Repair Of Motor Operating System At 40 Mgd Sps Keshopur . , Dismantling Of The Old Starter System Of 250 Kw , Removing Incoming And Outoging Cable Connections , All The Existing Switchgears And Their Mounting Arrangement From The Panel Chambers , Disconnecting The Complete Connection Arrangement , Removing Mounting Plates / Sheets Of Panels , Intereconnecting Bus Bars System And Cleaning Of Panels Etc As Per Site Requirement . , S / O Contactor 550 Amp Mnx550 Or Equivalent Make- L&T / Hpl / Bch , S / O Contactor 400 Amp Mnx400 Or Equivalent Make- L&T / Hpl / Bch , S / O Mccb 630 Amp Tp , Bc-50Ka Or More Make- L&T / Hpl / Bch , S / O Over Load Relay 270-450A / Equivalent Make- L&T / Hpl / Bch , S / O Digital Ampere Meter , 96X96 Mm . Make- L&T / Hpl / Ae , S / O Digital Volt Meter , 96X96 Mm . Make- L&T / Hpl / Ae , S / O Ampere Meter Selector Switch . Make- L&T / Hpl / Sg , S / O Volt Meter Selector Switch . Make- L&T / Hpl / Sg , S / O Indicating Lights . Make- L&T / Hpl / Bch , S / O Star Delta Timer . Make- L&T / Hpl / Bch , S / O Single Phase Preventor Make- L&T / Minilac / Hpl , Fixing All The Above Mccbs / Contactors With Mounting Arrangement / Nut Bolts Etc . Including Modifications In The Startres As Per Site Requirement . Fixing Relays / Timers Etc . The For Making Starters Functional And For Making All The Provisions For Supply Arrangement As Required . The Job Includes Providing Of Material And Consumables As Per Site Requirement . , Making Of Bus Bar Connection Arrangement Along With Providing And Fixing Of Required Bus Bars Including Modifications Of Exisitng For Connecting Mccb And Contactors For Making Star Delta Starting System , Making All The Connections Of Supply Arrangement And Interconnections Of The Contactors Etc . The Job Includes Bending / Shaping Of Bus Bars With Phase Indicating Coloured Sleeves , Providing Of Bus Bar Support , Nut / Bolts , Other Material And Consumables As Per Site Requirement . , Making The Required Connections Of Relays Etc . Through Copper Cables / Wires Of Suitable Size As Required For Making All The Connections For Operation Of Starters With Tripping Arrangement . Fixing Of Protection System Against Single Phasing With Complete Wiring And Other Required Works . Restoration Of Cooling Arrangement Of Starter Panels By Wiring Of Cooling Fans With Contactors . The Job Includes Providing Of Material And Consumables As Per Site Requirement . , Making The Required Incoming And Outgoing Connections Of The Starters By Connecting Cables For Supply Arrangement Including Carrying Out All The Works With Providing Of Material And Consumables As Per Site Requirement . , Fixing Of Metering And Indicating Instruments With Control Arrangement And Making The Wiring Connections Including Providing / Laying / Connecting Copper Flexible Wire / Cable Including Thimbling Etc . And Other Works As Per Required At Site . , Testing & Commissioning Of The Renovated 250 Kw Starters And Other Equipments Complete With Setting Of Relays , Calibration Of Meters Etc . As Per Ct Rating Requirement And Testing Of Operations For Starters . , Dismantling Of The Old Starter System Of 160 Kw , Removing Incoming And Outoging Cable Connections , All The Existing Switchgears And Their Mounting Arrangement From The Panel Chambers , Disconnecting The Complete Connection Arrangement , Removing Mounting Plates / Sheets Of Panels , Intereconnecting Bus Bars System And Cleaning Of Panels Etc As Per Site Requirement . , S / O Contactor 400 Amp Mnx400 Or Equivalent Make- L&T / Hpl / Bch , S / O Contactor 300 Amp Mnx300 Or Equivalent Make- L&T / Hpl / Bch , S / O Mccb 400 Amp Tp , Bc-50Ka Or More Make- L&T / Hpl / Bch , S / O Over Load Relay 180-300A Make- L&T / Hpl / Bch , S / O Digital Ampere Meter , 96X96 Mm . Make- L&T / Hpl / Ae , S / O Digital Volt Meter , 96X96 Mm . Make- L&T / Hpl / Ae , S / O Ampere Meter Selector Switch . Make- L&T / Hpl / Sg , S / O Volt Meter Selector Switch . Make- L&T / Hpl / Sg , S / O Indicating Lights . Make- L&T / Hpl / Bch , S / O Star Delta Timer . Make- L&T / Hpl / Bch , S / O Single Phase Preventor Make- L&T / Minilac / Hpl , Fixing All The Above Mccbs / Contactors With Mounting Arrangement / Nut Bolts Etc . Including Modifications In The Startres As Per Site Requirement . Fixing Relays / Timers Etc . The For Making Starters Functional And For Making All The Provisions For Supply Arrangement As Required . The Job Includes Providing Of Material And Consumables As Per Site Requirement . , Making Of Bus Bar Connection Arrangement Along With Providing And Fixing Of Required Bus Bars Including Modifications Of Exisitng For Connecting Mccb And Contactors For Making Star Delta Starting System , Making All The Connections Of Supply Arrangement And Interconnections Of The Contactors Etc . The Job Includes Bending / Shaping Of Bus Bars With Phase Indicating Coloured Sleeves , Providing Of Bus Bar Support , Nut / Bolts , Other Material And Consumables As Per Site Requirement . , Making The Required Connections Of Relays Etc . Through Copper Cables / Wires Of Suitable Size As Required For Making All The Connections For Operation Of Starters With Tripping Arrangement . Fixing Of Protection System Against Single Phasing With Complete Wiring And Other Required Works . Restoration Of Cooling Arrangement Of Starter Panels By Wiring Of Cooling Fans With Contactors . The Job Includes Providing Of Material And Consumables As Per Site Requirement . , Making The Required Incoming And Outgoing Connections Of The Starters By Connecting Cables For Supply Arrangement Including Carrying Out All The Works With Providing Of Material And Consumables As Per Site Requirement . , Fixing Of Metering And Indicating Instruments For The Metering / Indicating System Of The Panel Chambers With Control Arrangement And Making The Wiring Connections Including Providing / Laying / Connecting Copper Flexible Wire / Cable Including Thimbling Etc . And Other Works As Per Required At Site . , Testing & Commissioning Of The Renovated Starters And Other Equipments Complete With Setting Of Relays , Calibration Of Meters Etc . As Per Ct Rating Requirement And Testing Of Operations For Starters .