

FileName | File Description | File Size |
A7DF7CBF-BE3A-4995-9609-1DC520D4A7CD.html | Tender Notice-Tender Notice | 0 |
GCC.pdf | Tender Document-General Conditions of Contract | 1611.75 |
Special_Instructions_to_the_Bidders_20200717.pdf | Tender Document-Special_Instructions_to_the_Bidders_20200717 | 1717.96 |
Tender-Acceptance-Format.pdf | Tender Document-Tender-Acceptance-Format | 84.23 |
FAQs-IOCL-Online-EMD.pdf | Tender Document-FAQs-IOCL-Online-EMD | 559.48 |
PPE_Matrix.pdf | Tender Document-PPE Matrix | 3148.96 |
BOQ_142112.xls | Tender Document-BOQ | 298.50 |
Tendernotice_1.pdf | Tender Document-Notice Inviting E-Tender | 896.57 |
BidSecurityDeclaration.pdf | Tender Document-Bid Security Declaration (Annexure-A) | 466.14 |
Tender.pdf | Tender Document-Tender Document | 2221.53 |
Name of Work: Housekeeping, Horticulture and Environment management works at PMBPL Baitalpur | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Payment towards wages to Contract labourers for House Keeping ,Hotriculture and Environment management at PMBPL Baitalpur (03 Labours). It includes Minimum basic wages (including additional payment), PF, ESI and Bonus. | Itemcode 1 | 72 | MON |
2 | 2 | Liquid hand wash dettol (200 ml) | Itemcode 4 | 192 | EA |
3 | 3 | Toilet Air freshner Odonil (50 gram for thirty days) | Itemcode 5 | 48 | EA |
4 | 4 | Harpic toilet cleaner (500 Ml) | Itemcode 6 | 48 | EA |
5 | 5 | Liquid phenyl for office floor cleaning | Itemcode 7 | 720 | L |
6 | 6 | Napthalene Balls | Itemcode 8 | 48 | KG |
7 | 7 | Cleaning acid(Muritac acid)for bathroom tiles Harpic or any other equivalent Brand | Itemcode 9 | 720 | L |
8 | 8 | Cleaning duster | Itemcode 10 | 96 | EA |
9 | 9 | CoConut Bamboo broom | Itemcode 11 | 96 | EA |
10 | 10 | Green brass broom (Full jhadu) | Itemcode 12 | 120 | EA |
11 | 11 | Mopping cloth | Itemcode 13 | 120 | EA |
12 | 12 | Mopping Bucket | Itemcode 14 | 16 | EA |
13 | 13 | Floor wiper | Itemcode 15 | 24 | EA |
14 | 14 | Room freshner | Itemcode 16 | 24 | EA |
15 | 15 | Collins mirror cleaning | Itemcode 17 | 48 | EA |
16 | 16 | Hand towel for toilet | Itemcode 18 | 48 | EA |
17 | 17 | Toilet cleaning brush | Itemcode 19 | 48 | EA |
18 | 18 | Mosquito repellent and machine (good night) | Itemcode 20 | 192 | EA |
19 | 19 | Office room Dust bin | Itemcode 21 | 32 | EA |
20 | 20 | Outdoor dustbins | Itemcode 22 | 24 | EA |
21 | 21 | Supplying and stacking of good earth at site including royalty and carriage up to any lead complete. [Note: Volume of earth measured in stacks will be reduced by 20% for payment]. | Itemcode 23 | 1000 | CUM |
22 | 22 | Supply and planting sapling (not less than 45 cm in height and 60 cm centre to centre) of Casurina, Labrum, Gulmohar, Ashokas, Bottle Palm, Bougenvilla, Hibiscus, Roses or other approved type of variety of plants, watering & maintenance for 30 days minimum complete in all respects inclusive of cost of all materials, labour, tools, tackles etc. as per specifications and direction of the Site Engineer. | Itemcode 24 | 144 | EA |
23 | 23 | Providing Circular Cement Concrete pots of specified size, cast with cement concrete of nominal mix 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 6 mm nominal size), reinforced with 7 Nos (3 Nos horizontal & 4 Nos vertical “U“ shape) M.S. wires of 3.5 mm dia as per design, including required form work, finishing with cement punning on exposed surface, curing for specified period and stacking in required rows & height, all complete as per direction of the Engineer-in-Charge. (Top inside diameter 35 cm, outer bottom diameter 25 cm, total height 35 cm with wall thickness of 25.4 mm). | Itemcode 25 | 100 | EA |
24 | 24 | Filling of the following size empty pots with mixture of good earth & manure in the ratio of 2:1 (2 parts of Good Earth & 1 part of Manure) and placing them on approprite place including carriage of earth, manure and pots up to 50 metre, as per direction of the Engineer-in-Charge. [Note: The cost of good earth, earthen pots & manure will be paid seperately]. (Size of empty pots 35 cm top diameter, 25 cm bottom diameter & 35 cm perpendicular height). | Itemcode 26 | 100 | EA |
25 | 25 | Preparation of beds for hedging and shrubbery by excavating 60 cm deep and trenching the excavated base to a further depth of 30 cm, refilling the excavated earth after breaking clods and mixing with sludge or manure in the ratio of 8:1 (8 parts of stacked volume of earth after reduction by 20% : one part of stacked volume of sludge or manure after reduction by 8%), flooding with water, filling with earth if necessary, watering and finally fine dressing, levelling etc. including stacking and disposal of materials declared unserviceable and surplus earth by spreading and levelling as directed, within a lead of 50 m & lift up to 1.5 m complete. (Note: Cost of sludge, manure or extra earth shall be paid for seperately under relevant item). | Itemcode 27 | 200 | CUM |
26 | 26 | Uprooting rank vegetation and weeds by digging the area to a depth of 60 cm, removing all weeds and other growth with roots by forking repeatedly, breaking clods, rough dressing, flooding with water, uprooting fresh growths after 10 to 15 days and then fine dressing for planting new grass, including disposal of all rubbish with all leads and lifts. | Itemcode 28 | 500 | SQM |
27 | 27 | Supplying and stacking of well decayed cattle manure at site including royalty and carriage up to any lead complete. [Note: Volume of cattle manure measured in stacks will reduced by 8% for payment]. | Itemcode 29 | 200 | CUM |
28 | 28 | Mixing earth and sludge or manure in the required proportion specified or directed by the Engineer-In-Charge. | Itemcode 30 | 1000 | CUM |
29 | 29 | Spreading of sludge, dump manure and/or good earth in required thickness including removal of debris/ un-wanted material, consolidation, dressing, levelling and watering etc. complete as per directions of the Engineer-in-Charge. [Note: Cost of sludge, dump manure and/or good earth shall be paid separately under relevant item of SOR]. | Itemcode 31 | 1200 | CUM |
30 | 30 | Supplying & Stacking of Selection No.1/ Doob Grass at site fresh & free from weeds having proper roots in green including loading, unloading, carriage and all taxes paid etc. complete as per directions of the Engineer-in-Charge. | Itemcode 32 | 500 | SQM |
31 | 31 | Grassing with selection No. 1/ Doob grass including watering and maintenance of the lawn for 30 days or more till the grass forms a thick lawn, free from weeds and fit for mowing including supply and filling of good earth, if required during maintenance period. [Note: The grass and good earth shall be paid for separately under relevant item of SOR] : With grass Turf | Itemcode 33 | 500 | SQM |
32 | 32 | Providing & laying Selection No. 1 grass turf with earth 50mm to 60mm thickness of existing ground prepared with proper level and ramming with required tools wooden and than rolling the surface with light roller make the surface smoothen and light watering the same maintenance for 30 days or more till the grass establish properly, complete as per direction of the Engineer-in-Charge. | Itemcode 34 | 500 | SQM |
33 | 33 | Constructing half brick circular tree guard with common burnt clay F.P.S. (non modular) bricks of class designation 5.0, internal diameter 1.25 metre and height 1.2 metre above ground and 0.20 metre below ground, bottom two courses laid dry and top three courses in cement mortar 1:6 (1 cement : 6 fine sand) and the intermediate courses being in dry honey comb masonry as per design complete. | Itemcode 35 | 40 | EA |
34 | 34 | Service Charge to the Contractor | Itemcode 36 | 24 | LS |
Copyright © 2021 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail