Uttarakhand Power Corporation Limited-UPCL has published Various Works Replacement Of Damaged Poles Re Straightening Of Tilted And Inserting Poles Between Long Spans Conversion Of Single Phase Line To Three Phase Etc At Various Sites Under Edd Mohanpur. Submission Date for this Tender is 24-05-2021. Transformer Supply Tenders in EDD Mohanpur Uttarakhand. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 26-Apr-2021 | Date Extension | Date | 12-05-2021 |
2 | 12-May-2021 | Date Extension2 | Date | 24-05-2021 |
Name of Work:Various O&M Works viz. replacement of damaged poles, restraightening of tilted & inserting poles between long spans, conversion of single phase line to three phase etc. at various sites under EDD Mohanpur | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Cartage of Steel Tubular, PCC Poles and Transformer from store centre to nearest road site with loading, unloading at both points. (Loading, unloading plus carriage per pole and transformer.) Distance approx 21 to 50 km. | BI01010001010000000000000515BI0100001112 | ||
2 | 2 | ST Pole SP-33 | BI01010001010000000000000515BI0100001113 | 8 | Nos |
3 | 3 | ST Pole SP-21/23 | BI01010001010000000000000515BI0100001114 | 24 | Nos |
4 | 4 | ST Pole SP-55 | BI01010001010000000000000515BI0100001115 | 6 | Nos |
5 | 5 | PCC Pole | BI01010001010000000000000515BI0100001116 | 76 | Nos |
6 | 6 | Cartage of small material by vehicle from store centre to nearest road site including loading and unloading at both ends.Distance approx 21 to 50 km. | BI01010001010000000000000515BI0100001117 | 49.72 | Qtl |
7 | 7 | Head load Cartage of the following poles from road side to construction site (rates are per/ Km. including loading/unloading at both points).Distance up to 0 to 1 km | BI01010001010000000000000515BI0100001118 | ||
8 | 8 | ST Pole SP-33 | BI01010001010000000000000515BI0100001119 | 8 | Nos |
9 | 9 | ST Pole SP-21/23 | BI01010001010000000000000515BI0100001120 | 24 | Nos |
10 | 10 | ST Pole SP-55 | BI01010001010000000000000515BI0100001121 | 6 | Nos |
11 | 11 | PCC Pole | BI01010001010000000000000515BI0100001122 | 76 | Nos |
12 | 12 | Head load cartage of small material. Rates are per Km/Quintal including loading and unloading.Distance up to 0 to 1 km | BI01010001010000000000000515BI0100001123 | 49.72 | Qtl |
13 | 13 | Excavation of Pole pit of Size .9x.6x1/6 of full length of pole for errection of pole in all type of soil including proper dressing of sides and ramming of bottom including gettiong out of the excavated soil and disposal of surplus excavated soil as directed complete | BI01010001010000000000000515BI0100001124 | 76.785 | Cum |
14 | 14 | Errection of following single support pole in proper level and alignment along with fixing of all accessories, like top chanel & Clamps as per RESSPO Const Mannaual | BI01010001010000000000000515BI0100001125 | ||
15 | 15 | SP-55 | BI01010001010000000000000515BI0100001126 | 6 | Nos |
16 | 16 | SP-33 | BI01010001010000000000000515BI0100001127 | 8 | Nos |
17 | 17 | Sp-21/23 | BI01010001010000000000000515BI0100001128 | 24 | Nos |
18 | 18 | PCC Pole | BI01010001010000000000000515BI0100001129 | 76 | Nos |
19 | 19 | Grouting of Pole in size .45x.45x1/9 of the support in CC ratio 1:4:8 including cost of sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment leveling as per RESSPO Construction mannual | BI01010001010000000000000515BI0100001130 | 9.328 | Cum |
20 | 20 | Muffing of Pole with CC 1:3:6 block and 45 cm height from ground level including cost of cement, stone and sand etc. | BI01010001010000000000000515BI0100001131 | 6.134 | Nos |
21 | 21 | Fabrication of M.S. Channel Angle iron after cutting in required sizes with drilling of holes upto good finish for top channel, bracking and special type bracket etc. as per RESPO schedule and local approved drawing. | BI01010001010000000000000515BI0100001132 | 850 | Kg |
22 | 22 | Excavation of earth for stay pit size .6x.6x1.2 mr in all type of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work | BI01010001010000000000000515BI0100001133 | 18.788 | Cum |
23 | 23 | Fixing tigtening and nozzling of stay with pole and stay rod on required tension as per dreawing RESSPO Mannual | BI01010001010000000000000515BI0100001134 | ||
24 | 24 | 11 KV line | BI01010001010000000000000515BI0100001135 | 9 | Nos |
25 | 25 | LT Stay | BI01010001010000000000000515BI0100001136 | 44 | Nos |
26 | 26 | Guarding of line over (Telephone/Road/LT line crossing as per drawing with 6/8 swg G.I wire including fixing of guarding channel/angle as per RESSPO Mannual, LT/11KV/33KV | BI01010001010000000000000515BI0100001137 | 3 | Per Span |
27 | 27 | Grouting of stay size .6x.6x.3 in CC ratio 1:4:8 block including cost of cement, sand and stone blasst back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESSPO Construction mannual | BI01010001010000000000000515BI0100001138 | 3.672 | Cum |
28 | 28 | Errection of earthing of support MS Earth Rod of 2.5 meter long by hammering of M.S rod to proper depth and Connecting theearth elecrode with the help of G.I wire as per Construction mannual | BI01010001010000000000000515BI0100001139 | 61 | Nos |
29 | 29 | Laying, Sperading Sagging of 11KV/33KV line in 3P 4W of the following wire as phase wire with GI Earth wire complete including fixing of 11KV accessories I 3Nos Condutcor in Parallel with binding and jumpering as per profile and sagging chart | BI01010001010000000000000515BI0100001140 | ||
30 | 30 | ACSR Weasel | BI01010001010000000000000515BI0100001141 | 1.742 | Cktkm |
31 | 31 | ACSR Dog | BI01010001010000000000000515BI0100001142 | 0.68 | Cktkm |
32 | 32 | Laying Spreading Sagging of LT lines of the following wire as phase wire with GI wire complete with binding and jumpering as per RESSPO Spech | BI01010001010000000000000515BI0100001143 | ||
33 | 33 | ACSR Weasel | BI01010001010000000000000515BI0100001144 | ||
34 | 34 | 3 Phasee 4 wire Length | BI01010001010000000000000515BI0100001145 | 2.12 | Cktkm |
35 | 35 | 3 Phasee 5 wire Length | BI01010001010000000000000515BI0100001146 | 0.99 | Cktkm |
36 | 36 | 1 Phasee 2 wire Length | BI01010001010000000000000515BI0100001147 | 0.2 | Cktkm |
37 | 37 | 1 Phasee 3 wire Length | BI01010001010000000000000515BI0100001148 | 0.97 | Cktkm |
38 | 38 | Laying, Sperading Sagging binding of AB Cable of size 120sqmm these rates ae only for cable additional provisions o be made for matching accessories insatallation, case o any network modificatio ie additional pole etc and for actual connection disconnction as per site condition. | BI01010001010000000000000515BI0100001149 | 200 | R mtr |
39 | 39 | Laying, Sperading Sagging binding of AB Cable of size 3x95sqmm these rates ae only for cable additional provisions o be made for matching accessories insatallation, case o any network modificatio ie additional pole etc and for actual connection disconnction as per site condition. | BI01010001010000000000000515BI0100001150 | 1340 | RMT |
40 | 40 | Dismentaling of existing LT/HT line, including disc fitting insulator, clamps, Nut & bolts and consumer connections and street light connection etc, including rolling of conductor and cartage back from site to JE store. | BI01010001010000000000000515BI0100001151 | ||
41 | 41 | LT line - ACSR Weasel | BI01010001010000000000000515BI0100001152 | ||
42 | 42 | 1 Phase 2 Wire Length | BI01010001010000000000000515BI0100001153 | 1.64 | Cktkm |
43 | 43 | 3 Phase 4 Wire Conductor | BI01010001010000000000000515BI0100001154 | 1.94 | Cktkm |
44 | 44 | Single Pole | BI01010001010000000000000515BI0100001155 | ||
45 | 45 | SP-55 | BI01010001010000000000000515BI0100001156 | 4 | Nos |
46 | 46 | PCC Pole | BI01010001010000000000000515BI0100001157 | 7 | Nos |
47 | 47 | SP-21/23 | BI01010001010000000000000515BI0100001158 | 5 | Nos |
48 | 48 | 11KV line with earth wire | BI01010001010000000000000515BI0100001159 | ||
49 | 49 | ACSR Dog Conductor | BI01010001010000000000000515BI0100001160 | 0.68 | Cktkm |
50 | 50 | ACSR Weasel | BI01010001010000000000000515BI0100001161 | 0.3 | Cktkm |
51 | 51 | Dismentaling of LT AB Cable of size 3x120sqmm | BI01010001010000000000000515BI0100001162 | 200 | RMT |
52 | 52 | Dismentaling of LT AB Cable | BI01010001010000000000000515BI0100001163 | 0.346 | Cktkm |
53 | 53 | Re-laying of above dismentled LT AB Cable | BI01010001010000000000000515BI0100001164 | 0.25 | Cktkm |
54 | 54 | Making of section pole for existing LT/HT/33KV line complete in all respect | BI01010001010000000000000515BI0100001165 | 14 | Job |
55 | 55 | Route Clearence by cutting of tree branches/porning looping chopping of trees FC LT/11 & 33KV Line | BI01010001010000000000000515BI0100001166 | 5 | Perkm |
56 | 56 | T-off connection Complete11/33KV line | BI01010001010000000000000515BI0100001167 | 6 | Nos |
57 | 57 | Fixing of X-Arm | BI01010001010000000000000515BI0100001168 | 1 | Job |
58 | 58 | Dismentaling & laying of LT Service Cable from pole to consumer end meter along with supporting GI wire | BI01010001010000000000000515BI0100001169 | 369 | Job |
59 | 59 | RE-Errection of Tilted Pole | BI01010001010000000000000515BI0100001170 | 32 | Kg |
60 | 60 | Fixing of D- type Bracket in LT line | BI01010001010000000000000515BI0100001171 | 18 | Nos |
61 | 61 | Fixing of triangular type bracket in 11KV line | BI01010001010000000000000515BI0100001172 | 3 | Nos |
62 | 62 | Back carriage of Scrap Conductor site to store | BI01010001010000000000000515BI0100001173 | 200 | Kg |
63 | 63 | PART - II SUPPLY | BI01010001010000000000000515BI0100001174 | ||
64 | 64 | Stay Clamp for SP-55 Pole with N&B | BI01010001010000000000000515BI0100001175 | 6 | No |
65 | 65 | Stay Clamp for SP-33 Pole with N&B | BI01010001010000000000000515BI0100001176 | 8 | No |
66 | 66 | Stay Clamp For PCC Pole | BI01010001010000000000000515BI0100001177 | 46 | No |
67 | 67 | Stay Insulator | BI01010001010000000000000515BI0100001178 | 28 | No |
68 | 68 | PP Clamp for SP-55 with N&B | BI01010001010000000000000515BI0100001179 | 27 | No |
69 | 69 | PP Clamp for SP-21 with N&B | BI01010001010000000000000515BI0100001180 | 3 | No |
70 | 70 | PP Clamp for SP-33 with N&B (65x6) | BI01010001010000000000000515BI0100001181 | 20 | No |
71 | 71 | PP Clamp For PC Pole | BI01010001010000000000000515BI0100001182 | 1 | No |
72 | 72 | LT Clamp For PCC Pole | BI01010001010000000000000515BI0100001183 | 320 | No |
73 | 73 | LT Clamp For ST Pole Sp-55 Pole | BI01010001010000000000000515BI0100001184 | 10 | No |
74 | 74 | LT Clamp For ST Pole Sp-21 Pole | BI01010001010000000000000515BI0100001185 | 42 | No |
75 | 75 | LT Shackle insulator | BI01010001010000000000000515BI0100001186 | 392 | No |
76 | 76 | Earth Clamp for St Pole SP-55 | BI01010001010000000000000515BI0100001187 | 2 | No |
77 | 77 | Earth Clamp for St Pole SP-21 | BI01010001010000000000000515BI0100001188 | 6 | No |
78 | 78 | Earth Clamp for St Pole SP-33 | BI01010001010000000000000515BI0100001189 | 15 | No |
79 | 79 | Earth Clamp for PCC Pole | BI01010001010000000000000515BI0100001190 | 107 | No |
80 | 80 | Holding clamp for PCC Pole | BI01010001010000000000000515BI0100001191 | 32 | No |
81 | 81 | Holding clamp for ST Pole SP-21 | BI01010001010000000000000515BI0100001192 | 10 | No |
82 | 82 | Suspension clamp with eye hook for LT ABC Cable | BI01010001010000000000000515BI0100001193 | 70 | No |
83 | 83 | Dead end clamp with I hook and Nut & bolt insulated | BI01010001010000000000000515BI0100001194 | 24 | No |
84 | 84 | Connector PRC | BI01010001010000000000000515BI0100001195 | 24 | No |
85 | 85 | Piercing connector 95mm to 120mm | BI01010001010000000000000515BI0100001196 | 102 | No |
86 | 86 | Piercing Connector suitable for energizing distrubution boxes 95mm to 120mm | BI01010001010000000000000515BI0100001197 | 25 | No |
87 | 87 | Bare netural connector PG Clamp 95sqmm 120sqmm | BI01010001010000000000000515BI0100001198 | 29 | Mtr |
88 | 88 | LT Distrubution box three phase including all clamps with Nut & Bolt | BI01010001010000000000000515BI0100001199 | 15 | No |
89 | 89 | LT Single Lead PVC Cable 1x50sqmm | BI01010001010000000000000515BI0100001200 | 130 | Mtr |
90 | 90 | Universal I Hook | BI01010001010000000000000515BI0100001201 | 30 | No |
91 | 91 | AL lug of size 50sqm | BI01010001010000000000000515BI0100001202 | 60 | No |
92 | 92 | Insulated Jointing Sleeves for LT ABC | BI01010001010000000000000515BI0100001203 | 15 | No |
93 | 93 | MS Nut & Bolt Off Size | BI01010001010000000000000515BI0100001204 | 17 | Kg |