Drilling Of 150 Mm And 115 Mm Dia, New Borewell Installation Of Im-Ll Hand Pump Set And Construction Of Platform For Various Rural Areas In Jalna Dist. , For 150Mm Dia Borewelldrilling Drilling Of 150 Mm Dia Borewell. ( Drilling Of 200 Mm Dia. In Soft Strata And 150 Mm Dia Drilling In Hard Rocks Including Machinery, Fuel Transportation Andlabourcharges.Onsite Ofborewell To Be Drill. ) , Yeild Testingof Borewellusing90 Degreev Notch By Air Lift Method For 150 Mm Dia.Borewell Work. , Providing & Fixing 180 Mm Dia Pvc Casingpipe For Drilling150 Mm Dia Borewell Has Presure6kg / Cm2as Per Is : 4985-1988Standard, ( Including Lowering, Laying Handlinggroutingetc ) , Providing And Fixing 1 Sqmpvc Casingpipe 8 Kg / Cm2 Is 4985-1988 In Dry Rubble Stone ( If Casing Pipe More Than 40 Feets ) , Providing And Fixing 180 Mmpvc Casingpipe 8 Kg / Cm2 Is 4985-1988 Casing Lowering And Grounting Up To 12 Mtr. , Providing And Fixing 180 Mmpvc Casingpipe 6 Kg / Cm2 / 8 Kg / Cm2 Is 4985-1988 Casing Lowering And Grounting In To 12 Mtr. , Providing And Fixing Pvcbore Cap For 180 Mm Dia Pvc Casingpipe For 150 Mm Dia Borewell. , For 115 Mm Dia Borewelldrillingdrilling Of 115 Mm Dia, Borewell Work, ( Drilling Of 150 Mm Dia. In Soft Rock And 115 Mm Dia Drillingworkin Hard Rocks , Includingmachinery, Fuel Transportationchargesof Rig, Labourcharges On Site Of Borewellto Be Drill. , Aftercompletionof 115Mm Dia.Borewelldrillingyield Testingof Borewell By 90 Degree Vnotchby Airlift Method , For Unconventionalwork.140 Mm Dia, Pvc Casingpipeof 4 Kg / Cm2 For 115Mmdia. Drillingworkasper Is 4985-1988Withoutgrouting, Includinglowering Laying Handing Etc. , Providing And Fixing 140 Mm Dia, Pvc Casingpipe For 115Mm Dia, Borewell Has 4Kg / Cm2pressureand As Per Is: 4985-1988 Standard. Including Lowering, Handling, Grouting Etc. For Unconventional. , Providing And Fixing 140 Mm Dia4 Kg / Cm2 Pvc Pipe For Unconventional Hole. , Providing And Fixing 140 Mm Dia4 Kg / Cm2 Pvc Pipe Lowering And Grounting Etc. Complate Forunconventional Hole. , Pvcbore Cap For 140 Mm Dia Pvc Casingpipe. , Installationof Indiamark -Lihandpump Seton Borewell. , Excavationworkforpreparingh.P. Platform Total Excavation- 2.6M3 , Dry Rubble Stonefillingwork Beforethe Constructionof Platform.Total Dryrubble Stonefillingwork ( 2.328M 3 ) , Constructionof Platformas Per Unicef Designpcc .M-150 Work Should Be In1:2:4 Totalp.C.C.Work -1.143 M3 , Transportation On Up To 40 Km Per Handpump Installation And Construction Of Platform.Tip - Hand Pump Platform Construction As Per Gsda Plan. , Providing And Fixing Special Water Chamber For Duel Pump ( Galvonised ) , Providing And Fixing Stainless Steel Bottam Nipple For Duel Pump. , Yeild Testingof Borewellby Electrical Or Generetor Etc. Comp. , For Hydrofacturing, Flushing, Borewell Special Repair, Yeld Test Hand Pump Removal And Installation. , Redrilling / Flusing Of Borewell 150 Mm / 115 Mm By Machinery With Transportation With Fuel Etc. Comp.