Development Of Ayodhya Airport Sh Construction Of Pre-Engineered Buildings Peb And Other Associated Works On Design And Build Basis Epc, Ayodhya Airport-Uttar Pradesh

Airports Authority Of India has published Development Of Ayodhya Airport Sh Construction Of Pre-Engineered Buildings Peb And Other Associated Works On Design And Build Basis Epc. Submission Date for this Tender is 14-06-2021. Building Work Tenders in Ayodhya Airport Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

27309572
Corrigendum : Development Of Ayodhya Airport Sh Construction Of Pre-Engineered Buildings Peb And Other Associated Works On Design And Build Basis Epc
Open Tender
Indian
Uttar Pradesh
Ayodhya Airport
14-06-2021

Tender Details

Development Of Ayodhya Airport Sh Construction Of Pre-Engineered Buildings Peb And Other Associated Works On Design And Build Basis Epc

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 01-Apr-2021 Corrigendum1 Other 22-04-2021
2 12-Apr-2021 CORRIGENDUMII Date 28-04-2021
3 19-Apr-2021 corigendumIII Date 13-05-2021
4 03-May-2021 CORRIGENDUM-IV Date 08-06-2021
5 25-May-2021 Updated drawings and Broad specifications along with approved makes Other 08-06-2021
6 27-May-2021 AutoCAD drawings Other 08-06-2021
7 08-Jun-2021 Corrigendum-V Date 14-06-2021
8 10-Jun-2021 corrigendium VI Other 14-06-2021

Key Value

Document Fees
INR 11800 /-
EMD
Refer document
Tender Value
INR 66.46 Crore /-

BOQ Items

Name of Work: Development of Ayodhya Airport SH:- Construction of Pre-Engineered Buildings (PEB) and other associated works on Design & Build Basis(EPC).
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Civil Works item1
2 1.01 All design works including but not limited to Design development, Detailed design including architectural and structural design, Good for Construction drawings, shop drawings and as built drawings of works complete as per direction of Engineer-In-Charge. All structural Design & drawings shall be vetted from NIT/IIT. item2 1 Job
3 1.02 Execution of all Civil works including RCC foundation & Pre-engineered Structural Steel, Roofing, Walls, Façade system, Glazing etc all preliminary and/or general requirements for Works as specified in the scope of work including site survey, site establishment, barricading, diversion of road and existing services (if any), demolishing of existing structures (if any), Cutting, filling & leveling of low laying area etc. complete as per direction of Engineer-In-Charge. item3 1 Job
4 1.03 All internal works including finishing but not limited to flooring, cladding, counter, Glass wool Insulated Panels/AAC block panels work, plaster, internal partitions, doors, windows, fitting & fixtures, painting, Stainless steel railing, false ceiling etc. as per approved drawings/ specifications and direction of Engineer-In-Charge.plete item4 1 Job
5 1.04 Site Development i/c construction of Land side/Air Side Roads, Car Park, Kerbs, Foothpaths, Boundary wall, Gates at entry & exit (Segregating Air Side & Land Side Area) including Guard Rooms/ Morchas/ Security Booths as per approved drawings/specifications and direction of Engineer-In-Charge. item5 1 Job
6 1.05 Toilets as per the approved layout & design but not limited to toilet cubicals, all fitting and fixtures, wash basin, water closet, mirrors, sensor urinals, complete plumbing and sanitary work, flooring, wall tiling, false ceiling, baggage counter, plant counter etc. complete as per direction of Engineer-In-Charge item6 1 Job
7 1.06 Landscaping & Horticulture works as per the approved layout complete as per direction of Engineer-In-Charge. item7 1 Job
8 1.07 Construction of precast RCC boundary wall and raising of existing boundary wall as per approved drawings/specifications and direction of Engineer-In-Charge. item8 1 Job
9 1.08 Miscellaneous Works viz. Bore well-02 Nos., MBBR-STP of 75 KLD, Under Ground sump for fire ,Under Ground Static Tank, Rain Water Harvesting (Civil Works), Strom water drainage of city side area, etc as per approved drawings/specifications and direction of Engineer-In-Charge. item9 1 Job
10 1.09 Pre-engineered/ pre-fabricated framed structure buildings – Fire station, Electrical Substation (Service Block), etc. complete in all respect as per approved design /drawings/specifications and direction of Engineer-In-Charge. item10 1 Job
11 2 Electricl Works item11
12 2.01 Internal & External Electrical Installation with LED Lighting i/c Façade & Landscape lighting, Street Light Poles, High Mast, Distribution Panels, DB’s, switch boards, UPS, Lightning Protection System, Automatic Sliding Doors, Cabling, Cable Tray, Hand driers, Geysers etc. item12 1 Job
13 2.02 Sub-station work i/c DG sets with Synchronization Panels, Transformers, HT & LT Panels, HT/ LT cables/ Bus duct, Capacitor Bank, Earthing, Hybrid PF Correction Panel, Insulating Mats etc. item13 1 Job
14 2.03 HVAC – VRV/VRF with Heating cycle, Unitary AC ( Split / Window type), Air Curtains, Water coolers with RO etc. item14 1 Job
15 2.04 Addressable Fire Detection & Alarm System item15 1 Job
16 2.05 Fire Fighting System i/c Automatic Hydrant and Sprinkler systems, Portable Fire Extinguishers etc. item16 1 Job
17 2.06 Building Management System item17 1 Job
18 2.07 Water Supply System, Water Treatment Plant and Sewage Treatment Plant i/c pumps, starters, panels & cabling. item18 1 Job
19 2.08 Way Finding Signage (Indoor & Outdoor signage). item19 1 Job
20 2.09 Public Address & Voice Alarm System, Car Calling System item20 1 Job
21 2.1 Machine Room less Passenger Elevator. item21 1 Job
22 3 Airport System Works (FIDS, SCCTV) item22 1 Job
23 4 IT System works (Active Network, Passive Network, Servers & Audio Visual works, IP EPABX etc.) item23 1 Job
24 5 Providing O & M services for period of 7 years including DLP of 2 years including All inclusive comprehensive maintenance contract (AICMC)for period of 5 years after DLP for the complete installations as provided under BOQ items of main work. item24 1 Job
25 6 Note:- \n1. All works to be carried out as per scope of work given in the AAI’s requirement and conceptual drawings/ design enclosed with tender documents. \n2. The information contained in these Tender Documents, being indicative in its nature, are being provided for the limited purposes of enabling the Tenderers to prepare a tender. These Tender Documents are a summary of available information and no reliance shall be placed on any information or statements contained herein, and no liability is or will be accepted by the AAI regarding accuracy, adequacy or completeness of such information or statements made, nor shall it be assumed that such information or statements will remain unchanged.\n3. The bidders shall be deemed to have full knowledge of the site whether he inspects it or not and no extra charges consequent on any misunderstanding or otherwise shall be allowed including the designs, specifications, scope of work, methodologies, programs and cost etc.\n4. The quoted rates shall be excluding GST.\n item25
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail