Overhauling Of Sea Water Hydrophore System On Mfv Matsya Drushti , To Undertake Complete Overhauling Of Sea Water Hydrophore System As Per The Following Sow And Annexure-A To The Satisfaction Of Hsl & Shipstaff . , Sea Water Hydrophore Tank Top Cover To Be Removed , Cleaned Inside The Tank , Buffed , Painted , Pressure Tested And Shown To Ship Staff And Surveyor Pipe Line Degutting And Regutting , Blanking For Pressure Testing Also Including . Sea Water Hydrophore System Above Defects To Be Rectified Along With Material And System Trials To Be Shown To Ship Staff And Surveyor ( Contractor Has To Quote For Material/Spares At Line Item Sl . No . 1 . 5 Of Boq ) . , Electrical Pressure Cut Out Unit To Be Checked If Any Defect Found Cut Out To Be Renewed And Made Operational , New Pressure Cut Out Procurement And Fitment In Contractor Scope ( Contractor Has To Quote For Material/Spares At Line Item Sl . No . 1 . 5 Of Boq ) . , Sea Water Hydrophore Pump And Motor ( 5Hp ) :Pump And Motor To Be Removed , Dismantled , Inspect All Parts , Renewed The Bearings , Mechanical Seal/Gland Packing , Wear Rings , Seals , Impeller , Keys , Lock Nut , Couplings , Spider , Coupling Bolts Foundation Ss Bolts , Purging Cocks , Pressure Gauge Lines And Cocks ( 1/2 ) Ss Bolt Nuts With Washers , Gaskets And Boxuped And Alignment To Be Done , Painted , Fitted Back With End Pipe Line Connections And Operation To Be Shown To Ship Staff And Surveyors , Material Procurement And Fitment Machinery Works Brazing Works All Consumables In Contractor Scope ( Contractor Has To Quote For Material/Spares At Line Item Sl . No . 1 . 5 Of Boq ) . , Sea Water Hydrophore System Pipe Lines ( 65Mm Dia And 40Mm Dia ) Material Cu-Ni 20Mtrs System Pipe Lines To Be Removed And Renewed As Per Existing New Pipes . Fitment Along With And Flanges , Bends , New Gaskets , New Ss Bolts , Nuts And Washers , System To Be Pressure Tested And Shown To Ship Staff And Surveyor . Material Procurement , Machining Works , Brazing Works , All Consumable Are In Contractor Scope ( Contractor Has To Quote For Material/Spares At Line Item Sl . No . 1 . 5 Of Boq ) . , Consumables / Components / Items / Spares / Material: For Executing Of The Above Mentioned Jobs , Contractor Has To Procure , Supply All Items And Fitted In Its Place . Contractor Has To Quote Lumpsum Cost For Materilas/Spares/Consumables For Above Entire Sow ( Sl . No . 1 To 1 . 4 ) And Annexure-A . The Taxes Will Be Paid As Per Actuals . The Cost Of Spares Quoted By The Contractor Will Be Considered On Not Exceeding Basis Of Total Lumpsum Cost Mentioned In The Boq For Satisfactory Completion Of The Specified Sow . Payment Will Be Made At Actuals On Not Exceeding Quoted Cost Of This Serial ( 1 . 5 ) Against Third Party/Oem Invoice .