Power Development Department has published Rate Contract For Handling Of Various Material In Divisional Stores At Miran Sahib Of Electric Division-Ii Jpdcl Gandhi Nagar Jammu For The Financial Year 2021-22. Submission Date for this Tender is 03-05-2021. Bags Supply Tenders in Executive Engineer ED-II Jammu Jammu And Kashmir. Bidders can get complete Tender details and download the document.
Name of Work: Fixing of Rate Contract for handling of various material in Divisional stores at Miran Sahib of Electric Division-II JPDCL Gandhi Nagar Jammu. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Unloading of PCC Poles 11 Mtr Long | item1 | 1 | No |
2 | 2 | Unloading of PCC Poles 9 Mtr Long | item2 | 1 | No |
3 | 3 | Unloading of PCC Poles 8 Mtr Long | item3 | 1 | No |
4 | 4 | Unloading of ST Poles 13 Mtr Long | item4 | 1 | No |
5 | 5 | Unloading of ST Poles 11Mtr Long | item5 | 1 | No |
6 | 6 | Unloading of ST Poles 9 Mtr Long | item6 | 1 | No |
7 | 7 | Unloading of ST Poles 8 Mtr Long | item7 | 1 | No |
8 | 8 | Loading of PCC Poles 11 Mtr Long | item8 | 1 | No |
9 | 9 | Loading of PCC Poles 9 Mtr Long | item9 | 1 | No |
10 | 10 | Loading of PCC Poles 8 Mtr Long | item10 | 1 | No |
11 | 11 | Loading of ST Poles 13 Mtr Long | item11 | 1 | No |
12 | 12 | Loading of ST Poles 11Mtr Long | item12 | 1 | No |
13 | 13 | Loading of ST Poles 9 Mtr Long | item13 | 1 | No |
14 | 14 | Loading of ST Poles 8 Mtr Long | item14 | 1 | No |
15 | 15 | Dragging of PCC/ST Poles at an average distance upto 50 Mtr for stacking to accesible place for loading/Unoading Purpose and its stacking | item15 | 1 | No |
16 | 16 | Unloading of /New ACSR Conductor | item16 | 1 | Kg |
17 | 17 | Loading of Old/New ACSR Conductor | item17 | 1 | Kg |
18 | 18 | Shifting of Old/New ACSR Conductor from unloading site to stacking site at an average distance upto 50 Mtr and its stacking | item18 | 1 | Kg |
19 | 19 | Shifting of Old/New ACSR Conductor to other place for making space for other store material at an average distance upto 50 Mtr and its stacking | item19 | 1 | Kg |
20 | 20 | Unloading of 25 KVA Transformer(New/Write BackTransformer) | item20 | 1 | No |
21 | 21 | Unloading of 63 KVA Transformer(New/Write BackTransformer) | item21 | 1 | No |
22 | 22 | Unloading of 100 KVA Transformer(New/Write BackTransformer) | item22 | 1 | No |
23 | 23 | Unloading of 250 KVA Transformer(New/Write BackTransformer) | item23 | 1 | No |
24 | 24 | Unloading of 400 KVA Transformer(New/Write BackTransformer) | item24 | 1 | No |
25 | 25 | Unloading of 630 KVA Transformer(New/Write BackTransformer) | item25 | 1 | No |
26 | 26 | Loading of 25 KVA Transformer | item26 | 1 | No |
27 | 27 | Loading of 63 KVA Transformer | item27 | 1 | No |
28 | 28 | Loading of 100 KVA Transformer | item28 | 1 | No |
29 | 29 | Loading of 250 KVA Transformer | item29 | 1 | No |
30 | 30 | Loading of 400 KVA Transformer | item30 | 1 | No |
31 | 31 | Loading of 630 KVA Transformer | item31 | 1 | No |
32 | 32 | Dragging of existing /New /Damaged 25 KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly | item32 | 1 | No |
33 | 33 | Dragging of existing /New 63 KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly | item33 | 1 | No |
34 | 34 | Dragging of existing /New /Damaged 100 KVA Tranformer at an average distance upto 50 Mtrfrom unloading site to stacking site and its stacking properly | item34 | 1 | No |
35 | 35 | Dragging of existing /New /Damaged 250 KVA Tranformer at an average distance upto 50 Mtrfrom unloading site to stacking site and its stacking properly | item35 | 1 | No |
36 | 36 | Dragging of existing /New/Damaged 400KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly | item36 | 1 | No |
37 | 37 | Dragging of existing /New/Damaged 630KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly | item37 | 1 | No |
38 | 38 | Dragging of existing /New /Damaged 25 KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking | item38 | 1 | No |
39 | 39 | Dragging of existing /New 63 KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking | item39 | 1 | No |
40 | 40 | Dragging of existing /New /Damaged 100 KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking | item40 | 1 | No |
41 | 41 | Dragging of existing /New /Damaged 250 KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking | item41 | 1 | No |
42 | 42 | Dragging of existing /New/Damaged 400KVA Tranformer at an average distance upto 50 Mtrfor making space for other store material and its stacking | item42 | 1 | No |
43 | 43 | Dragging of existing /New/Damaged 630KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking | item43 | 1 | No |
44 | 44 | Unloading of Channel/Angle/Flat Iron | item44 | 1 | Kg |
45 | 45 | Loading of Channel/Angle/Flat Iron | item45 | 1 | Kg |
46 | 46 | Shifting of Channel/Angle/Flat Iron at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly | item46 | 1 | Kg |
47 | 47 | Shifting of Channel/Angle/Flat Iron at an average distance upto 50 Mtr for making space for other store material and its stacking | item47 | 1 | Kg |
48 | 48 | Unloading of Link/Knife/HG/DO/LA Set | item48 | 1 | set |
49 | 49 | Loading of Link/Knife/HG/DO/LA/GO Set | item49 | 1 | set |
50 | 50 | Unloading of CT/PT Unit | item50 | 1 | No |
51 | 51 | Loading of CT/PT Unit | item51 | 1 | No |
52 | 52 | Unloading of DPC CU/AL Wire | item52 | 1 | kg |
53 | 53 | Unloading of Bush Rods and other allied workshop material | item53 | 1 | kg |
54 | 54 | Unloading of allied material for HT/LT Line/Substations(i.e. Disc/Pin/Shackle/Busbar Insulators/Al Busbar/GI/Guy wire/Thimbles/earthing rods etc) | item54 | 1 | kg |
55 | 55 | Loading of allied material for HT/LT Line/Substations/workshop material(i.e. Disc/Pin/Shackle/Busbar Insulators/Al Busbar/GI/Guy wire/Thimbles/earthing rods/Cu/Al Wire /Bushrods etc etc) | item55 | 1 | kg |
56 | 56 | Shifting of allied material for HT/LT Line/Substations(i.e. Disc/Pin/Shackle/Busbar Insulators/Al Busbar/GI/Guy wire/Thimbles/earthing rods etc)from unloading site to stacking site and stacking properly | item56 | 1 | kg |
57 | 57 | Shifting of allied material for HT/LT Line/Substations/workshop material(i.e. Disc/Pin/Shackle/Busbar Insulators/Al Busbar/GI/Guy wire/Thimbles/earthing rods/Al/Cu wire/bush rods etc) for making space for other store material | item57 | 1 | kg |
58 | 58 | Unloading/Loading of Bammboo Ladder | item58 | 1 | No |
59 | 59 | Unloading/Loading of Single/Three Phase Meters | item59 | 1 | No |
60 | 60 | Unloading of PVC Cable single core 95/120/185mmsq | item60 | 1 | Mtr |
61 | 61 | Unloading of PVC Cable single core 300/400/630mmsq | item61 | 1 | Mtr |
62 | 62 | Loading of PVC Cable single core 95/120/185mmsq | item62 | 1 | Mtr |
63 | 63 | Loading of PVC Cable single core 300/400/630mmsq | item63 | 1 | Mtr |
64 | 64 | Unloading of AB/XLPE 25/35/50/70/95mmsq Cable for HT/LT Lines | item64 | 1 | Mtr |
65 | 65 | Unloading of AB/XLPE 120/150/185/240mmsq Cable for HT/LT Lines | item65 | 1 | Mtr |
66 | 66 | Loading of AB/XLPE 25/35/50/70/95mmsq Cable for HT/LT Lines | item66 | 1 | Mtr |
67 | 67 | Loading of AB/XLPE 120/150/185/240mmsq Cable for HT/LT Lines | item67 | 1 | Mtr |
68 | 68 | Shifting of AB/XLPE25/35/50/70/95mmsq Cable for HT/LT Lines from unloading site to stacking site and stacking properly | item68 | 1 | Mtr |
69 | 69 | Shifting of AB/XLPE120/150/185/240mmsq Cable for HT/LT Lines from unloading site to stacking site and stacking properly | item69 | 1 | Mtr |
70 | 70 | Loading of Aluminium and Copper wire | item71 | 1 | kg |
71 | 71 | loading of Bush Rods and other allied Workshop material | item72 | 1 | kg |
72 | 72 | Unloading/Loading of Single phase/three phase meters | item73 | 1 | No |
73 | 73 | Stacking of Single/Three phase meters | item74 | 1 | Nos |
74 | 74 | Unloading/Loading of Straight jointer kit/Heat shrinkable Kit for AB/XLPE cables of HT/LT Lines | item83 | 1 | No |
75 | 75 | Unreeling of the ACSR Dog/Rabbit, Weasel/Squirell Conductor from the drum, measuring ,cutting ,bundling etc | item84 | 1 | Mtr |
76 | 76 | Unreeling of the XLPE/AB/PVC Single core cables of sizes from the drum, measuring , cutting ,bundling etc | item85 | 1 | Mtr |
77 | 77 | Checking/Counting/Meggering of Line/Hardware Materials viz Disc insulators with fittings, Pin insulators with pins etc | item86 | 1 | kg |
78 | 78 | Checking/Measuring/ Weighing of Line/Workorkkshop Material viz Nuts and bolts, Guy wire, GI Wire, Al. Strips, DPC Cu/Al Wire, Khakhi Paper, Lethoride Paper, Fevicol etc. | item87 | 1 | Kg |
79 | 79 | Unloading of Cement Bags | item88 | 1 | bag |
80 | 80 | Carrigae of Cement Bags from unloading site to stacking site\n(Upto 50 Mtr) | item89 | 1 | bag |
81 | 81 | Stacking of Cement bags | item90 | 1 | bag |
82 | 82 | Loading of Cement Bags | item91 | 1 | bag |
83 | 83 | Cutting of Green Vegetable Bushes , Wild Grass, trees in the store to avoid any mishappening of untoward incidents | item92 | 1 | Sqft |
84 | 84 | Carriage of Green Vegetable Bushes , Wild Grass, trees after cutting and dumping away from store | item93 | 1 | LS |
85 | 85 | Straightening of tilted fencing posts in the store premises for repair of fecning | item94 | 1 | No |
86 | 86 | Insertion of new fencing Posts in the store for repair of fencing | item95 | 1 | No |
87 | 87 | Dismantling of existing mesh fencing | item96 | 1 | Sqft |
88 | 88 | Fixing of mesh Fencing | item97 | 1 | Sqft |
89 | 89 | Fixiing of CGI Sheets | item98 | 1 | Sqft |
90 | 90 | Dismantling of CGI sheets | item99 | 1 | Sqft |
91 | 91 | Meggering, tightening of nuts and bolts, oil seals, breathers checkings, visual inspections of Transfomers 25/63/100 KVA | item100 | 1 | No |
92 | 92 | Meggering, tightening of nuts and bolts, oil seals, breathers checkings, visual inspections of Transfomers 250/400/630KVA | item101 | 1 | No |
93 | 93 | Lifting of Unserviceable items like, Damaged Transformers(Outer frame of DTs), Broken Insulators of sorts, ,Al/ Cu/ Scrap/ Bushrods of sorts, Empty barells, Broken CGI Sheerts, Iron scraps, damaged energy meters, CT/PTs sets from existing place to another suitable place and its stacking | item102 | 1 | Kg |
94 | 94 | Painting(Red oxide/Aluminium Paint) of Fabricated Material. | item103 | 1 | Kg |
95 | 95 | Unloading of old loose conductor and making bundles | item104 | 1 | Kg |
96 | 96 | Checking & maggering of 11Kv LA set HG set GO set CT/PT unit | item105 | 1 | set |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail