Military Engineer Services-MES has published Repair Of Dg Sets Amf Panels Cooling Appliances Desert Cooler Window Type Split Type Deep Freezer Refrigerators Water Coolers Maint Of Ceiling Fans Exhaust Fans Geysers Fire Alarm System Incl Connected Items. Submission Date for this Tender is 09-03-2021. Fire Alarm Systems Tenders in AF STSTION CHANDINAGAR Haryana. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 02-Mar-2021 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 09-03-2021 |
Name of Work: REPAIR/MAINT OF DG SETS AMF PANELS & CONNECTED WORKS, COOLING APPLIANCES DESERT COOLER, WINDOW TYPE, SPLIT TYPE, DEEP FREEZER, REFRIGERATORS & WATER COOLERS AT AF STATION CHANDINAGAR & REPAIR/MAINT OF CEILING FANS, EXHAUST FANS, GEYSERS, FIRE ALARM SYSTEM INCL CONNECTED ITEMS AT AF STN CHANDINAGAR UNDER GE AF FARIDABAD | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | M&L for servicing of split type AC's of capacity 1.5 TR and 2 TR comprising of the following tasks installed at different locations including refixing, commissioning and testing complete all as specified and directed by Engineer-in-Charge. \r\n(a) Inspecting and checking the Indoor/outdoor units for noise free operation.\r\n(b) Checking the electrical connection for tightness\r\n(c) Cleaning the condenser with cleaning agent followed with pressurized water and cleaning the cooling coil with air blower.\r\n(d) Greasing/Oiling of condenser fan motor and blower motor.\r\n(e) Checking for any refrigerant leakage.\r\n(f) Checking for serviceability of remote control unit. | 35 | Each Job | |
2 | 2 | M&L for servicing and Maintenance of window type AC's of capacity 1.5 TR comprising of the following tasks at different locations including Refixing, commissioning and testing complete all as specified and directed by Engineer-in-Charge. \r\n(a) Inspecting, taking down, brushing cleaning with blower including acid/detergent wash of condenser and cooling coil.\r\n(b) Carry out operation of blower and compressor and ensure that satisfactory functioning of all parts.\r\n(c) Inspecting the leakage in the system.\r\n(d) Checking of the earth continuity of electrical parts.\r\n(e) Checking the functioning of thermostat.\r\n(f) Inspection of all electrical parts. | 25 | Each Job | |
3 | 3 | M&L for Servicing & maintenance of water coolers of any capacity comprising of the following tasks at different location complete all as specified and directed by Engineer-in-Charge.\r\n(a) Inspection, taking down, opening, dismantling, descaling, brushing cleaning of storage tanks\r\n(b) Examination water tightness, leak proof of storage tank after cleaning.\r\n(c) Carry out operation of all stop cock, push cock, float valve etc.\r\n(d) Inspect overflow and remove blockage if any.\r\n(e) Check and correct earth continuity of electric items\r\n(f) Check thermostat and test its functioning\r\n(g) Inspect drain pipe and remove blockage if any\r\n(h) Check and correct all electrical wiring & test its functioning\r\n(j) Testing of water cooler after repair. | 20 | Each Job | |
4 | 4 | S&F in replacement of starting relay for split type AC units of capacity 1.5/2 TR as required at site complete all as specified and directed by Engineer-in-Charge. \r | 10 | Each | |
5 | 5 | S&F in replacement of starting capacitor 80-100/100-120 mfd for split type A/C's of capacity 2 TR complete all as specified and directed by Engineer-in-Charge.\r\n | 20 | Each | |
6 | 6 | S&F in replacement of running capacitor 30/36 mfd for split type AC unit as required at Site and complete all as specified and directed by Engineer-in-Charge. | 15 | Each | |
7 | 7 | S&F in replacement of contactor, as per existing model, coil voltage 230V installed in split type AC units complete all as specified and directed by Engineer-in-Charge. \r\n | 5 | Each | |
8 | 8 | Taking out and replacement of condenser fan motor incl bush/bearings of split type AC units capacity 1.5/2 TR complete all as specified and directed by Engineer-in-Charge. | 5 | Each Job | |
9 | 9 | All as per item No 8 above but for blower motor complete all as specified and directed by Engineer-in-Charge. | 3 | Each Job | |
10 | 10 | M&L for repair to PCB of AC for remote operation complete testing and installation and all electrical connections complete all as specified and directed by Engineer-in-Charge. | 5 | Each Job | |
11 | 11 | M&L for repair to PCB of inverter type split AC for remote operation complete testing and installation and all electrical connections complete all as specified and directed by Engineer-in-Charge. | 4 | Each Job | |
12 | 12 | Disconnecting and taking down old burnt compressor of capacity 2TR from split type AC unit and replacing the same with new one from the company as per existing model (suitable for CFC free refrigerent) complete all as specified and directed by Engineer-in-Charge. | 3 | Each Job | |
13 | 13 | Disconnecting and taking down old burnt compressor of capacity 1.5 TR from split type AC unit and replacing the same with new one from the company as per existing model (suitable for CFC free refrigerent) complete all as specified and directed by Engineer-in-Charge. | 3 | Each Job | |
14 | 14 | S&F in replacement of condensing coil of copper tubing suitable for 1.5 TR Spilt AC recharging of refrigerent as required making all necessary connection and testing for smooth funtioning complete all as specified and directed by Engineer-in-Charge. | 2 | Each Job | |
15 | 15 | S&F in replacement of condensing coil of copper tubing suitable for 2 TR Spilt AC recharging of refrigerent as required making all necessary connection and testing for smooth funtioning complete all as specified and directed by Engineer-in-Charge. | 2 | Each Job | |
16 | 16 | M&L for repair to leaking area of split type AC unit of capacity 2 /1.5 TR capacity including pressure testing, dehydration and gas charging complete all as specified and directed by Engineer-in-Charge. | 15 | Each Job | |
17 | 17 | S&F in replacmemt remote control unit (cordless) as per existing model for 2/1.5 TR split type A/C unit complete all as specified and directed by Engineer-in-Charge. | 5 | Each | |
18 | 18 | S&F in replacement of air filter for split type A/C units of capacity upto 2/1.5 TR as per sample complete all as specified and directed by Engineer-in-Charge. | 3 | Each | |
19 | 19 | M&L for providing insulation to copper tubing’s from Indoor to outdoor units with foam insulation followed with PVC flexible pipe 50mm with clamps complete all as specified and directed by Engineer-in-Charge. | 25 | RM | |
20 | 20 | S&F in replacement 3 core copper PVC insulated of size 2.5sqmm complete all as specified and directed by Engineer-in-Charge. \r\n | 30 | RM | |
21 | 21 | Supply and charging gas CFC free to AC 1.5/2 TR capacity complete all as specified and directed by Engineer-in-Charge. | 30 | Kg | |
22 | 22 | S&F in replacement of copper tubing 3/8” outer dia suitable for 1.5/2 TR AC including nitril rubber thermal insulation capacity complete all as specified and directed by Engineer-in-Charge. | 30 | RM | |
23 | 23 | All as per item 22 above but here in before 5/8” outer dia complete all as specified and directed by Engineer-in-Charge. | 40 | RM | |
24 | 24 | S&F in replacement of thermostat switch as required at site complete all as specified and directed by Engineer-in-Charge. | 4 | Each | |
25 | 25 | S&F 3.15 mfd for fan motor capacitor complete all as specified and directed by Engineer-in-Charge. | 10 | Each | |
26 | 26 | S&F in replacement of overload protector for compressor as reqd at site complete as specified and directed by Engineer-in-charge. | 5 | Each | |
27 | 27 | S&F in replacement of starting relay as required at site for water coolers complete including connecting, testing complete all as specified and directed by Engineer-in-Charge. | 10 | Each | |
28 | 28 | S&F in replacement of waste water tray as required at site made out of 20 gauge GI sheet complete with PVC drain pipe including painting with PVC drain pipe including painting with aluminum paint complete all as specified and directed by Engineer-in-Charge. | 2 | Each | |
29 | 29 | S&F in replacement of brass float valves accessories 15mm size as required at site complete all as specified and directed by Engineer-in-Charge. | 5 | Each | |
30 | 30 | Disconnecting & taking out compressor ('R' type) from water cooler and refixing the same after repair including flushing dehydration and gas charging complete all as specified and directed by Engineer-in-Charge. | 3 | Each Job | |
31 | 31 | Disconnecting and taking down water cooler of any make and size for repairs including detection of leakage in the system rectifying the same, dehydration & recharging of gas testing the water cooler for smooth & satisfactoryworking complete all as specified and directed by Engineer-in-Charge. | 2 | Each | |
32 | 32 | S&F in replacement of CP push cock ISI marked 15mm base complete all as specified and directed by Engineer-in-Charge. | 5 | Each | |
33 | 33 | S&F in replacement of starting capacitor 100/120 mfd for compressor complete all as specified and directed by Engineer-in-Charge. | 5 | Each | |
34 | 34 | S&F in replacement of new condenser motor single phase as required at site for water cooler with clamps, bolts, nuts & rubber bushes complete including connecting testing complete all as specified and directed by Engineer-in-Charge. | 2 | Each | |
35 | 35 | S&F single pole and neutral enclosure with two pin and eath plug and socket complete with one single pole MCB 20-32 Amps complete all as specified and directed by Engineer-in-Charge. | 15 | Each | |
36 | 36 | Taking down desert cooler of any size by disconnecting electrical supply, cleaning, oiling of all moving part of pumps and fans, Replacing PVC pipes, nozzles, distributors, checking electrical connections complete all as specified and directed by Engineer-in-Charge. | 100 | Each | |
37 | 37 | S&F cable copper conductor PVC insulated FRLS 2 core 1.5 Sqmm complete all as specified and directed by Engineer-in-Charge. | 50 | RM | |
38 | 38 | S&F in replacement of wood pads (set of three) as per sample complete all as specified and directed by Engineer-in-Charge.\r\n | 100 | Each | |
39 | 39 | S&F in replacement the new desert cooler pump including testing for proper functioning complete all as specified and directed by Engineer-in-Charge.\r\n | 70 | Each | |
40 | 40 | S&F Desert cooler motor copper wound complete all as specified and directed by Engineer-in-Charge. | 30 | Each | |
41 | 41 | S&F in replacement the new exhaust fan kit with super enameled copper wire complete all as specified and directed by Engineer-in-Charge.\r\n | 10 | Each | |
42 | 42 | S&F in replacement new body of desert cooler as per sample duly painted of 20 SWG sheet with 22 SWG flops, front grill, PVC pipe, nozzle, distributor and nut bolts washers for fixing fan clamps, complete all as specified and directed by Engineer-in-charge. | 10 | Each | |
43 | 43 | Supply and fixing front grill of desert cooler as per sample complete all as specified and directed by Engineer-in-Charge. | 15 | Each | |
44 | 44 | S&F in replacement plug top 5 Amps complete all as specified and directed by Engineer-in-Charge. | 50 | Each | |
45 | 45 | M&L Scrapping old paint and painting of desert cooler with one coats of red oxide inside and two coat of synthetic enamel paint( in/ou tside) complete all as specified and directed by Engineer-in-Charge. | 100 | Each | |
46 | 46 | S&F in replacement of running capacitor 6 mfd for blower motor as required at site complete all as specified and directed by Engineer-in-Charge.\r\n | 10 | Each | |
47 | 47 | S&F in replacement selector switch as required at site and complete all as specified and directed by Engineer-in-Charge. | 3 | Each | |
48 | 48 | S&F in replacement of rotary switch as requirement at site complete all as specified and directed by Engineer-in-Charge. | 4 | Each | |
49 | 49 | S&F in replacement of new blower motor 1/6 HP as required at site single phase 230 volts double shaft with clamp bolts, nuts and rubber bushes including testing & commissioning complete all as specified and directed by Engineer-in-Charge. | 3 | Each | |
50 | 50 | S&F in replacement of thermostats as required at site complete for window type AC 1.5 /2 TR complete all as specified and directed by Engineer-in-Charge. | 6 | Each | |
51 | 51 | Disconnecting and taking down the'R' type compressor 1.5 TR for window /split AC as per existing make and Refixing the same with new one including flushing, dehydration and gas changing complete all as specified and directed by Engineer-in-Charge. | 3 | Each | |
52 | 52 | Disconnecting & taking down of window type AC of any make and Refixing the same after replacement of copper condenser coil including soldering/welding and commissioning complete all as specified and directed by Engineer-in-Charge. | 3 | Each job | |
53 | 53 | S&F in replacement of voltage stabilizer of capacity 5KVA complete all as specified and directed by engr in charge. | 5 | Each | |
54 | 54 | M&L for dismantling refrigerator/Deep freezer any capacity for servicing/ repair work dusting, thoroughly cleaning of interiors and components, lubrication of moving parts, providing proper insulation to peeled out/damaged portion, replacement of unserviceable parts/components, reassembling and testing complete all as specified and directed by Engineer-in-Charge.\r\nNote:- Components reqd to be replaced will be measured and paid separately | 16 | Each Job | |
55 | 55 | Supply only the following parts/components of refrigerator/Deep Freezer of 165/190/315/324/360/388/425 Ltr capacity complete all as specified and directed by Engineer-in-Charge.\r\n(a) Box type relay | 2 | Each | |
56 | 56 | All as per item No 55 but Thermostat with control knobcomplete all as specified and directed by Engineer-in-Charge.\r\n | 3 | Each | |
57 | 57 | All as per item No 55 but Drier complete all as specified and directed by Engineer-in-Charge. | 2 | Each | |
58 | 58 | All as per item No 55 but Condenser complete all as specified and directed by Engineer-in-Charge. | 2 | Each | |
59 | 59 | All as per item No 55 but Copper capillary Tube complete all as specified and directed by Engineer-in-Charge. | 10 | RM | |
60 | 60 | All as per item No 55 but Magnetic door gasket complete all as specified and directed by Engineer-in-Charge. | 2 | Each | |
61 | 61 | All as per item No 55 but Chiller tray complete all as specified and directed by Engineer-in-Charge. | 2 | Each | |
62 | 62 | All as per item No 55 but Chiller tray PVC complete all as specified and directed by Engineer-in-Charge. | 2 | Each | |
63 | 63 | All as per item No 55 but Vegetable tray PVC complete all as specified and directed by Engineer-in-Charge. | 2 | Each | |
64 | 64 | All as per item No 55 but Aluminium grill rack PVC Coated) complete all as specified and directed by Engineer-in-Charge. | 2 | Each | |
65 | 65 | All as per item No 55 but Pigmy lamp 15W with screwed/Bayonet Cap complete all as specified and directed by Engineer-in-Charge. | 2 | Each | |
66 | 66 | Supply and fixing of hermitically sealed compressor unit comprising of the compressor coupled with inbuilt AC single phase 230V motor and other standard compressor accessories complete for refrigerator upto 315 ltr capacity complete all as specified and directed by Engineer-in-Charge.\r\nMake: Shriram/Kirloskar/Usha/Voltas/Godrej | 1 | Each | |
67 | 67 | All as per item No 66 here-in-above but refrigerator of 315 to 360 Ltr capacity complete all as specified and directed by Engineer-in-Charge. | 2 | Each | |
68 | 68 | M&L for flushing out refrigerant pipes, vacuuming the hermitically sealed compressor, charging of refrigerant in adequate quantity, connecting suction and discharge lines and conducting leakage test for refrigerator/deep freezer of any capacity complete all as specified and directed by Engineer-in-Charge. | 2 | Each Job | |
69 | 69 | M&L for rewiring of refrigerator/Deep Freezer of any capacity using PVC insulated single core multistranded copper conductor cable of suitable size including thimbles complete all as specified and directed by Engineer-in-Charge. | 2 | Each Job | |
70 | 70 | Taking down Geyser of any size and capacity after disconnecting all electrical and water connections, dismantling of geyser for checking of unserviceable parts, repair/replacement of worn out parts, reassembling, testing, cleanig with chemical to clear choking due to scaling and refixing in its original location incl making all necessary electrical & water connections complete all as specified and directed by Engineer-in-Charge.\n(Note: Parts will be measured separately and paid for under ‘Supplied only’ rates here-in-after) | 40 | Each Job | |
71 | 71 | S&F Heating Element 1500 W complete all as specified and directed by Engineer-in-Charge. | 40 | Each | |
72 | 72 | S&F Thermostat 45°C to 100°C complete all as specified and directed by Engineer-in-Charge. | 20 | Each | |
73 | 73 | S & F Geyser assy ( rupturing plate or U assembly) any make and type for 25 Ltrs capacity water heater incl replacement of rubber seal nuts and bolts complete all as specified and directed by Engr - in- charge. | 10 | Each | |
74 | 74 | S&F Inlet/Outlet PVC connection set complete all as specified and directed by Engineer-in-Charge. | 20 | Each | |
75 | 75 | S&F Geyser apparatus plate for 25 ltrs complete all as specified and directed by Engineer-in-Charge. | 10 | Each | |
76 | 76 | Brazing of steel tank after taking out the steel tank from outer body complete all as specified and directed by Engineer-in-Charge. | 5 | Each Job | |
77 | 77 | Grouting of nuts and bolts for fixing of geyser incl nuts, bolts & washers, cement work complete all as specified and directed by Engineer-in-Charge. | 10 | Each Job | |
78 | 78 | M&L for rewinding the following fans using super enameled copper conductor of suitable gauge including insulation varnishing, packing including taking down and refixing the fans in original position complete all as specified and directed by Engineer-in-Charge. (Note: Other unserviceable / worn out components will be measured and paid separately here-in-after) \nCeiling fan any sweep complete all as specified and directed by Engineer-in-Charge. | 250 | Each | |
79 | 79 | All as per item No 78 but Exhaust fan 300 to 450 mm sweep complete all as specified and directed by Engineer-in-Charge. | 10 | Each | |
80 | 80 | All as per item No 78 but Exhaust fan 450 to 600 mm sweep complete all as specified and directed by Engineer-in-Charge. | 10 | Each | |
81 | 81 | All as per item No 78 but Air circulator of any sweep complete all as specified and directed by Engineer-in-Charge. | 8 | Each | |
82 | 82 | All as per item No 78 but Wall Mounted fan of any sweep complete all as specified and directed by Engineer-in-Charge. | 15 | Each | |
83 | 83 | All as per item No 78 but Axial flow fan of any sweep complete all as specified and directed by engineer in charge. | 2 | Each | |
84 | 84 | M & L for Dismantling,opening & reinstalling of Siren including cuttting removing burnt winding wire from armature and preparing slots , rewinding the same with super enamled water proof copper winding wire of suitable gauge with necessary insulation materials varnising etc for complete all as specified and directed by Engineer-in-Charge. | 1 | Each | |
85 | 85 | S&F in replacement ball bearing suitable for Ceiling fan of any sweep complete all as specified and directed by Engineer-in-Charge.\n | 50 | Each | |
86 | 86 | S&F in replacement ball bearing suitable forfor Exhaust fan of any sweep complete all as specified and directed by Engineer-in-Charge.\n | 20 | Each | |
87 | 87 | S&F in replacement ball bearing suitable for Air circular/wall fan of any sweep complete all as specified and directed by Engineer-in-Charge.\n | 10 | Each | |
88 | 88 | S&F in replacement capacitors of 3.15 Mfd complete all as specified and directed by Engineer-in-Charge. | 200 | Each | |
89 | 89 | S&F in replacement capacitors of 4 Mfd complete all as specified and directed by Engineer-in-Charge. | 20 | Each | |
90 | 90 | S&F in replacement brass bush suitable for wall Mounted fan of any sweep complete all as specified and directed by Engineer-in-Charge. | 5 | Each | |
91 | 91 | S&F cable copper conductor PVC insulated FRLS 3 core 1.5 Sqmm in existing MS conduit including taking out old u/s complete all as specified and directed by Engineer-in-Charge. | 200 | RM | |
92 | 92 | S&F in replacement analouge addresseble type smoke detector based on scattered light & response LED shall be visible from 360 deg blinking LED in normal operation with soft addressing with base with self built intelligence complete all as specified and directed by Engineer-in-Charge. | 10 | Each | |
93 | 93 | S&F in replacment addresseble electronic sounder cum strobe complete all as specified and directed by Engineer-in-Charge. | 1 | Each | |
94 | 94 | M&L for carrying out ‘B’ check including replacement of Fuel filter, Lube oil filter, Air filter, coolant and Engine oil for DG sets complete all as specified and directed by Engineer-in-Charge of following capacities:-\nNote: Engine oil will be paid in relevant item\n(a) DG set of capacity 200 KVA complete all as specified and directed by Engineer-in-Charge.\nMake Greaves Cotton | 1 | Each | |
95 | 95 | All as per item No 94 but DG set of capacity 110 KVA complete all as specified and directed by Engineer-in-Charge. \nMake Cummins | 1 | Each | |
96 | 96 | All as per item No 94 but DG set of capacity 75 KVA complete all as specified and directed by Engineer-in-Charge.\nMake Kirloskar | 1 | Each | |
97 | 97 | All as per item No 94 but DG set of capacity 62.5 KVA complete all as specified and directed by Engineer-in-Charge.\nMake Kirloskar | 1 | Each | |
98 | 98 | All as per item No 94 but DG set of capacity 15 KVA complete all as specified and directed by Engineer-in-Charge.\nMake Kirloskar | 1 | Each | |
99 | 99 | M&L for repairing of self starter of DG set capacity 15 KVA including transporting upto workshop to carry out necessary replacement of burnt copper winding with new copper winding/ coil of existing gauge from rotor and stator coil, cleaning of slots, dryings varnishing and proper insulating to winding complete all as specified and directed by Engineer-in-Charge.\nNote : (a) Necessary repair will be carry out within time period given by Engr-in-Charge otherwise a penalty of 500/- per day will be deducted from contractor due. \n(b) Contractor have to make temporary arrangement of starter for running of DG set of defective starter. | 1 | Each Job | |
100 | 100 | All as per item No 99 above herein but DG Set of capacity 62.5 KVA complete all as specified and directed by Engineer-in-Charge. | 1 | Each Job | |
101 | 101 | All as per item No 99 above herein but DG Set of capacity 75 KVA and upto 200 KVA complete all as specified and directed by Engineer-in-Charge. | 2 | Each Job | |
102 | 102 | M&L for servicing of AMF panel of DG set of capacity upto to 75 KVA cleaning of AMF panel, rectification of defect rewiring replacement of D/S indicator with new indicator of complete AMF panel and replacement of U/S relays under respective item of this schedule complete all as specified and directed by Engineer-in-Charge. | 1 | Each Job | |
103 | 103 | All as per item No 102 above herein but DG Set of capacity above 75 KVA and upto 200 KVA complete all as specified and directed by Engineer-in-Charge. | 2 | Each Job | |
104 | 104 | Supply only Automatic voltage regulator relay 415V AC complete all as specified and directed by Engineer-in-Charge. | 1 | Each | |
105 | 105 | Supply only Electronic timer 240V AC, adjustment time 6-60Sec complete all as specified and directed by Engineer-in-Charge. | 1 | Each | |
106 | 106 | M&L for replacement of AVR upto 200 KVA 3 Phase complete incl taking down old u/s one after disconnecting electrical connections complete all as specified and directed by Engineer-in-Charge. | 1 | Each | |
107 | 107 | S&F in repair of Autocut Electrical Battery Charger 12V DC, 5 Amp Unit SMPS with Constant Voltage Output with Battery Charging Transformer and Moulded Type Rectifier Unit etc complete all as specified and directed by Engineer-in-Charge. | 2 | Each | |
108 | 108 | All as per item No 107 above but Battary Charger 24V DC, 10 Amp complete all as specified and directed by Engineer-in-Charge. | 1 | Each | |
109 | 109 | S&F in repair of Engine Start Relay, 12 VDC,as required on site complete all as specified and directed by Engineer-in-Charge | 2 | Each | |
110 | 110 | S&F in repair of Engine Start Relay, 24 VDC, For as required on site complete all as specified and directed by Engineer-in-Charge | 1 | Each | |
111 | 111 | S&F in repair Selector switch S12 RUN/OFF/AUTO complete all as specified and directed by Engineer-in-Charge. | 2 | Each | |
112 | 112 | S&F in repair Selector switch STOP EMERGENCY complete all as specified and directed by Engineer-in-Charge. | 2 | Each | |
113 | 113 | Supply and filling in sump/topping up engine oil, multi grade 20w40 in engine or relpacement of engine oil complete all as specified and directed by Engineer-in-Charge.\nMake :- Indian oil / Hindusthan petrolium / Castrol / Pride /Servo | 100 | Ltr | |
114 | 114 | S&F in replacement of 3 pole power contactor LT MNX 140 CONT complete all as specified and directed by Engineer-in-Charge. Make : L&T. | 2 | Each | |
115 | 115 | S&F in replacement of 3 pole power contactor LT MNX 225 CONT complete all as specified and directed by Engineer-in-Charge. Make : L&T. | 1 | Each | |
116 | 116 | S&F in replacement of solenoid switch suitable including all necessary arrangement for kirloskar CUMMINS Gen set of capacity upto 200 KVA complete all as specified and directed by Engineer-in-Charge. | 2 | Each | |
117 | 117 | M&L for (KIT Injector Repair) for DG set upto 200 KVA kirloskar Gen Set disconnecting and opening of fuel injector assembly, taking out each all UNSV parts of injector such as injector repair kit including calibration of injector, checking of pressue complete for each injector including renewal of injector repair kit complete all as specified and directed by Engineer-in-Charge. | 1 | Each Job |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail