}

Rate Contract For Handling Of Various Material In Divisional Stores At Miran Sahib Of Electric Division-Ii Jpdcl Gandhi Nagar Jammu For The Financial Year 2021-22, Executive Engineer ED-II Jammu-Jammu And Kashmir

Power Development Department has published Rate Contract For Handling Of Various Material In Divisional Stores At Miran Sahib Of Electric Division-Ii Jpdcl Gandhi Nagar Jammu For The Financial Year 2021-22. Submission Date for this Tender is 03-05-2021. Bags Supply Tenders in Executive Engineer ED-II Jammu Jammu And Kashmir. Bidders can get complete Tender details and download the document.




Tender Notice

27741142
Rate Contract For Handling Of Various Material In Divisional Stores At Miran Sahib Of Electric Division-Ii Jpdcl Gandhi Nagar Jammu For The Financial Year 2021-22
National Competitive Bid
Indian
Jammu And Kashmir
Executive Engineer ED-II Jammu
03-05-2021

Tender Details

Rate Contract For Handling Of Various Material In Divisional Stores At Miran Sahib Of Electric Division-Ii Jpdcl Gandhi Nagar Jammu For The Financial Year 2021-22-1 Unloading Of Pcc Poles 11 Mtr Long 2 Unloading Of Pcc Poles 9 Mtr Long 3 Unloading Of Pcc Poles 8 Mtr Long 4 Unloading Of St Poles 13 Mtr Long 5 Unloading Of St Poles 11Mtr Long 6 Unloading Of St Poles 9 Mtr Long 7 Unloading Of St Poles 8 Mtr Long 8 Loading Of Pcc Poles 11 Mtr Long 9 Loading Of Pcc Poles 9 Mtr Long 10 Loading Of Pcc Poles 8 Mtr Long 11 Loading Of St Poles 13 Mtr Long 12 Loading Of St Poles 11Mtr Long 13 Loading Of St Poles 9 Mtr Long 14 Loading Of St Poles 8 Mtr Long 15 Dragging Of Pcc / St Poles At An Average Distance Upto 50 Mtr For Stacking To Accesible Place For Loading / Unoading Purpose And Its Stacking 16 Unloading Of / New Acsr Conductor 17 Loading Of Old / New Acsr Conductor 18 Shifting Of Old / New Acsr Conductor From Unloading Site To Stacking Site At An Average Distance Upto 50 Mtr And Its Stacking 19 Shifting Of Old / New Acsr Conductor To Other Place For Making Space For Other Store Material At An Average Distance Upto 50 Mtr And Its Stacking 20 Unloading Of 25 Kva Transformer ( New / Write Backtransformer ) 21 Unloading Of 63 Kva Transformer ( New / Write Backtransformer ) 22 Unloading Of 100 Kva Transformer ( New / Write Backtransformer ) 23 Unloading Of 250 Kva Transformer ( New / Write Backtransformer ) 24 Unloading Of 400 Kva Transformer ( New / Write Backtransformer ) 25 Unloading Of 630 Kva Transformer ( New / Write Backtransformer ) 26 Loading Of 25 Kva Transformer 27 Loading Of 63 Kva Transformer 28 Loading Of 100 Kva Transformer 29 Loading Of 250 Kva Transformer 30 Loading Of 400 Kva Transformer 31 Loading Of 630 Kva Transformer 32 Dragging Of Existing / New / Damaged 25 Kva Tranformer At An Average Distance Upto 50 Mtr From Unloading Site To Stacking Site And Its Stacking Properly 33 Dragging Of Existing / New 63 Kva Tranformer At An Average Distance Upto 50 Mtr From Unloading Site To Stacking Site And Its Stacking Properly 34 Dragging Of Existing / New / Damaged 100 Kva Tranformer At An Average Distance Upto 50 Mtrfrom Unloading Site To Stacking Site And Its Stacking Properly 35 Dragging Of Existing / New / Damaged 250 Kva Tranformer At An Average Distance Upto 50 Mtrfrom Unloading Site To Stacking Site And Its Stacking Properly 36 Dragging Of Existing / New / Damaged 400Kva Tranformer At An Average Distance Upto 50 Mtr From Unloading Site To Stacking Site And Its Stacking Properly 37 Dragging Of Existing / New / Damaged 630Kva Tranformer At An Average Distance Upto 50 Mtr From Unloading Site To Stacking Site And Its Stacking Properly 38 Dragging Of Existing / New / Damaged 25 Kva Tranformer At An Average Distance Upto 50 Mtr For Making Space For Other Store Material And Its Stacking 39 Dragging Of Existing / New 63 Kva Tranformer At An Average Distance Upto 50 Mtr For Making Space For Other Store Material And Its Stacking 40 Dragging Of Existing / New / Damaged 100 Kva Tranformer At An Average Distance Upto 50 Mtr For Making Space For Other Store Material And Its Stacking 41 Dragging Of Existing / New / Damaged 250 Kva Tranformer At An Average Distance Upto 50 Mtr For Making Space For Other Store Material And Its Stacking 42 Dragging Of Existing / New / Damaged 400Kva Tranformer At An Average Distance Upto 50 Mtrfor Making Space For Other Store Material And Its Stacking 43 Dragging Of Existing / New / Damaged 630Kva Tranformer At An Average Distance Upto 50 Mtr For Making Space For Other Store Material And Its Stacking 44 Unloading Of Channel / Angle / Flat Iron 45 Loading Of Channel / Angle / Flat Iron 46 Shifting Of Channel / Angle / Flat Iron At An Average Distance Upto 50 Mtr From Unloading Site To Stacking Site And Its Stacking Properly 47 Shifting Of Channel / Angle / Flat Iron At An Average Distance Upto 50 Mtr For Making Space For Other Store Material And Its Stacking 48 Unloading Of Link / Knife / Hg / Do / La Set 49 Loading Of Link / Knife / Hg / Do / La / Go Set 50 Unloading Of Ct / Pt Unit 51 Loading Of Ct / Pt Unit 52 Unloading Of Dpc Cu / Al Wire 53 Unloading Of Bush Rods And Other Allied Workshop Material 54 Unloading Of Allied Material For Ht / Lt Line / Substations ( I.E. Disc / Pin / Shackle / Busbar Insulators / Al Busbar / Gi / Guy Wire / Thimbles / Earthing Rods Etc ) 55 Loading Of Allied Material For Ht / Lt Line / Substations / Workshop Material ( I.E. Disc / Pin / Shackle / Busbar Insulators / Al Busbar / Gi / Guy Wire / Thimbles / Earthing Rods / Cu / Al Wire / Bushrods Etc Etc ) 56 Shifting Of Allied Material For Ht / Lt Line / Substations ( I.E. Disc / Pin / Shackle / Busbar Insulators / Al Busbar / Gi / Guy Wire / Thimbles / Earthing Rods Etc ) From Unloading Site To Stacking Site And Stacking Properly 57 Shifting Of Allied Material For Ht / Lt Line / Substations / Workshop Material ( I.E. Disc / Pin / Shackle / Busbar Insulators / Al Busbar / Gi / Guy Wire / Thimbles / Earthing Rods / Al / Cu Wire / Bush Rods Etc ) For Making Space For Other Store Material 58 Unloading / Loading Of Bammboo Ladder 59 Unloading / Loading Of Single / Three Phase Meters 60 Unloading Of Pvc Cable Single Core 95 / 120 / 185Mmsq 61 Unloading Of Pvc Cable Single Core 300 / 400 / 630Mmsq 62 Loading Of Pvc Cable Single Core 95 / 120 / 185Mmsq 63 Loading Of Pvc Cable Single Core 300 / 400 / 630Mmsq 64 Unloading Of Ab / Xlpe 25 / 35 / 50 / 70 / 95Mmsq Cable For Ht / Lt Lines 65 Unloading Of Ab / Xlpe 120 / 150 / 185 / 240Mmsq Cable For Ht / Lt Lines 66 Loading Of Ab / Xlpe 25 / 35 / 50 / 70 / 95Mmsq Cable For Ht / Lt Lines 67 Loading Of Ab / Xlpe 120 / 150 / 185 / 240Mmsq Cable For Ht / Lt Lines 68 Shifting Of Ab / Xlpe25 / 35 / 50 / 70 / 95Mmsq Cable For Ht / Lt Lines From Unloading Site To Stacking Site And Stacking Properly 69 Shifting Of Ab / Xlpe120 / 150 / 185 / 240Mmsq Cable For Ht / Lt Lines From Unloading Site To Stacking Site And Stacking Properly 70 Loading Of Aluminium And Copper Wire 71 Loading Of Bush Rods And Other Allied Workshop Material 72 Unloading / Loading Of Single Phase / Three Phase Meters 73 Stacking Of Single / Three Phase Meters 74 Unloading / Loading Of Straight Jointer Kit / Heat Shrinkable Kit For Ab / Xlpe Cables Of Ht / Lt Lines 75 Unreeling Of The Acsr Dog / Rabbit, Weasel / Squirell Conductor From The Drum, Measuring , Cutting , Bundling Etc 76 Unreeling Of The Xlpe / Ab / Pvc Single Core Cables Of Sizes From The Drum, Measuring , Cutting , Bundling Etc 77 Checking / Counting / Meggering Of Line / Hardware Materials Viz Disc Insulators With Fittings, Pin Insulators With Pins Etc 78 Checking / Measuring / Weighing Of Line / Workorkkshop Material Viz Nuts And Bolts, Guy Wire, Gi Wire, Al. Strips, Dpc Cu / Al Wire, Khakhi Paper, Lethoride Paper, Fevicol Etc. 79 Unloading Of Cement Bags 80 Carrigae Of Cement Bags From Unloading Site To Stacking Site N ( Upto 50 Mtr ) 81 Stacking Of Cement Bags 82 Loading Of Cement Bags 83 Cutting Of Green Vegetable Bushes , Wild Grass, Trees In The Store To Avoid Any Mishappening Of Untoward Incidents 84 Carriage Of Green Vegetable Bushes , Wild Grass, Trees After Cutting And Dumping Away From Store 85 Straightening Of Tilted Fencing Posts In The Store Premises For Repair Of Fecning 86 Insertion Of New Fencing Posts In The Store For Repair Of Fencing 87 Dismantling Of Existing Mesh Fencing 88 Fixing Of Mesh Fencing 89 Fixiing Of Cgi Sheets 90 Dismantling Of Cgi Sheets 91 Meggering, Tightening Of Nuts And Bolts, Oil Seals, Breathers Checkings, Visual Inspections Of Transfomers 25 / 63 / 100 Kva 92 Meggering, Tightening Of Nuts And Bolts, Oil Seals, Breathers Checkings, Visual Inspections Of Transfomers 250 / 400 / 630Kva 93 Lifting Of Unserviceable Items Like, Damaged Transformers ( Outer Frame Of Dts ) , Broken Insulators Of Sorts, , Al / Cu / Scrap / Bushrods Of Sorts, Empty Barells, Broken Cgi Sheerts, Iron Scraps, Damaged Energy Meters, Ct / Pts Sets From Existing Place To Another Suitable Place And Its Stacking 94 Painting ( Red Oxide / Aluminium Paint ) Of Fabricated Material. 95 Unloading Of Old Loose Conductor And Making Bundles 96 Checking & Maggering Of 11Kv La Set Hg Set Go Set Ct / Pt Unit

Key Value

Document Fees
INR 500 /-
EMD
INR 30000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: Fixing of Rate Contract for handling of various material in Divisional stores at Miran Sahib of Electric Division-II JPDCL Gandhi Nagar Jammu.
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Unloading of PCC Poles 11 Mtr Long item1 1 No
2 2 Unloading of PCC Poles 9 Mtr Long item2 1 No
3 3 Unloading of PCC Poles 8 Mtr Long item3 1 No
4 4 Unloading of ST Poles 13 Mtr Long item4 1 No
5 5 Unloading of ST Poles 11Mtr Long item5 1 No
6 6 Unloading of ST Poles 9 Mtr Long item6 1 No
7 7 Unloading of ST Poles 8 Mtr Long item7 1 No
8 8 Loading of PCC Poles 11 Mtr Long item8 1 No
9 9 Loading of PCC Poles 9 Mtr Long item9 1 No
10 10 Loading of PCC Poles 8 Mtr Long item10 1 No
11 11 Loading of ST Poles 13 Mtr Long item11 1 No
12 12 Loading of ST Poles 11Mtr Long item12 1 No
13 13 Loading of ST Poles 9 Mtr Long item13 1 No
14 14 Loading of ST Poles 8 Mtr Long item14 1 No
15 15 Dragging of PCC/ST Poles at an average distance upto 50 Mtr for stacking to accesible place for loading/Unoading Purpose and its stacking item15 1 No
16 16 Unloading of /New ACSR Conductor item16 1 Kg
17 17 Loading of Old/New ACSR Conductor item17 1 Kg
18 18 Shifting of Old/New ACSR Conductor from unloading site to stacking site at an average distance upto 50 Mtr and its stacking item18 1 Kg
19 19 Shifting of Old/New ACSR Conductor to other place for making space for other store material at an average distance upto 50 Mtr and its stacking item19 1 Kg
20 20 Unloading of 25 KVA Transformer(New/Write BackTransformer) item20 1 No
21 21 Unloading of 63 KVA Transformer(New/Write BackTransformer) item21 1 No
22 22 Unloading of 100 KVA Transformer(New/Write BackTransformer) item22 1 No
23 23 Unloading of 250 KVA Transformer(New/Write BackTransformer) item23 1 No
24 24 Unloading of 400 KVA Transformer(New/Write BackTransformer) item24 1 No
25 25 Unloading of 630 KVA Transformer(New/Write BackTransformer) item25 1 No
26 26 Loading of 25 KVA Transformer item26 1 No
27 27 Loading of 63 KVA Transformer item27 1 No
28 28 Loading of 100 KVA Transformer item28 1 No
29 29 Loading of 250 KVA Transformer item29 1 No
30 30 Loading of 400 KVA Transformer item30 1 No
31 31 Loading of 630 KVA Transformer item31 1 No
32 32 Dragging of existing /New /Damaged 25 KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly item32 1 No
33 33 Dragging of existing /New 63 KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly item33 1 No
34 34 Dragging of existing /New /Damaged 100 KVA Tranformer at an average distance upto 50 Mtrfrom unloading site to stacking site and its stacking properly item34 1 No
35 35 Dragging of existing /New /Damaged 250 KVA Tranformer at an average distance upto 50 Mtrfrom unloading site to stacking site and its stacking properly item35 1 No
36 36 Dragging of existing /New/Damaged 400KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly item36 1 No
37 37 Dragging of existing /New/Damaged 630KVA Tranformer at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly item37 1 No
38 38 Dragging of existing /New /Damaged 25 KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking item38 1 No
39 39 Dragging of existing /New 63 KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking item39 1 No
40 40 Dragging of existing /New /Damaged 100 KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking item40 1 No
41 41 Dragging of existing /New /Damaged 250 KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking item41 1 No
42 42 Dragging of existing /New/Damaged 400KVA Tranformer at an average distance upto 50 Mtrfor making space for other store material and its stacking item42 1 No
43 43 Dragging of existing /New/Damaged 630KVA Tranformer at an average distance upto 50 Mtr for making space for other store material and its stacking item43 1 No
44 44 Unloading of Channel/Angle/Flat Iron item44 1 Kg
45 45 Loading of Channel/Angle/Flat Iron item45 1 Kg
46 46 Shifting of Channel/Angle/Flat Iron at an average distance upto 50 Mtr from unloading site to stacking site and its stacking properly item46 1 Kg
47 47 Shifting of Channel/Angle/Flat Iron at an average distance upto 50 Mtr for making space for other store material and its stacking item47 1 Kg
48 48 Unloading of Link/Knife/HG/DO/LA Set item48 1 set
49 49 Loading of Link/Knife/HG/DO/LA/GO Set item49 1 set
50 50 Unloading of CT/PT Unit item50 1 No
51 51 Loading of CT/PT Unit item51 1 No
52 52 Unloading of DPC CU/AL Wire item52 1 kg
53 53 Unloading of Bush Rods and other allied workshop material item53 1 kg
54 54 Unloading of allied material for HT/LT Line/Substations(i.e. Disc/Pin/Shackle/Busbar Insulators/Al Busbar/GI/Guy wire/Thimbles/earthing rods etc) item54 1 kg
55 55 Loading of allied material for HT/LT Line/Substations/workshop material(i.e. Disc/Pin/Shackle/Busbar Insulators/Al Busbar/GI/Guy wire/Thimbles/earthing rods/Cu/Al Wire /Bushrods etc etc) item55 1 kg
56 56 Shifting of allied material for HT/LT Line/Substations(i.e. Disc/Pin/Shackle/Busbar Insulators/Al Busbar/GI/Guy wire/Thimbles/earthing rods etc)from unloading site to stacking site and stacking properly item56 1 kg
57 57 Shifting of allied material for HT/LT Line/Substations/workshop material(i.e. Disc/Pin/Shackle/Busbar Insulators/Al Busbar/GI/Guy wire/Thimbles/earthing rods/Al/Cu wire/bush rods etc) for making space for other store material item57 1 kg
58 58 Unloading/Loading of Bammboo Ladder item58 1 No
59 59 Unloading/Loading of Single/Three Phase Meters item59 1 No
60 60 Unloading of PVC Cable single core 95/120/185mmsq item60 1 Mtr
61 61 Unloading of PVC Cable single core 300/400/630mmsq item61 1 Mtr
62 62 Loading of PVC Cable single core 95/120/185mmsq item62 1 Mtr
63 63 Loading of PVC Cable single core 300/400/630mmsq item63 1 Mtr
64 64 Unloading of AB/XLPE 25/35/50/70/95mmsq Cable for HT/LT Lines item64 1 Mtr
65 65 Unloading of AB/XLPE 120/150/185/240mmsq Cable for HT/LT Lines item65 1 Mtr
66 66 Loading of AB/XLPE 25/35/50/70/95mmsq Cable for HT/LT Lines item66 1 Mtr
67 67 Loading of AB/XLPE 120/150/185/240mmsq Cable for HT/LT Lines item67 1 Mtr
68 68 Shifting of AB/XLPE25/35/50/70/95mmsq Cable for HT/LT Lines from unloading site to stacking site and stacking properly item68 1 Mtr
69 69 Shifting of AB/XLPE120/150/185/240mmsq Cable for HT/LT Lines from unloading site to stacking site and stacking properly item69 1 Mtr
70 70 Loading of Aluminium and Copper wire item71 1 kg
71 71 loading of Bush Rods and other allied Workshop material item72 1 kg
72 72 Unloading/Loading of Single phase/three phase meters item73 1 No
73 73 Stacking of Single/Three phase meters item74 1 Nos
74 74 Unloading/Loading of Straight jointer kit/Heat shrinkable Kit for AB/XLPE cables of HT/LT Lines item83 1 No
75 75 Unreeling of the ACSR Dog/Rabbit, Weasel/Squirell Conductor from the drum, measuring ,cutting ,bundling etc item84 1 Mtr
76 76 Unreeling of the XLPE/AB/PVC Single core cables of sizes from the drum, measuring , cutting ,bundling etc item85 1 Mtr
77 77 Checking/Counting/Meggering of Line/Hardware Materials viz Disc insulators with fittings, Pin insulators with pins etc item86 1 kg
78 78 Checking/Measuring/ Weighing of Line/Workorkkshop Material viz Nuts and bolts, Guy wire, GI Wire, Al. Strips, DPC Cu/Al Wire, Khakhi Paper, Lethoride Paper, Fevicol etc. item87 1 Kg
79 79 Unloading of Cement Bags item88 1 bag
80 80 Carrigae of Cement Bags from unloading site to stacking site\n(Upto 50 Mtr) item89 1 bag
81 81 Stacking of Cement bags item90 1 bag
82 82 Loading of Cement Bags item91 1 bag
83 83 Cutting of Green Vegetable Bushes , Wild Grass, trees in the store to avoid any mishappening of untoward incidents item92 1 Sqft
84 84 Carriage of Green Vegetable Bushes , Wild Grass, trees after cutting and dumping away from store item93 1 LS
85 85 Straightening of tilted fencing posts in the store premises for repair of fecning item94 1 No
86 86 Insertion of new fencing Posts in the store for repair of fencing item95 1 No
87 87 Dismantling of existing mesh fencing item96 1 Sqft
88 88 Fixing of mesh Fencing item97 1 Sqft
89 89 Fixiing of CGI Sheets item98 1 Sqft
90 90 Dismantling of CGI sheets item99 1 Sqft
91 91 Meggering, tightening of nuts and bolts, oil seals, breathers checkings, visual inspections of Transfomers 25/63/100 KVA item100 1 No
92 92 Meggering, tightening of nuts and bolts, oil seals, breathers checkings, visual inspections of Transfomers 250/400/630KVA item101 1 No
93 93 Lifting of Unserviceable items like, Damaged Transformers(Outer frame of DTs), Broken Insulators of sorts, ,Al/ Cu/ Scrap/ Bushrods of sorts, Empty barells, Broken CGI Sheerts, Iron scraps, damaged energy meters, CT/PTs sets from existing place to another suitable place and its stacking item102 1 Kg
94 94 Painting(Red oxide/Aluminium Paint) of Fabricated Material. item103 1 Kg
95 95 Unloading of old loose conductor and making bundles item104 1 Kg
96 96 Checking & maggering of 11Kv LA set HG set GO set CT/PT unit item105 1 set
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail