| 1 | 1 | Taking down window type Air Conditioner of 1.0 TR/1.5 TR / 2.0 TR, cleaning completely the cooling coil initially with hand blower, spraying with soap water solution and finally clean with clear water and refixing at same location with testing complete all as specified and directed by the Engineer-in-Charge. | | 20 | Each Job |
|---|
| 2 | 2 | Dismantling covers of out-door and in-door units of split type Air Conditioner of capacity 1.0TR/1.5TR/2.0TR, cleaning completely the condenser coil and cooling coil initially with hand blower, spraying with soap water solution and finally clean with clear water, re-fixing the covers in same position complete all as specified and directed by the Engineer-in-Charge. | | 22 | Each Job |
|---|
| 3 | 3 | Carrying out pressure leak test by Nitrogen gas pressure for detecting leak in condensing unit refrigerant pipe and repairing the leak by welding or brazing of condensing unit and refrigerant pipe, putting under pressure for leak checking after repairs of leak pipe excluding gas charging and transporting & carrying out T&P required at site for Window type AC of capacity up to 2.0 TR complete all as specified and directed by the Engineer-in-Charge. | | 10 | Each Job |
|---|
| 4 | 4 | Carrying out pressure leak test by Nitrogen gas pressure for detecting leak in condensing unit refrigerant pipe and repairing the leak by welding or brazing of condensing unit and refrigerant pipe, putting under pressure for leak checking after repairs of leak pipe excluding gas charging and transporting & carrying out T&P required at site for Split type AC of capacity upto 2.0 TR complete all as specified and directed by the Engineer-in-Charge. | | 10 | Each Job |
|---|
| 5 | 5 | Carrying out pressure leak test by Nitrogen gas pressure for detecting leak in condensing unit refrigerant pipe and repairing the leak by welding or brazing of condensing unit and refrigerant pipe, putting under pressure for leak checking after repairs of leak pipe excluding gas charging and transporting & carrying out T&P required at site for Refrigerator of capacity upto 340 Litres complete all as specified and directed by the Engineer-in-Charge. | | 2 | Each Job |
|---|
| 6 | 6 | Carrying out pressure leak test by Nitrogen gas pressure for detecting leak in condensing unit refrigerant pipe and repairing the leak by welding or brazing of condensing unit and refrigerant pipe, putting under pressure for leak checking after repairs of leak pipe excluding gas charging and transporting & carrying out T&P required at site for Water Cooler of Capacity 40 Litres to 150 Litres complete all as specified and directed by the Engineer-in-Charge. | | 4 | Each Job |
|---|
| 7 | 7 | Taking out defective blower motor from Window type AC of capacity 1.0/1.5/2.0 TR and transporting defective motor of any make & capacity from site to contractor workshop dismantling the burnt winding & rewinding of 1 / 5 to 1 / 8 HP blower motor with the required size of super enameled copper winding wire of suitable gauge including insulation, varnishing, greasing, testing complete and transporting to back to site and refixing complete all as specified and directed by the Engineer-in-Charge. | | 6 | Each Job |
|---|
| 8 | 8 | Taking out defective blower motor from Split type AC of capacity 1.0/1.5/2.0 TR and transporting defective motor of any make & capacity from site to contractor workshop dismantling the burnt winding & rewinding of 1 / 5 to 1 / 8 HP blower motor with the required size of super enameled copper winding wire of suitable gauge including insulation, varnishing, greasing, testing complete and transporting to back to site and refixing complete all as specified and directed by the Engineer-in-Charge. | | 6 | Each Job |
|---|
| 9 | 9 | Taking out defective blower motor from Water Cooler of capacity upto 150 Litres and transporting defective motor of any make & capacity from site to contractor workshop dismantling the burnt winding & rewinding of 1 / 5 to 1 / 8 HP blower motor with the required size of super enameled copper winding wire of suitable gauge including insulation, varnishing, greasing, testing complete and transporting to back to site and refixing complete all as specified and directed by the Engineer-in-Charge. | | 2 | Each Job |
|---|
| 10 | 10 | Labour only for collecting the complaints of various wards/departments etc pertaining to Split/window type ACs of any capacity/make from concerned JE E/M of AGE E/M, attendending these at site to asses the actual fault after opening of ACs and fixing only spares required to make it fully functional in all respect and handing over the report duly signed by the user by name to concern JE E/M complete all as specified and directed by the Engineer-in-Charge. \nNote :- Spare parts shall be measured and paid separately under appropriate Items Nos. 10.01 to 10.19 here-in- after. | | 60 | Each Job |
|---|
| 11 | 10.01 | Supply only running capacitor of capacity 36 Mfd in plastic container | | 10 | Each |
|---|
| 12 | 10.02 | Supply only running capacitor of capacity 4 Mfd in plastic container \n\n | | 10 | Each |
|---|
| 13 | 10.03 | Supply only Capillary Tube (Copper) of size same as existing \n\n | | 15 | Each |
|---|
| 14 | 10.04 | Supply only Filter Strainer \n\n | | 5 | Each |
|---|
| 15 | 10.05 | Supply only starting relay for 1.00/1.5/2.00 TR compressor | | 5 | Each |
|---|
| 16 | 10.06 | Supply only Selector Switch for Window AC | | 3 | Each |
|---|
| 17 | 10.07 | Supply only Air filter made out Plastic frame and Nylon net suitable for any capacity split AC of any Make and model | | 3 | Each |
|---|
| 18 | 10.08 | Supply only Thermostat Switch \n | | 6 | Each |
|---|
| 19 | 10.09 | Supply only Contactor Relay suitable for any capacity split AC of any Make and model | | 6 | Each |
|---|
| 20 | 10.1 | Supply only running capacitor of capacity 45/50 Mfd + 6 Mfd in plastic container up to 2 Ton Split AC\n\n\n | | 15 | Each |
|---|
| 21 | 10.11 | Supply only Blower Motor for Window type AC upto 2 Ton Capacity \n | | 6 | Each |
|---|
| 22 | 10.12 | Supply only Blower Motor for Split type AC upto 2 Ton Capacity | | 6 | Each |
|---|
| 23 | 10.13 | Supply only front grill for window type AC of 1.0/1.5/ 2.0 TR | | 2 | Each |
|---|
| 24 | 10.14 | Supply only PCB Board for Split type AC | | 15 | Each |
|---|
| 25 | 10.15 | Supply only Rubber bushing for blower motor for Window/Split type AC of any capacity | | 4 | Each |
|---|
| 26 | 10.16 | Supply only Swing motor for split type AC of capacity 1.0 TR/1.5TR/2.0TR | | 3 | Each |
|---|
| 27 | 10.17 | Supply only Display assembly for spilit type AC of any capacity | | 2 | Each |
|---|
| 28 | 10.18 | Supply only Starting capacitor of capacity 100/120 mfd in plastic/metal container | | 10 | Each |
|---|
| 29 | 10.19 | Supply only Sensor for Indoor unit of Window/Split type AC any capacity | | 2 | Each |
|---|
| 30 | 11 | Supply and fixing in repair Sealed unit Compressor reciprocating type for Window/Split type AC of 1.5 Ton capacity complete all as specified and directed by the Engineer-in-Charge. \nMake : Tecumseh/Kirloskar/Emarson compland/Wirlpool\n | | 1 | Each |
|---|
| 31 | 12 | Supply and fixing in repair Sealed unit Compressor reciprocating type for Window/Split type AC of 2 Ton capacity complete all as specified and directed by the Engineer-in-Charge. \nMake : Tecumseh/Kirloskar/Emarson compland/Wirlpool\n | | 1 | Each |
|---|
| 32 | 13 | Supply and fixing in repair Sealed unit Compressor rotary type for Window/Split type AC of 1.5 Ton capacity complete all as specified and directed by the Engineer-in-Charge. \n Make : Tecumseh/Kirloskar/Emarson compland/Wirlpool\n | | 3 | Each set |
|---|
| 33 | 14 | Supply and fixing in repair Sealed unit Compressor rotary type for Window/Split type AC of 2.0 Ton capacity complete all as specified and directed by the Engineer-in-Charge. \nMake : Tecumseh/Kirloskar/Emarson compland/Wirlpool\n | | 3 | Each set |
|---|
| 34 | 15 | Supply and fixing in repair Refrigerator compressor for Refrigerator of capacity upto 260 Ltrs complete all as specified and directed by the Engineer-in-Charge. \nMake : Tecumseh/Kirloskar/Emarson compland/Wirlpool | | 1 | Each |
|---|
| 35 | 16 | Supply and fixing in repair Water cooler compressor for Water Cooler of capacity above 40 litres and up to 150 ltrs complete all as specified and directed by the Engineer-in-Charge. \n | | 1 | Each |
|---|
| 36 | 17 | Supply and fixing in repair Refrigerator compressor for Refrigerator of capacity above 260 litres and upto 440 Ltrs complete all as specified and directed by the Engineer-in-Charge. \n | | 1 | Each |
|---|
| 37 | 18 | Supply and fixing in repair flexible drain pipe including provision of necessary accessories for fixing of drain pipe and testing complete for proper functioning for split type AC complete all as specified and directed by the Engineer-in-Charge. | | 12 | RM |
|---|
| 38 | 19 | Labour only for collecting the complaints of various wards/departments etc pertaining to Refrigerators of any capacity/make from concern JE E/M of AGE E/M, attendending these at site to asses the actual fault after opening of refrigerator and fixing only spares required to make it fully functional in all respect and handing over the report duly signed by the user by name to concern JE E/M complete all as specified and directed by the Engineer-in-Charge. \nNote :- Spare parts shall be measured and paid separately under appropriate Item Nos. 19.01 to 19.14 here-in-after. | | 6 | Each Job |
|---|
| 39 | 19.01 | Supply only Condenser coil. | | 2 | Each |
|---|
| 40 | 19.02 | Supply only Pin/Thread type lamp holder. | | 2 | Each |
|---|
| 41 | 19.03 | Supply only Bulb 15 watt (Pin/Thread type). | | 2 | Each |
|---|
| 42 | 19.04 | Supply only Ice tray. | | 2 | Each |
|---|
| 43 | 19.05 | Supply only Open type relay with overload protector. | | 2 | Each |
|---|
| 44 | 19.06 | Supply only Thermostat auto defrost. | | 2 | Each |
|---|
| 45 | 19.07 | Supply only Capillary tube (copper) as per existing. | | 2 | Each |
|---|
| 46 | 19.08 | Supply only Chill tray. | | 2 | Each |
|---|
| 47 | 19.09 | Supply only Ice Chamber for Refrigerator of capacity up to 340 Ltr. | | 2 | Each |
|---|
| 48 | 19.1 | Supply only Vegetable box. | | 2 | Each |
|---|
| 49 | 19.11 | Supply only Bimetal Relay. | | 2 | Each |
|---|
| 50 | 19.12 | Supply only Heating Element. | | 2 | Each |
|---|
| 51 | 19.13 | Supply only Frost free fan motor. | | 2 | Each |
|---|
| 52 | 19.14 | Supply only Timer. | | 2 | Each |
|---|
| 53 | 20 | Labour only for collecting the complaints of various wards/departments etc pertaining to Water Coolers of any capacity/make from concern JE E/M of AGE E/M, attendending these at site to asses the actual fault after opening of water coolers and fixing only spares required to make it fully functional in all respect and handing over the report duly signed by the user by name to concern JE E/M complete all as specified and directed by the Engineer-in-Charge. \nNote :- Spare parts shall be measured and paid separately under appropriate Item Nos. 20.01 to 20.11 here-in- after. | | 12 | Each Job |
|---|
| 54 | 20.01 | Supply only Push type tap copper alloy chromium plated 15 mm bore. | | 5 | Each |
|---|
| 55 | 20.02 | Supply only Rubber lining for top cover gasket (3 metre approx each cooler). | | 5 | Each |
|---|
| 56 | 20.03 | Supply only Starting relay suitable for 5/8 HP motor.\n | | 5 | Each |
|---|
| 57 | 20.04 | Supply only Starting capacitor 80/100 mfd.\n | | 5 | Each |
|---|
| 58 | 20.05 | Supply only Thermostat.\n | | 5 | Each |
|---|
| 59 | 20.06 | Supply only Float valve Brass with fly nut screwed as per existing. | | 5 | Each |
|---|
| 60 | 20.07 | Supply only Over load protector.\n | | 5 | Each |
|---|
| 61 | 20.08 | Supply only Capilary tube as per existing size (Copper). | | 5 | Each |
|---|
| 62 | 20.09 | Supply only Blower motor as per existing. | | 5 | Each |
|---|
| 63 | 20.1 | Supply only CP Basin tray. | | 5 | Each |
|---|
| 64 | 20.11 | Supply only Running capacitor 15 mfd.\n | | 5 | Each |
|---|
| 65 | 21 | Supply and charging refrigeration gas R-22 for Split/window AC/water cooler complete all as specified and directed by the Engineer-in-Charge. \n | | 30 | Kg |
|---|
| 66 | 22 | Dismantling, shifting and refixing of split type AC of capacity 1.5 to 2.0 TR including proper arrangement to keep outer unit (Angle iron with nut bolt) and excluding gas charging in the unit complete all as specified and directed by the Engineer-in-Charge. | | 2 | Each |
|---|
| 67 | 23 | Supply and fixing in repair sheet metal enclosure single pole and neutral with two pin and earth plug complete with one single pole MCB 20 Amps 240 volt complete all as specified and directed by the Engineer-in-Charge. \n | | 6 | Each |
|---|
| 68 | 24 | Taking down out door unit of Split type AC 1.5TR/2.0 TR capacity removing unserviceable AC stand/angle iron bracket fixing new AC stand/angle iron bracket in repair (including two coats of paint over a red oxide primer) fixing to the wall by foundation bolts refixing the out door unit connecting the suction and discharge line complete inluding testing for efficient running complete all as specified and directed by the Engineer-in-Charge. | | 2 | Each |
|---|
| 69 | 25 | Taking out Voltage Stablizer of capacity upto 3 KVA to 5 KVA, transporting it to workshop, dismantling transformer unit, auto transformer barrier, electric circuit board etc with all cable connections carrying out repair/replacement of push on switch, transistor, capacitor, relay transistor, diode, condensor, voltmeter, PVC connector, indicator lamp, cut out, MCB etc , testing and commisioning to make it fully functionable complete all as specified and directed by the Engineer-in-Charge. | | 15 | Each Job |
|---|
| 70 | 26 | Taking down geyser of 50/35/25 ltrs capacity from its position after disconnecting water connections, opening of geyser to take out inner tank, examining the points of leakage and soldering the points to stop leakage, scraping and brushing down old paint with emery paper, applying two coats of white paint using spray machine spray painting and writing of MES No by black paint, complete all as specified and directed by the Engineer-in-Charge. | | 30 | Each |
|---|
| 71 | 27 | Dismantling of existing unserviceable apparatus plate from Geyser of 50 litres capacity and Supply and fixing in repair new copper apparatus plate of same thickness so as to match the existing one with rubber gasket complete all as specified and directed by the Engineer-in-Charge. | | 3 | Each |
|---|
| 72 | 28 | All as per Item No. 27.00 above but for Geyser of 25/35 litres capacity. | | 3 | Each |
|---|
| 73 | 29 | Supply and fixing in repair glass wool suitable for geyser of any capacity complete all as specified and directed by the Engineer-in-Charge. | | 3 | Kg |
|---|
| 74 | 30 | Dismantling of existing unserviceable heating element from geyser and Supply and fixing in repair new heating element of 1.5 kw 230 volt, testing for its functionality and refixing all electrical and water connections complete all as specified and directed by the Engineer-in-Charge. | | 15 | Each |
|---|
| 75 | 31 | All as per item No 30.00 above but of 2.0 kw 230 volt element. | | 15 | Each |
|---|
| 76 | 32 | Dismantling of existing old unserviceable thermostat of Geyser of any capacity and Supply and fixing in repair new thermostat with specifications to match with the existing one, including refixing all connections, testing for functionality etc. complete all as specified and directed by the Engineer-in-Charge. | | 20 | Each |
|---|
| 77 | 33 | Supply and fixing in repair PVC Connection pipe 15 mm dia 60 cm long heavy duty with two Nos brass chromium plated union complete all as specified and directed by the Engineer-in-Charge. \n | | 20 | Each |
|---|
| 78 | 34 | Material and labour for painting of Refrigerator/Water cooler with two coats of DUCO paint (ISI grade) white using spray machine spray painting including cleaning, washing, preparation of old painted surfaces complete all as specified and directed by the Engineer-in-Charge. | | 3 | Each |
|---|
| 79 | 35 | Taking down unserviceable stop valve and supply and fixing new stop valve CP of 15 mm bore complete all as specified and directed by the Engineer-in-Charge. | | 2 | Each |
|---|
| 80 | 36 | Supply and Charging R-134 gas for Refrigerator complete all as specified and directed by the Engineer-in-Charge. | | 4 | Kg |
|---|
| 81 | 37 | Taking down old rusted clamps, nuts, bolts, washers etc in complete set and supply and fixing new clamp, nut, bolt, washer in complete set for hanging gyser complete all as specified and directed by the Engineer-in-Charge. | | 4 | Each set |
|---|
| 82 | 38 | Taking down carefully unserviceable indoor electronic type PCB from Split type AC of capacity 1.5 to 2.0 Ton repairing and refixing complete all as specified and directed by the Engineer-in-Charge. | | 9 | Each |
|---|
| 83 | 39 | Supply only outdoor fins type aluminium/copper condensor for Split type AC of capacity 2.0 Ton complete all as specified and directed by the Engineer-in-Charge. | | 6 | Each |
|---|