| 1 | 1 | Excavation in foundations, trenches etc., in earth work, lift upto 1.50 Metres stacking the eacavated soil not more than 3 metres clear from the edge of the excavation and then returning the stacked soil in 15cm. layers, when required in to plinths sides of foundations etc., consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed with in a lead and lifts Pick and Jumper Work including carriage of material in all leads and lift and direction of Engineer-in-charge. | | 45.31 | Per Cubic meter |
|---|
| 2 | 2 | Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete including carriage of material in all leads and lift and direction of Engineer-in-charge. | | 8.12 | Per Cubic meter |
|---|
| 3 | 3 | Stone filling under floor including carriage of material in all leads and lift and direction of Engineer-in-charge. | | 8.12 | Per Cubic meter |
|---|
| 4 | 4 | Providing form work with steel plates 3.15mm.thick welded with angle iron in frame 30x30x5mm. so as to give a fair finish including centring, shuttering, strutting and propping etc. with wooden battens and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4 Mtrs. and removal of the same for insitu-reinforced concrete & plain concrete work in Foundation, footings basis of columns etc. and mass concrete including carriage of material in all leads and lift and direction of Engineer-in-charge. | | 71.1 | Per Square meter |
|---|
| 5 | 5 | Providing form work with steel plates 3.15mm.thick welded with angle iron in frame 30x30x5mm. so as to give a fair finish including centring, shuutering, strutting and propping etc. with wooden battens and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4 Mtrs. and removal of the same for insitu-reinforced concrete & plain concrete work in Flat surfaces such as soffits of suspended floors, roofs, landings and the like Floors etc.upto 200mm in thickness. including carriage of material in all leads and lift and direction of Engineer-in-charge. | | 90.01 | Per Square meter |
|---|
| 6 | 6 | Providing form work with steel plates 3.15mm.thick welded with angle iron in frame 30x30x5mm. so as to give a fair finish including centring, shuutering, strutting and propping etc. with wooden battens and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4 Mtrs. and removal of the same for insitu-reinforced concrete & plain concrete work in Sides and soffits of beams, beam haunchings, cantilevers, bressumers and lintels not exceeding 1 Mtr. in depth in all heights from floor including carriage of material in all leads and lift and direction of Engineer-in-charge. | | 105.91 | Per Square meter |
|---|
| 7 | 7 | Providing form work with steel plates 3.15mm.thick welded with angle iron in frame 30x30x5mm. so as to give a fair finish including centring, shuutering, strutting and propping etc. with wooden battens and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4 Mtrs. and removal of the same for insitu-reinforced concrete & plain concrete work in Columns, pillars, posts and struts Square, rectangular or polygonal in plan including carriage of material in all leads and lift and direction of Engineer-in-charge. | | 33.12 | Per Square meter |
|---|
| 8 | 8 | Providing form work with steel plates 3.15mm.thick welded with angle iron in frame 30x30x5mm. so as to give a fair finish including centring, shuutering, strutting and propping etc. with wooden battens and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4 Mtrs. and removal of the same for insitu-reinforced concrete & plain concrete work in Edges of slabs and breaks in floors and walls Under 20 cm. wide. including carriage of material in all leads and lift and direction of Engineer-in-charge. | | 41.6 | Per Running meter |
|---|
| 9 | 9 | Providing and laying cement concrete 1:6:12 (1 cement:6 sand : 12 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of centring and shuttering in Foundation and plinth including carriage of material in all leads and lift and direction of Engineer-in-charge. | | 5.59 | Per Cubic meter |
|---|
| 10 | 10 | Providing and laying cement concrete 1:4:8 (1 cement:4 sand:8 graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in Foundation and plinth including carriage of material in all leads and lift and direction of Engineer-in-charge. | | 10 | Per Cubic meter |
|---|
| 11 | 11 | Providing and laying cement concrete work 1:1.5:3 (1 Cement:1.5 Sand:3 graded stone aggregate 20 mm nominal size) machenilcally mixed and vibrated curing complete excluding cost of form work and reinforcement for reinforced concrete work in Foundations,footings bases of columns and the like and mass concrete. including carriage of material in all leads and lift and direction of Engineer-in-charge. | | 40 | Per Cubic meter |
|---|
| 12 | 12 | Providing and laying cement concrete work 1: 1.5:3 (1 Cement:1.5 Sand:3 graded stone aggregate 20 mm nominal size) machenilcally mixed and vibrated curing complete excluding cost of form work and reinforcement for reinforced concrete work in in Suspended Floor roofs, landing and shelves and their support balconies,beams,girders,bressumers and contilever upto floor twolevel all leads and lifts. including carriage of material in all leads and lift and direction of Engineer-in-charge. | | 10 | Per Cubic meter |
|---|
| 13 | 13 | Providing and laying cement concrete work 1: 1.5:3 (1 Cement:1.5 Sand:3 graded stone aggregate 20 mm nominal size) and curing complete machenilcally mixed and vibrated curing complete excluding cost of form work and reinforcement for reinforced concrete work in column, pillars posts and struts upto floor two levels including carriage of material in all leads and lift and direction of Engineer-in-charge. | | 1.9 | Per Cubic meter |
|---|
| 14 | 14 | Providing Tor steel reinforcement for R.C.C. work including bending, binding and placing in position complete upto floor two level Tor Steel including carriage of material in all leads and lift and direction of Engineer-in-charge. | | 7000 | Per Kilogram |
|---|
| 15 | 15 | Random rubble masonry/polygonal rubble masonry (uncoursed/brought to courses) with hard stones of approved quality in foundation and plinth including leveling up with cement concrete 1:6:12 (1 cement :6 sand : 12 graded stone aggregate 20mm nominal size) at plinth level in Cement Mortar 1:6(1 cement:6 sand) including carriage of material in all leads and lift and direction of Engineer-in-charge. | | 19.3 | Per Cubic meter |
|---|
| 16 | 16 | 2nd class brick work using common burnt clay building bricks in super- structure Cement Mortar 1:6 (1 Cement : 6 Sand) above plinth level upto floor two level (Second Class Bricks). including carriage of material in all leads and lift and direction of Engineer-in-charge. | | 20.03 | Per Cubic meter |
|---|
| 17 | 17 | 2nd class half brick masonry in common burnt clay building bricks in Cement Mortar 1:4 (1 cement:4 sand) Second Class Bricks Extra for half brick masonry in super-structure above plinth level upto floor two level including carriage of material in all leads and lift and direction of Engineer-in-charge. | | 10 | Per Square meter |
|---|
| 18 | 18 | Providing woodwork in frames of doors,windows,clerestory,windows and other frames wrought,framed and fixed in position. Sal wood. including carriage of material in all leads and lift and direction of Engineer-in-charge. | | 0.35 | Per Cubic meter |
|---|
| 19 | 19 | Providing and fixing M.S. grills with 10mm dia square bar of required patterns in wooden frames of windows etc. with M.S. Flats, square or round bars with round headed bolts and nuts or by screws. Plain grill including priming coat. including carriage of material in all leads and lift and direction of Engineer-in-charge. | | 53.1 | Per Kilogram |
|---|
| 20 | 20 | Providing 40x3mm flat iron M.S. hold fast 40 cm. Long including fixing to frame with 10mm diameter bolts & nuts and wooden plugs and embeding incement concrete block 30x10x15 cm .1:3:6(1 cement:3 sand : 6 graded stone aggregate 20mm nominal size ) including carriage of material in all leads and lift and direction of Engineer-in-charge. | | 48 | Each |
|---|
| 21 | 21 | Providing 60 mm thick cement concrete flooring with metallic concrete hardner topping under layer of 35 mm thick cement concrete 1:2:4 (1 cement:2 sand:4 graded stone aggregate 20 mm nominal size) and top layer of 15 mm thick metallic concrete hardner consisting of mix 1:2 (1 cement hardner mix : 2 stone aggregate 6 mm nominal size) by volume with which metallic hardening compound of approved quality is mixed in the ratio 4:1 (4 parts of cement: 1 part of metallic floor handening compound of approved quality by weight) including finishing complete. including carriage of material in all leads and lift and direction of Engineer-in-charge. | | 66.02 | Per Square meter |
|---|
| 22 | 22 | Providing and laying anti skid tiles 6mm. Thick Orient-Bell, Rek & Nitco in flooring (300 mmx300mm. size) in flooring 12 mm thick cement mortar 1:3 (1 cement :3 sand) and jointed with cement slurry including carriage of material in all leads and lift and direction of Engineer-in-charge. | | 2.66 | Per Square meter |
|---|
| 23 | 23 | Providing and fixing white glazed tiles 6mm. thick Orient-Bell, Rek & Nitco in wall (200 x400mm. size)treads of steps laid on a bed of 12mm. thick cement mortar 1:3(1cement: 3 sand) finished with flush pointing in white cement. including carriage of material in all leads and lift and direction of Engineer-in-charge. | | 15.71 | Per Square meter |
|---|
| 24 | 24 | 6mm Cement plaster to ceiling In Cement mortar 1:3(1 Cement:3 Sand) including carriage of material in all leads and lift and direction of Engineer-in-charge. | | 90 | Per Square meter |
|---|
| 25 | 25 | 15mm Cement plaster in single coat on the rough side of brick/ concrete/stone walls for interior plastering upto floor two level including arrises,internal rounded angles,chamfers and/or rounded angles not exceeding 80mm in girth and finished even and smooth. Cement Mortar 1:6 (1Cement: 6 Sand). including carriage of material in all leads and lift and direction of Engineer-in-charge. | | 50 | Per Square meter |
|---|
| 26 | 26 | 15mm cement plaster in single coat on fair side of brick/concrete/stone walls for interior plastering upto floor two level including arrises,internal rounded angles,chamfers and/or rounded angles not exceeding 80mm in girth and finished even and smooth. Cement Mortar 1:5 (1 cement: 5 sand). including carriage of material in all leads and lift and direction of Engineer-in-charge. | | 100 | Per Square meter |
|---|
| 27 | 27 | Steel work welded in built upsections,trusses and framedwork,including cutting ,hoisting,fixing in position and applying apriming coat of red lead paint In gratings framed guardbars,ladders,railling,brackets andsimilar works. including carriage of material in all leads and lift and direction of Engineer-in-charge. | | 35 | Per Quintal |
|---|
| 28 | 28 | Providing and fixing M.S. BP Sheet1.66mm to 2mm thick in eavesboard/ facia/soffits/ceiling includingcutting, fixing and welding to steelroof members and applying a coat ofred lead primer complete as per the instruction of Engineer-in-charge(Base members of steel work shall be measured & paid separtely) including carriage of material in all leads and lift and direction of Engineer-in-charge. | | 9 | Per Square meter |
|---|
| 29 | 29 | Steel work welded in built upsections,trusses and framedwork,including cutting ,hoisting,fixing in position and applying apriming coat of red lead paint.1504010000 In beams joists channels ,angles ,tee ,flats with connecting platesor angle cleats as in main andcross beams,hip and jackrafters,purlins connected to commonrafters and the like.including carriage of material in all leads and lift and direction of Engineer-in-charge. | | 21.7 | Per Quintal |
|---|
| 30 | 30 | Providing and fixing 0.60mm thickprepainted steel sheet in roofing withhot dipped metallic zinc coated sheetwith top coat of regular modifiedpolyster (RNP) organic coating of 20microns over 5 microns primercoating to back coat of polyster of 5microns over 5 microns primercoating i/c fixing with prepainted iron Jor L hooks, bolts and nuts 6mm diametre with prepainted limpet and ubber washers complete with all accesoriees as required including carriage of material in all leads and lift and direction of Engineer-in-charge. | | 7.59 | Per Square meter |
|---|
| 31 | 31 | Providing ridges or hips 60 cmover all in plainG.I.sheet with galvanised iron J or L hooks.bolts and nuts 8mm dia G.I. Limpetand bitumen washers copmlete:- 0.63 mm thick sheet including carriage of material in all leads and lift and direction of Engineer-in-charge. | | 4 | Per Square meter |
|---|