Calibration Of Instruments , Regular And Breakdown Maintenance Of C And I Instruments And Equipments At Vgtps / Phase-Ii Forthe Period From 01 . 04 . 2021 To 30 . 09 . 2021 ..- 2 1.01 Calibration Of Pressure And Temperature Gauges Bi01010001010000000000000515bi0100001113 200 Instrument 3 1.02 Calibration Of Pressure, Temperature, Level And Flow Transmitters / Switches, Rtd, Thermocouples And On / Off Solenoid Valves Etc. Bi01010001010000000000000515bi0100001114 140 Instrument 4 1.03 Calibration Of Pneumatic Control Valves Operated By I / P Positioners, Smart Positioners And Hydraulic Valves Operated By I / H Converters And Lvdts, Calibration Of Cems Analyzer Bi01010001010000000000000515bi0100001115 40 L.S 5 1.04 Daily Walk Down Work: Daily Walk Down And Visual Inspection Of Field Instruments Bi01010001010000000000000515bi0100001116 183 Per Day 6 2 Instruments Cleaning And Terminal Tightness Checking Work Bi01010001010000000000000515bi0100001117 7 2.1 Cleaning And Terminal Tightness Checking Of Pressure / Temperature / Flow / Level Transmitters, Switches, Signal Conditioners & Sensors, Junction Boxes, On / Off Valve Actuator Etc. Impulse Line Flushing And Leak Attending Work Bi01010001010000000000000515bi0100001118 250 Instrument 8 2.2 Cleaning, Terminal Tightness Checking And Leakage Arresting Of Pressure / Temperature Gauges Thermocouples, Rtd, Sov, Limit Switches And Swas & Cems Equipment’S Etc. Bi01010001010000000000000515bi0100001119 120 Instrument 9 2.3 Control Valve Positioner / Air Filter Regulator / Airlock Relay / Volume Booster Etc. Cleaning And Leak Attending Work Bi01010001010000000000000515bi0100001120 40 L.S 10 3 Dcs, Plc Modules And Servers Cleaning Works Bi01010001010000000000000515bi0100001121 11 3.1 Gt Abb Dcs, Stg Siemens Dcs, Dm Plant Modicon Plc Modules, Woodward Governing, Tsi System, Fim Cleaning And Terminal Tightness Checking Work Bi01010001010000000000000515bi0100001122 120 L.S 12 3.2 Other Plc In Ia / Pa, Ip / Lp Injection, Ets, N2 System, Etc. Module Cleaning & Terminal Tightness Checking Work Bi01010001010000000000000515bi0100001123 50 L.S 13 3.3 Gt, Stg, Dm Plant Ows And Ews & Server System Cleaning Work Bi01010001010000000000000515bi0100001124 15 Per System 14 3.4 Gtg&Stg Start-Up: Gtg & Stg Startup Activities Bi01010001010000000000000515bi0100001125 30 Per Startup 15 4 Break Down Maintenance / Replacement / Releasing And Re-Fixing Of Field Instruments Bi01010001010000000000000515bi0100001126 16 4.1 Replacement / Releasing And Re-Fixing Of Pressure / Temperature / Flow / Level Transmitters & Switches And Other Field Instruments Etc. For Defect And Mechanical Co-Ordination Work Bi01010001010000000000000515bi0100001127 80 Instrument 17 4.2 Replacement / Releasing And Re-Fixing Of Field Instruments Such As Gauges, Rtd, Thermocouple, Manifolds And Impulse Line Except Turbine Area. Bi01010001010000000000000515bi0100001128 50 Instrument 18 4.3 Replacement / Releasing And Re-Fixing Of On / Off Valves / Actuators, Limit Switches, Pilot Actuators, Air Regulators, O-Ring And Gaskets Etc. For Defect And Mechanical Co-Ordination Bi01010001010000000000000515bi0100001129 50 Instrument 19 4.4 Replacement / Releasing And Re-Fixing Of Pneumatic Control Valves Positioner, Position Transmitter, Airlock Relay, Volume Booster, Limit Switches Etc., Vibration Sensors, Speed Sensors, Thermocouples / Rtds In Gas And Steam Turbine Area. For Defect And Other Mechanical Co-Ordination Work 20 4.5 Assistantship In Dcs Control Loop Checking Of Signals And Cable Healthiness Checking, Spare Cable Tracing Etc. And Electrical Co-Ordination Work 21 4.6 Replacement / Healthiness Checking Of Abb Symphony Harmony / Siemens Dcs, Modicon Plc, Woodward Governing System Modules & Other Plc Cards And Fim Replacement Etc. 22 4.7 Functional Checking Of Pressure / Temperature Transmitters / Switches / Rtd / Thermocouple / Flame Scanner, Transducers Etc. With Dcs And Operational Checking Of On / Off Solenoid Valves And Limit Switches Pneumatic Control Valves. 23 4.8 Assistantship In Check Measurement Of New Materials