| 1 | 1 | Supply of SIGA CC1 (connected to hooter) | item1 | 20 | Nos. |
|---|
| 2 | 2 | Supply of Monitor Module (connected to RCHD) SIGA CT1 | item2 | 10 | Nos. |
|---|
| 3 | 3 | Supply of DelugeValve (only spares are required) | item3 | 2 | Nos. |
|---|
| 4 | 4 | Supply of Repeater Panel | item4 | 2 | Nos. |
|---|
| 5 | 5 | Supply of Monitor Module SIGA -CT1 | item5 | 18 | Nos. |
|---|
| 6 | 6 | Supply of Monitor Module (connected to Air Sampling Device ASD) SIGA CT1 | item6 | 6 | Nos. |
|---|
| 7 | 7 | Air Sampling Device (ASD) | item7 | 6 | Nos. |
|---|
| 8 | 8 | Supply of Optical Smoke Detector | item8 | 209 | Nos. |
|---|
| 9 | 9 | Supply of Heat Detector | item9 | 70 | Nos. |
|---|
| 10 | 10 | Supply of Rate compensated Heat Detector | item10 | 10 | Nos. |
|---|
| 11 | 11 | Supply of Strobe cum Hooter | item11 | 76 | Nos. |
|---|
| 12 | 12 | Supply of Manual Call Point | item12 | 40 | Nos. |
|---|
| 13 | 13 | Supply of Fire Alarm Control Panel (FACP) with computer | item13 | 1 | Nos. |
|---|
| 14 | 14 | Supply of Linear Heat Sensing Cable(LHSC) | item14 | 5500 | Meter |
|---|
| 15 | 15 | Supply of Bulb Detector | item15 | 32 | Nos. |
|---|
| 16 | 16 | Supply of LCPDV (Local Control Panel for Deluge Valve) complete in all respects including control module and monitor module | item16 | 18 | Nos. |
|---|
| 17 | 17 | Installation of SIGA CC1 (connected to hooter) | item17 | 20 | Nos. |
|---|
| 18 | 18 | Installation of Monitor Module (connected to RCHD) SIGA CT1 | item18 | 10 | Nos. |
|---|
| 19 | 19 | Installation of DelugeValve (only spares are required) | item19 | 2 | Nos. |
|---|
| 20 | 20 | Installation of Repeater Panel | item20 | 2 | Nos. |
|---|
| 21 | 21 | Installation of Monitor Module SIGA -CT1 | item21 | 18 | Nos. |
|---|
| 22 | 22 | Installation of Monitor Module (connected to Air Sampling Device ASD) SIGA CT1 | item22 | 6 | Nos. |
|---|
| 23 | 23 | Air Sampling Device (ASD) | item23 | 6 | Nos. |
|---|
| 24 | 24 | Installation of Optical Smoke Detector | item24 | 209 | Nos. |
|---|
| 25 | 25 | Installation of Heat Detector | item25 | 70 | Nos. |
|---|
| 26 | 26 | Installation of Rate compensated Heat Detector | item26 | 10 | Nos. |
|---|
| 27 | 27 | Installation of Strobe cum Hooter | item27 | 76 | Nos. |
|---|
| 28 | 28 | Installation of Manual Call Point | item28 | 40 | Nos. |
|---|
| 29 | 29 | Installation of Fire Alarm Control Panel (FACP) with computer | item29 | 1 | Nos. |
|---|
| 30 | 30 | Installation of Linear Heat Sensing Cable(LHSC) | item30 | 5500 | Meter |
|---|
| 31 | 31 | Installation of Bulb Detector | item31 | 32 | Nos. |
|---|
| 32 | 32 | Installation of LCPDV (Local Control Panel for Deluge Valve) complete in all respects including control module and monitor module | item32 | 18 | Nos. |
|---|