Nitno . 18/Ee ( Em ) Ws S-I/ ( 20-21 ) Item No-3 Replacement Of Old Lt Panel Board By Cubical Panel Board Fan Dewatering And Vacuum Pump Set ( A- Pump House ) At Deer Park Bps , Dismantling Of Old Panel Structure Including Removing Of Cable Etc & Shifting The Same From Site In Store . , Lt Distribution Panel Sheet Steel Enclosure Made Out Of 2Mm Crca Sheet Totally Enclosed , Powder Coated Free Standing , Floor Mounted Type , Dust& Vermin Proof , Outward Opening , Lockable Doors Having Hidden Hinges And A Bolted Back Cover Both Using Non-Deteriorating Neoprene Rubber Gaskets To Provide Ip Protection . The Each Part Of The Fabricated Panel Will Be Strictly Subjected To Seven Tank Treatment . The Various Components , Assemblies And Sub Equipments Of The Panel Will Be As Per Standard Given In Relevant Is . The Bus Bar Of The Panel Will Be Shaped Out Of High Conductivity , Electrolytic Conductor And Shall Be Liberal Sized In Aluminum . The Control Wiring Of The Panel Will Be Done With Pvc Flexible Copper Wires Of 1 . 5Mm Cross Section . Each Wire Will Be Terminating With A Ferule Crimped To The Wire , Size 1200Mmx1000x400mm . Having Following Components Of Approved Make . , Mccb 415V , Fp 3Phase 50Hz , 100Amp With Handle & Spreader - Make L&T/Siemens , Mccb 415V , Tp 3Phase 50Hz , 25Amp - Make L&T , Mcb Single Pole 6-32Amp . Make L&T/Havells , Mcb Triple Pole 32Amp . Make L&T/Havells , Power Capacitors 415V Unit Of 7Kvar Make: Epcos , Over Load Relay 4 . 5-9 Ampmake: L&T/Siemens , Digial Amp . Meter Make Ae/L&T , Digital Volt Meter Make Ae/L&T , Motor Protection Relay Make: L&T/Siemens , Power Contactor 220V 3Phase18amp . Make L&T/Siemens , Indicating Lights Led Type Ryb & On/Off Make : L&T /Havells/Sg/Bch , Push Button On/Off Make: Ftc/Sg/Bch , Current Transformer100/5 Make: Saviour/Ae /Advance , Current Transformer30/5 Make: Saviour/Ae /Advance , Earthing Of The Complete Panel With Gi Strip & Hard Ware As Required , Fitting Of The Above Components In Panel Enclosure With Terminal Blocks , Channels , Ferrules , Thimble , Support Insulator On Bus Bar , Required Hard Wares Complete In All Respect . , Loading , Unloading By Heavy Labor And Cartage Up To Site , Installation Of The Panel At Site , Connection Of Bus Bars , Links , Bends , Re-Dressing Of Existing Cable At Site , Termination Of Cable Both Incoming & Out Going Side Through Cable Gland & Thimble . , Testing & Commissioning Of Panel & Allied Accessories As Per Required Parameters With Relevant Is . Testing Of The Panel Prior To Switching On As Follow Continuity And Earth Testing , Meggaring Of All Equipments For Phase To Phase , Neutral To Body , Neutral To Earth And Phase To Earth . Testing On Load With Engineer In Charge .