ITEM 12 | 1.12905e+06 | Cum |
13 | 7 | Total impact of GST for the purpose of CTC | ITEM 21 | 1 | Nos |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail