| 1 | 1 | Cartage of following material from store center Meerut to JE Store including loading & unloading at both ends maximum distance up to 30 Km. :– | BI01010001010000000000000515BI0100001112 | | |
|---|
| 2 | 1.1 | A) PCC Poles 8.5 meter long. | | 25 | Nos |
|---|
| 3 | 1.2 | Cartage of line material including ACSR Weasel /AB Conductor from store centre to dump site & then dump site to site of work on day to day basis, including loading & unloading at both ends maximum distance up to 30 Km. | | 2 | Job |
|---|
| 4 | 1.3 | Cartage of following from dump site to site of work on day to day basis including loading & unloading at both ends maximum distance up to 30 Km :– \nA) STP Pole 11 mtr. long. | | 25 | Nos |
|---|
| 5 | 1.4 | Cartage of 63 KVA T/f. (03 No.) & 100 KVA T/f. (03 No.) from store center Meerut to dump site including loading & unloading at both ends maximum distance up to 30 Km. | | 6 | Nos |
|---|
| 6 | 1.5 | Erection of PCC pole (8.5 mtr. long) after digging a pits of required size with fixing line accessories complete.. | | 21 | Nos |
|---|
| 7 | 1.6 | Erection of Double Pole after digging a pits of required size with fixing line accessories complete. | | 2 | Nos |
|---|
| 8 | 1.7 | Laying, lifting, sagging & binding of ACSR weasel conductor | | 1885 | Mtr. |
|---|
| 9 | 1.8 | Laying, lifting, sagging & binding of AB conductor alongwith fixing of deadend clamp, pearcing clamp, suspension with hook of AB conductor of different size & different places | | 607 | Mtr. |
|---|
| 10 | 1.9 | Making of T off channel. | | 1 | Nos |
|---|
| 11 | 2 | Fixing of Fuse Set | | 1 | Nos |
|---|
| 12 | 2.1 | Fabrication & fixing of 11 KV X Arm after removal of old and broken X Arm. | | 2 | Nos |
|---|
| 13 | 2.2 | Earthing with MS Earth Rod | | 2 | Nos |
|---|
| 14 | 2.3 | Grouting and Fixing of Stay Set Complete work in all respect. | | 4 | Nos |
|---|
| 15 | 2.4 | Removal of 25 KVA T/f from double pole after opening the binding and jumpers properly | | 3 | Nos |
|---|
| 16 | 2.5 | Mounting of 63 KVA T/f on double pole & making connection properly | | 3 | Nos |
|---|
| 17 | 2.6 | Removal of 63 KVA T/f from double pole after opening the binding and jumpers properly | | 2 | Nos |
|---|
| 18 | 2.7 | Mounting of 100 KVA T/f on double pole & making connection properly | | 3 | Nos |
|---|
| 19 | 2.8 | Providing & Fixing of LT Shackle insulator. | | 12 | Nos |
|---|
| 20 | 2.9 | Providing & Fixing of PCC Pole Clamps. | | 29 | Nos |
|---|
| 21 | 3 | Providing & Fixing of Nut & Bolt. | | 123 | Kg. |
|---|
| 22 | 3.1 | Providing & Fixing of LT pin Clamp. | | 13 | Nos |
|---|
| 23 | 3.2 | Providing & Fixing of F Clamps. | | 12 | Nos |
|---|
| 24 | 3.3 | Back cartage of old & used material from site of work to JE store and then store centre meerut distance upto 30 km. as follow:-\nA) 25 KVA T/f | | 3 | Nos |
|---|
| 25 | 3.4 | B) 63 KVA T/f | | 2 | Nos |
|---|
| 26 | 3.5 | C) Rusted ACSR weasel conductor | | 650 | Mtr. |
|---|
| 27 | 3.6 | D) G.I. Wire | | 211 | Kg. |
|---|