| 1 | 1 | DISMANTLING WORK | BI01010001010000000000000515BI0100001112 | | |
|---|
| 2 | 1.01 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead. For thickness of tiles 10 mm to 25 mm 2-4-2-B (MORTH) | BI01010001010000000000000515BI0100001113 | 33.73 | Cum |
|---|
| 3 | 2 | SITE CLEARANCE | BI01010001010000000000000515BI0100001114 | | |
|---|
| 4 | 2.01 | Clearing jungle including uprooting of rank vegetation ,grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. 2-2\n(MORTH) | BI01010001010000000000000515BI0100001115 | 1.35 | Hec. |
|---|
| 5 | 3 | EARTHWORK | BI01010001010000000000000515BI0100001116 | | |
|---|
| 6 | 3.01 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.) 3-13-1-A (MORTH)\n | BI01010001010000000000000515BI0100001117 | 1749.39 | Cum |
|---|
| 7 | 4 | BACK FILLING | BI01010001010000000000000515BI0100001118 | | |
|---|
| 8 | 4.01 | Construction of embankment with approved material obtained from borrow pits cu.m (including cost of compensation for earth taken from private land) with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 A.R D.S.R. 2018 (1.1.2+ 1.2.8.1) | BI01010001010000000000000515BI0100001119 | 281.49 | Cum |
|---|
| 9 | 5 | DISPOSAL OF SOIL | BI01010001010000000000000515BI0100001120 | | |
|---|
| 10 | 5.01 | Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead upto 1 km for all lifts, complete as per directions of Engineer-in-charge. 1.1.18 DSR 2018 | BI01010001010000000000000515BI0100001121 | 1467.9 | Cum |
|---|
| 11 | 6 | P.C.C. | BI01010001010000000000000515BI0100001122 | | |
|---|
| 12 | 6.01 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) 12-4 (MORTH) | BI01010001010000000000000515BI0100001123 | 12.35 | Cum |
|---|
| 13 | 7 | WHITE SAND STONE & GRANITE WORK | BI01010001010000000000000515BI0100001124 | | |
|---|
| 14 | 7.01 | 40 mm thick fine dressed Sand stone flooring over 20 mm (average) thick base of cement mortar 1:5 (1 cement : 5 coarse sand) with joints finished flush.\nDSR 18 11.28.2 | BI01010001010000000000000515BI0100001125 | 282.92 | Sqm |
|---|
| 15 | 8 | Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing , curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. Polished Granite stone slab jet Black, Cherry Red, Elite Brown, Cat Eye or equivalent. DSR 18 11.56.1 | BI01010001010000000000000515BI0100001126 | 21.98 | Sqm |
|---|
| 16 | 9 | CEMENT CONCRETE WORK (SUB STRUCTURE) | BI01010001010000000000000515BI0100001127 | | |
|---|
| 17 | 9.01 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications RCC Grade M25 Using concrete Mixer 12-5-4 (MORD) | BI01010001010000000000000515BI0100001128 | 65.86 | Cum |
|---|
| 18 | 10 | CEMENT CONCRETE WORK (SUPER STRUCTURE) | BI01010001010000000000000515BI0100001129 | | |
|---|
| 19 | 10.01 | Providing and laying reinforced cement concrete in superstructure as per drawing\nand technical specifications Clauses 800, 1205.4 and 1205.5 13-1-2-A (MORD) | BI01010001010000000000000515BI0100001130 | 39.74 | Cum |
|---|
| 20 | 11 | STEEL | BI01010001010000000000000515BI0100001131 | | |
|---|
| 21 | 11.01 | Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications 13-6 (MORTH) | BI01010001010000000000000515BI0100001132 | 24.4 | Ton |
|---|
| 22 | 12 | CENTRING & SHUTTRING | BI01010001010000000000000515BI0100001133 | | |
|---|
| 23 | 12.01 | Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. 5.9 DSR 2018 5.9.2 | BI01010001010000000000000515BI0100001134 | 100.7 | sqm |
|---|
| 24 | 12.02 | 5.9.1 | BI01010001010000000000000515BI0100001135 | 90.9 | sqm |
|---|
| 25 | 12.03 | 5.9.3 | BI01010001010000000000000515BI0100001136 | 266.96 | sqm |
|---|
| 26 | 13 | EXISTING TEMPLE PAINTING | BI01010001010000000000000515BI0100001137 | | |
|---|
| 27 | 13.01 | painting Two Coats on New Concrete Surfaces Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701 10-5 (MORD) | BI01010001010000000000000515BI0100001138 | 1041.4 | Sqm |
|---|
| 28 | 14 | DUSTBIN | BI01010001010000000000000515BI0100001139 | | |
|---|
| 29 | 14.01 | Trash bins: 2 wheeler of 120 ltr. Capacity\nSize: D480 x D 550 x H 940mm MR\n | BI01010001010000000000000515BI0100001140 | 10 | Nos. |
|---|
| 30 | 15 | SOLAR WATER PUMP | BI01010001010000000000000515BI0100001141 | | |
|---|
| 31 | 15.01 | Supply, erection, Testing and commissioning of 7.5 H.P Solar Water Pump System at Sati Kund consisting of 7.5 HP Solar Openwell Pump Horizontal Openwell 7.5 H.P (3 Phase AC, 300V , 17.0 Amp , 50 Hz), 10 Mtr. Head, Discharge in LPD 5,75,000 \nWarranty -03 Years. M.R. | BI01010001010000000000000515BI0100001142 | 2 | Set |
|---|
| 32 | 15.02 | 7500 Wp Solar Panels\nWarranty -5 Years, Life – 25 years M.R. | BI01010001010000000000000515BI0100001143 | 2 | Set |
|---|
| 33 | 15.03 | Controller (7.5 HP 380 Vac 3?, 800 Vdc max),\nWarranty -03 Years M.R. | BI01010001010000000000000515BI0100001144 | 2 | Set |
|---|
| 34 | 15.04 | Change Over starter for 7.5 HP Motor.\nWarranty -03 Years M.R. | BI01010001010000000000000515BI0100001145 | 2 | Set |
|---|
| 35 | 15.05 | Suitable MS structure for panel and other\naccessories. M.R. | BI01010001010000000000000515BI0100001146 | 2 | Set |
|---|
| 36 | 15.06 | Annual Maintenance Contract for Both\nSystems. Regular Visit :Quarterly\nEmergency Visit :02 Nos.(As per the system\nrequirement) M.R. | BI01010001010000000000000515BI0100001147 | 1 | Set |
|---|