}

Planning , Design , Engineering , Construction , Fabrication , Erection , Supply , Installation , Testing , Trial Run And Commissioning Of Coal Handling Plant For Nigahi On Turnkey Basis As Per Nit As Per Nit / Tender Document, NIGAHI OCP-Madhya Pradesh

Northern Coalfields Limited-NCL has published Planning , Design , Engineering , Construction , Fabrication , Erection , Supply , Installation , Testing , Trial Run And Commissioning Of Coal Handling Plant For Nigahi On Turnkey Basis As Per Nit As Per Nit / Tender Document. Submission Date for this Tender is 04-06-2021. Miscellaneous Fasteners Tenders in NIGAHI OCP Madhya Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

27657634
Corrigendum : Planning , Design , Engineering , Construction , Fabrication , Erection , Supply , Installation , Testing , Trial Run And Commissioning Of Coal Handling Plant For Nigahi On Turnkey Basis As Per Nit As Per Nit / Tender Document
Open Tender
Indian
Madhya Pradesh
NIGAHI OCP
04-06-2021

Tender Details

Planning , Design , Engineering , Construction , Fabrication , Erection , Supply , Installation , Testing , Trial Run And Commissioning Of Coal Handling Plant For Nigahi On Turnkey Basis As Per Nit As Per Nit / Tender Document

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 16-Apr-2021 PRE BID MEETING Technical Bid 05-05-2021
2 04-May-2021 CORRIGENDUM dt 04052021 Technical Bid 19-05-2021
3 18-May-2021 DATE CORRIGENDUM Date 04-06-2021

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
INR 689.77 Crore /-

BOQ Items

Name of the Work / Contract No:
Sl. No. Item Description Item Code / Make Quantity Units
1 1 A. WORK & SERVICES
2 2 1. Detailed survey of the area, within the battery limits & submission of reports complete work as per tender document 1 LS
3 3 2. Sub soil exploration, field and laboratory testing of samples & submission of reports complete work as per tender document. 1 LS
4 4 3. Design Engineering Cost
5 5 a. Preparation and submission of system engineering drawings as per system requirements 1 LS
6 6 b. GA & detail engineering designs and drawings of all civil and structurals included in the system and scope of works complete details of the system 1 LS
7 7 c. G.A. & detailed engineering designs and drawings including working and maintenance manuals for complete scope of work of : \ni) All individual equipment ( Mechanical & Electricals) ii) Dust Control & Pressurisation system. iii) Fire-fighting and plant cleaning system. iv) Chutes & Liners \nv) Communication system vi) Power Supply System vii)Illumination system. ix) Plant control system x) OHE System\nx) Any other system/unit to match the scope of work & requirement\n 1 LS
8 8 4. Documentation as per tender specification 1 LS
9 9 B. CIVIL & STRUCTURAL WORKS
10 10 I Civil and structural work
11 11 1. Truck Receiving Steel Hopper ( 4x120Te 2sets) 1 LS
12 12 2. Truck Receiving Platform with Ramp/Approach Road and Retaining wall 1 LS
13 13 3. Conveyor galleries 1 LS
14 14 4. Transfer House, Drive House, Sampler House 1 LS
15 15 5. 15000 Te Over Ground Bunker With maintenance bay 1 LS
16 16 6. 4000 Te Silo with Lift Well 1 LS
17 17 II Developmental work and infra-structure
18 18 1. Site Development 1 LS
19 19 2. CHP Office 1 LS
20 20 3. Service buildings such as a)Rest shelter, Canteen (for 25 seater) and First aid center. 1 LS
21 21 4. Security post/ time office. 1 LS
22 22 5. LMV/car parking shed 1 LS
23 23 6. Scooter/motor cycle shed 1 LS
24 24 7.Electrical maintenance cum testing room 1 LS
25 25 8. Store Shed. 1 LS
26 26 9. Store room. 1 LS
27 27 10. Pump house. 1 LS
28 28 11. 2 Nos. of Tubewell 1 LS
29 29 12. 9 Nos. of Electrical sub-stations 1 LS
30 30 13. 8 nos. of Lighting Mast 1 LS
31 31 14. Barbed wire fencing for Switch yard 1 LS
32 32 15. Internal Approach Road 3.75m wide 1 LS
33 33 16. Drains 1 LS
34 34 17. Culverts 1 LS
35 35 18. Boundary wall with gate 1 LS
36 36 19. Ground Water Reservoir 1 LS
37 37 20. Individual OH Tank 1 LS
38 38 21. Water Supply distribution 1 LS
39 39 22. ETP 1 LS
40 40 23. Sewerage 1 LS
41 41 24. Landscaping and arboriculture 1 LS
42 42 25. Miscellaneous 1 LS
43 43 C. PLANT & MACHINERY (SUPPLY)
44 44 C.(a) SUPPLY : MECHANICAL
45 45 A. CONVEYORS 1 LS
46 46 B. BELTING 1 LS
47 47 C. EQUIPMEMT
48 48 1. Receiving Section Mechanical Equipment 1 LS
49 49 2. Mechanical equipment in secondary sizer section 1 LS
50 50 3. Mechanical Equipment in Storage Section 1 LS
51 51 4. Mechanical Equipment at Transfer house 1 LS
52 52 5. Mechanical equipment at Loading Complex 1 LS
53 53 6. Mechanical Equipment required for dovetailing in existing system with due modification. 1 LS
54 54 7. OHE Equipment including mechanical, electrical and civil requirement 1 LS
55 55 8. Other mechanical equipment 1 LS
56 56 9. Dust suppression system with piping & other accessories. Condition monitoring system, Safety & firefighting system , and other misc. equipment/utility for any more item required to complete the project 1 LS
57 57 C.(b) SUPPLY : ELECTRICAL
58 58 ELECTRICAL
59 59 A Substation-A(SS-1)\nPower receiving arrangment from substation A(SS-1) with Lightning Arrester and Isolator with earth switch as required.\n6.6/0.433 kV, 250KVA Distribution transformer-2nos.\n6.6/0.230 V (L-L), 100 kVALighting Transformer-2nos.\n220V Lead Acid Battery complete with Battery Charging unit.-1 no.\n6.6 kV 3 Phase, 3 Wire Switchboard 1A & 1B (Indoor ) Comprising of Incomer VCB, Buscoupler VCB and Outgoing VCBs/VCPs complete with metering and protection as required \n415V,Aluminium Bus-duct as required.\nMCC at Substation-E2 Comprising of Incomer ACB, Buscoupler ACBs and Outgoing ACBs/MCCB/SFU/ Contactor as required.\n6.6 kV and 415 V Capacitor with Automatic power factor correction of required capacity Banks for power factor improvement as required.\nTwo number of single circuit of 6.6 kV Overhead line comprising of AAAC ’Wolf’ equivalent Conductor for power supply as required.\nFire detection, Alarm and Protection system. 1 Lot
60 60 B Substation-B(SS-2)\nPower receiving arrangment from substation A(SS-1) with Lightning Arrester and Isolator with earth switch as required.\n6.6/0.433 kV, 1000KVA Distribution transformer-2nos.\n6.6/0.230 V (L-L), 100 kVALighting Transformer-2nos.\n220V Lead Acid Battery complete with Battery Charging unit.-1 no.\n6.6 kV 3 Phase, 3 Wire Switchboard 2A & 2B (Indoor ) Comprising of Incomer VCB, Buscoupler VCB and Outgoing VCBs/VCPs complete with metering and protection as required \n415V,Aluminium Bus-duct as required.\nMCC at Substation-E2 Comprising of Incomer ACB, Buscoupler ACBs and Outgoing ACBs/MCCB/SFU/ Contactor as required.\n6.6 kV and 415 V Capacitor with Automatic power factor correction of required capacity Banks for power factor improvement as required.\nTwo number of single circuit of 6.6 kV Overhead line comprising of AAAC ’Wolf’ equivalent Conductor for power supply as required.\nFire detection, Alarm and Protection system. 1 Lot
61 61 C Substation-C(SS-3)\nPower receiving arrangment from substation A(SS-1) with Lightning Arrester and Isolator with earth switch as required.\n6.6/0.433 kV,250KVA Distribution transformer-2 nos.\n6.6/0.230 V (L-L), 100 KVA Lighting Transformer-2 nos.\n220V Lead Acid Battery complete with Battery Charging unit.-1 no.\n6.6 kV 3 Phase, 3 Wire Switchboard 3A & 3B (Indoor ) Comprising of Incomer VCB, Buscoupler VCB and Outgoing VCBs/VCPs complete with metering and protection as required \n415V,Aluminium Bus-duct as required.\nMCC at Substation-C Comprising of Incomer ACB, Buscoupler ACBs and Outgoing ACBs/MCCB/SFU/ Contactor as required.\n6.6 kV and 415 V Capacitor with Automatic power factor correction of required capacity Banks for power factor improvement as required.\nTwo number of single circuit of 6.6 kV Overhead line comprising of AAAC ’Wolf’ equivalent Conductor for power supply as required.\nFire detection, Alarm and Protection system. 1 Lot
62 62 D Substation-D(SS-4)\nPower receiving arrangment from substation C(SS-3) with Lightning Arrester and Isolator with earth switch as required.\n6.6/0.433 kV, 400KVA Distribution transformer-2 nos.\n6.6/0.230 V (L-L), 100 KVA Lighting Transformer-2 nos.\n220V Lead Acid Battery complete with Battery Charging unit.-1 no.\n6.6 kV 3 Phase, 3 Wire Switchboard 4A (Indoor ) Comprising of Incomer VCB, Buscoupler VCB and Outgoing VCBs/VCPs, Metering and protection as required \n415V,Aluminium Bus-duct as required.\nMCC at Substation-D Comprising of Incomer ACB, Buscoupler ACBs and Outgoing ACBs/MCCB/SFU/ Contactor as required.\n6.6 kV and 415 V Capacitor with Automatic power factor correction of required capacity Banks for power factor improvement as required.\nTwo number of single circuit of 6.6 kV Overhead line comprising of AAAC ’Wolf’ equivalent Conductor for power supply as required.\nFire detection, Alarm and Protection system. 1 Lot
63 63 E Substation-E(SS-5)\n6.6/0.433 kV, 315KVA Distribution transformer-2 nos.\n6.6/0.230 V (L-L), 100 KVA Lighting Transformer-2 nos.\n220V Lead Acid Battery complete with Battery Charging unit.-1 no.\n6.6 kV 3 Phase, 3 Wire Switchboard 5A&5B (Indoor ) Comprising of Incomer VCB, Buscoupler VCB and Outgoing VCBs/VCPs, Metering and protection as required \n415V,Aluminium Bus-duct as required.\nMCC at Substation-E Comprising of Incomer ACB, Buscoupler ACBs and Outgoing ACBs/MCCB/SFU/ Contactor as required.\n6.6 kV and 415 V Capacitor with Automatic power factor correction of required capacity Banks for power factor improvement as required.\nTwo number of single circuit of 6.6 kV Overhead line comprising of AAAC ’Wolf’ equivalent Conductor for power supply as required.\nFire detection, Alarm and Protection system. 1 Lot
64 64 F Substation-F(SS-6)\nPower receiving arrangment from substation E(SS-5) with Lightning Arrester and Isolator with earth switch as required.\n6.6/0.433 kV, 1600KVA Distribution transformer-2 nos.\n6.6/0.230 V (L-L), 100 KVA Lighting Transformer-2 nos.\n220V Lead Acid Battery complete with Battery Charging unit.-1 no.\n6.6 kV 3 Phase, 3 Wire Switchboard 6A&6B (Indoor ) Comprising of Incomer VCB, Buscoupler VCB and Outgoing VCBs/VCPs, Metering and protection as required \n415V,Aluminium Bus-duct as required.\nMCC at Substation-F Comprising of Incomer ACB, Buscoupler ACBs and Outgoing ACBs/MCCB/SFU/ Contactor as required.\n6.6 kV and 415 V Capacitor with Automatic power factor correction of required capacity Banks for power factor improvement as required.\nTwo number of single circuit of 6.6 kV Overhead line comprising of AAAC ’Wolf’ equivalent Conductor for power supply as required.\nFire detection, Alarm and Protection system. 1 Lot
65 65 G Substation-G(SS-7)\nPower receiving arrangment from substation F(SS-7) with Lightning Arrester and Isolator with earth switch as required.\n6.6/0.433 kV, 630KVA Distribution transformer-2 nos.\n6.6/0.230 V (L-L), 100 KVA Lighting Transformer-2 nos.\n220V Lead Acid Battery complete with Battery Charging unit.-1 no.\n6.6 kV 3 Phase, 3 Wire Switchboard 7A &7B (Indoor ) Comprising of Incomer VCB, Buscoupler VCB and Outgoing VCBs/VCPs, Metering and protection as required \n415V,Aluminium Bus-duct as required.\nMCC at Substation-G Comprising of Incomer ACB, Buscoupler ACBs and Outgoing ACBs/MCCB/SFU/ Contactor as required.\n6.6 kV and 415 V Capacitor with Automatic power factor correction of required capacity Banks for power factor improvement as required.\nTwo number of single circuit of 6.6 kV Overhead line comprising of AAAC ’Wolf’ equivalent Conductor for power supply as required.\nFire detection, Alarm and Protection system. 1 Lot
66 66 H Substation-H(SS-8)\nPower receiving arrangment from substation F(SS-8) with Lightning Arrester and Isolator with earth switch as required.\n6.6/0.433 kV, 500KVA Distribution transformer-2 nos.\n6.6/0.230 V (L-L), 100 KVA Lighting Transformer-2 nos.\n220V Lead Acid Battery complete with Battery Charging unit.-1 no.\n6.6 kV 3 Phase, 3 Wire Switchboard 8A & 8B (Indoor ) Comprising of Incomer VCB, Buscoupler VCB and Outgoing VCBs/VCPs, Metering and protection as required \n415V,Aluminium Bus-duct as required.\nMCC at Substation-G Comprising of Incomer ACB, Buscoupler ACBs and Outgoing ACBs/MCCB/SFU/ Contactor as required.\n6.6 kV and 415 V Capacitor with Automatic power factor correction of required capacity Banks for power factor improvement as required.\nTwo number of single circuit of 6.6 kV Overhead line comprising of AAAC ’Wolf’ equivalent Conductor for power supply as required.\nFire detection, Alarm and Protection system. 1 Lot
67 67 I Substation-I(SS-9)\nPower receiving arrangment from substation H(SS-8) with Lightning Arrester and Isolator with earth switch as required.\n6.6/0.433 kV, 315KVA Distribution transformer-2 nos.\n6.6/0.230 V (L-L), 100 KVA Lighting Transformer-2 nos.\n220V Lead Acid Battery complete with Battery Charging unit.-1 no.\n6.6 kV 3 Phase, 3 Wire Switchboard 9A (Indoor ) Comprising of Incomer VCB, Buscoupler VCB and Outgoing VCBs/VCPs, Metering and protection as required \n415V,Aluminium Bus-duct as required.\nMCC at Substation-G Comprising of Incomer ACB, Buscoupler ACBs and Outgoing ACBs/MCCB/SFU/ Contactor as required.\n6.6 kV and 415 V Capacitor with Automatic power factor correction of required capacity Banks for power factor improvement as required.\nTwo number of single circuit of 6.6 kV Overhead line comprising of AAAC ’Wolf’ equivalent Conductor for power supply as required.\nFire detection, Alarm and Protection system. 1 Lot
68 68 Cables\nPower Cables\nControl & Signalling Cables\nLighting Cables & wires\nCommunication Cables 1 LS
69 69 Earthing\nPlant Equipment Earthing\nStructures Earthing\nEarthing for Lightning Protection\nTranformer neutral Earthing 1 LS
70 70 Welding Sockets and 9 number of Electical & Diesel Welding Set 1 LS
71 71 PLC System for Control & Automation,Interlocks, Signalling and instrumentation of entire CHP. 1 LS
72 72 Remote and sequence control equipment & Accessories 1 LS
73 73 Cable Trays, Cable Racks, Cable Trenches, Cable Voults etc. 1 LS
74 74 Illumination System and Luminaires, Lighting poles & Towers, Lighting DBs etc. 1 LS
75 75 DG sets for Emergency Power Supply.-7 nos. 1 LS
76 76 Exhaust Fan, Ceiling Fan, Air Conditioner, insulating Mats etc. 1 LS
77 77 Computers and Peripherals 1 LS
78 78 Communication System 1 LS
79 79 Miscellaneous Equipment 1 LS
80 80 C1. ERECTION, INSTALLATION & COMMISSIONING
81 81 1. Erection of mechanical equipment 1 Lot
82 82 2. Erection of electrical equipment 1 Lot
83 83 3. Erection of other plant and machining etc. 1 Lot
84 84 4. Trial run, and commissioning of the plant 1 Lot
85 85 C2 . OTHERS ITEM
86 86 1. Drinking water system consisting of tanks, pipes, valves, taps etc. 1 Lot
87 87 2. Plant cleaning system 1 As per req.
88 88 3. Any other item left out for completion of the project 1 LS
89 89 C3 . MAINTENANCE AND TRAINING
90 90 1. Operation of the plant for five years as described in Tender document 1 Lot
91 91 2. Maintenance of the plant for five years as described in Tender document 1 Lot
92 92 3. Training of the employer personnel as per tender document 1 As per req.
93 93 Total impact of GST for the purpose of CTC 1 Nos
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail