Numaligarh Refinery Limited has published Epcc-1 Cdu Vdu Unit Epcc-1 Package ( Crude Distillation Unit ( Cdu ) Vacuum Distillation Unit ( Vdu ) With Amine Treating Unit ( Atu ) ) For Numaligarh Refinery Expansion Project At Nrl Numaligarh Refinery , Numaligarh , Assam , India. Submission Date for this Tender is 19-08-2021. Electrical Products Tenders in NUMALIGARH Assam. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 20-May-2021 | CORRIGENDUM 01 | Date | 05-07-2021 |
2 | 20-May-2021 | ADDENDUM 01 | Terms and Conditions | 05-08-2021 |
3 | 28-May-2021 | CORRIGENDUM 02 | Date | 05-07-2021 |
4 | 07-Jun-2021 | CORRIGENDUM 03 | Date | 05-07-2021 |
5 | 10-Jun-2021 | PRE BID QUERIES RESPONSE | Other | 05-07-2021 |
6 | 10-Jun-2021 | ADDENDUM 02 | Terms and Conditions | 05-08-2021 |
7 | 11-Jun-2021 | PRE BID QUERIES TECHNICAL | Other | 05-07-2021 |
8 | 13-Jun-2021 | ADDENDUM 03 | Terms and Conditions | 05-07-2021 |
9 | 22-Jun-2021 | PRE BID QUERIES TECHNICAL RESPONSE 02 | Other | 05-07-2021 |
10 | 25-Jun-2021 | CORRIGENDUM 04 | Date | 05-08-2021 |
11 | 25-Jun-2021 | ADDENDUM 04 | Terms and Conditions | 05-08-2021 |
12 | 03-Jul-2021 | REFER ATTACHED ADDENDUM 05 | Terms and Conditions | 05-08-2021 |
13 | 03-Jul-2021 | PREBID QUERIES RESPONSE | Other | 05-08-2021 |
14 | 08-Jul-2021 | Addendum 06 Technical | Terms and Conditions | 05-08-2021 |
15 | 09-Jul-2021 | PRE BID QUERIES TECHNICAL RESPONSE 04 | Other | 05-08-2021 |
16 | 13-Jul-2021 | ADDENDUM 07 COMMERCIAL | Terms and Conditions | 05-08-2021 |
17 | 13-Jul-2021 | PREBID QUERIES RESPONSE 02 COMMERCIAL | Other | 05-08-2021 |
18 | 20-Jul-2021 | CQ RESPONSE 03 | Other | 05-08-2021 |
19 | 21-Jul-2021 | ADDENDUM 08 COMMERCIAL | Terms and Conditions | 05-08-2021 |
20 | 23-Jul-2021 | ADDENDUM 09 TECHNICAL | Terms and Conditions | 05-08-2021 |
21 | 23-Jul-2021 | Prebid Queries Technical Response 5 | Other | 05-08-2021 |
22 | 29-Jul-2021 | ADDENDUM 10 COMMERCIAL | Terms and Conditions | 05-08-2021 |
23 | 29-Jul-2021 | TQ RESPONSE 6 | Other | 05-08-2021 |
24 | 29-Jul-2021 | CORRIGENDUM_5_CDU_VDU_Tender | Date | 19-08-2021 |
25 | 30-Jul-2021 | Addendum_11_CDU VDU_Tender | Terms and Conditions | 19-08-2021 |
26 | 30-Jul-2021 | Addendum 12 | Terms and Conditions | 19-08-2021 |
27 | 31-Jul-2021 | Addendum 13 TECHNICAL | Terms and Conditions | 19-08-2021 |
28 | 06-Aug-2021 | ADDENDUM 14 TECHNICAL | Terms and Conditions | 19-08-2021 |
29 | 06-Aug-2021 | TQ RESPONSE 7 | Other | 19-08-2021 |
30 | 10-Aug-2021 | Addendum 15 | Terms and Conditions | 19-08-2021 |
31 | 12-Aug-2021 | TQ Response 08 | Other | 19-08-2021 |
32 | 12-Aug-2021 | Addendum 16 | Other | 19-08-2021 |
Name of Work: EPCC-1 Package - CRUDE DISTILLATION UNIT (CDU) / VACCUM DISTILLATION UNIT (VDU) WITH AMINE TREATING UNIT (ATU) FOR NUMALIGARH REFINERY EXPANSION PROJECT AT NRL NUMALIGARH REFINERY, GOLAGHAT, ASSAM, INDIA | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Project Management, Consistency Checks, Residual Process Engineering, Detailed Design Engineering including HAZOP/HAZID/SIL Study & Other Safety Studies as mentioned in Bidding Documents, Site development and enabling jobs, Topography Survey, Soil Investigation and underground scanning mentioned in the bidding documents and co-ordination for the same with Owner/ MPMC, Total Procurement (including chemicals, first fill of chemicals and lubricants consumables, special tools and tackles, Pre-Commissioning Spares, Commissioning Spares, Start-up spares & Mandatory spares), Fabrication, Manufacturing, Quality Assurance, Inspection & Expediting, Third Party Inspection, Supplies, Transportation, Insurance, Handling & Storage of all Equipment, Materials, items and other Construction Materials at yard/site, Fabrication, Assembly, Construction, Erection, Installation of all plant machinery including Civil, Structural, Mechanical, Piping, Electrical and Instrumentation including tie-ins, Testing, Insulation and refractory works, Painting, Fireproofing, First fill of chemicals and lubricants, Obtaining all Statutory Approvals (except for Environment Clearance), Mechanical Completion including Pre-commissioning of Plant, Preparation of Plant specific operating manuals, Start-up, Commissioning and Performance Guarantee Test Runs (PGTR), Training of Owner’s O&M personnel, consumables (Chemicals & Lubricants) for 6 (six) months operation, Contract closure activities of CRUDE DISTILLATION UNIT (CDU) / VACCUM DISTILLATION UNIT (VDU) WITH AMINE TREATING UNIT (ATU) and Common Substation for the Units as detailed in Biding Documents and interconnection systems as per Biding Documents, Final invoice/billing and handing over of the facilities with Final and “As Built” drawing/documentation, Project data & information handing over specification as per Bidding Documents, supply of spares with necessary support and services during Defect Liability Period and supply of Chemicals, Tool & Tackles, Consumables, Lubricants etc. for initial charge and replenishment of any loss of these during Commissioning up to handing over after successful PGTR of the facilities. | BI01010001010000000000000515BI0100001112 | ||
2 | 1.01 | INDIAN CURRENCY PART | BI01010001010000000000000515BI0100001113 | 1 | Lumpsum |
3 | 1.02 | FOREIGN CURRENCY (Foreign Currency-1) | BI01010001010000000000000515BI0100001114 | 1 | Lumpsum |
4 | 1.03 | FOREIGN CURRENCY (Foreign Currency-2) | BI01010001010000000000000515BI0100001115 | 1 | Lumpsum |