| 1 | 1 | Name of Work: Construction of Kitchen cum store room at PUM School at Pungampalli H/O Desipalayam | BI01010001010000000000000515BI0100001112 | | |
|---|
| 2 | 2 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. | BI01010001010000000000000515BI0100001113 | 24.02 | Cum |
|---|
| 3 | 3 | Cement Concrete 1:4:8 (One Cement, Four sand and Eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete. | BI01010001010000000000000515BI0100001114 | 7.4 | Sqm |
|---|
| 4 | 4 | Random rubble masonry in Cement Mortar 1:5 (one cement and Five sand) including simultaneous pointing ,curing, neat finishing, etc, complete | BI01010001010000000000000515BI0100001115 | 24.13 | Cum |
|---|
| 5 | 5 | Collection and supply of gravel from approved quarry in layers not mor than 15cm thick well rammed, watered and compacted Complete complying with standard specification | BI01010001010000000000000515BI0100001116 | 6.08 | Cum |
|---|
| 6 | 6 | Supply and filling inside basement with FILLING SAND from approved quarry in layers not more than 15cm thick well rammed, watered and compacted complete complying with standard specification | BI01010001010000000000000515BI0100001117 | 2.03 | Cum |
|---|
| 7 | 7 | Brick work using second class Country bricks of size 23x11x7cm in Cement Mortar 1:5 (one cement and Five sand) including curing, neat finishing, etc, complete | BI01010001010000000000000515BI0100001118 | 12.92 | Cum |
|---|
| 8 | 8 | Supplying and fabricating and placing in position MS steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc., complete complying with standards specification | BI01010001010000000000000515BI0100001119 | 0.5 | Tons |
|---|
| 9 | 9 | Supplying and errecting centering for sides and soffits including supports and strutting up to 3.29m height for plane surfaces as detailed below in all floors with all cross | BI01010001010000000000000515BI0100001120 | 32.77 | Tons |
|---|
| 10 | 10 | Supplying and errecting centering for sides and soffits including supports and strutting up to 3.29m height for plane surfaces as detailed below in all floors with all cross | BI01010001010000000000000515BI0100001121 | 6.29 | Sqm |
|---|
| 11 | 11 | Cement Concrete of mix 1:11/2:3 (One cement, one and half sand and three aggregate) with water proofing compound of 2% by weight of cement used and using 20mm size machine crushed granite stone jelly etc., complete. | BI01010001010000000000000515BI0100001122 | 5.41 | Sqm |
|---|
| 12 | 12 | Supplying and fabrication of the following steel doors and windows of size 0.90x2.10m including cost and conveyance of all and all charges etc., complete | BI01010001010000000000000515BI0100001123 | | |
|---|
| 13 | 13 | Steel door | BI01010001010000000000000515BI0100001124 | 2 | Nos |
|---|
| 14 | 14 | Steel windows | BI01010001010000000000000515BI0100001125 | 6 | Nos |
|---|
| 15 | 15 | Towards Labour charges for fixing in position of supplied Steel doors and steel windows including all labour charges | BI01010001010000000000000515BI0100001126 | | |
|---|
| 16 | 16 | Steel door | BI01010001010000000000000515BI0100001127 | 3.78 | Sqm |
|---|
| 17 | 17 | Steel windows | BI01010001010000000000000515BI0100001128 | 6.48 | Sqm |
|---|
| 18 | 18 | Special ceiling plastering with cement mortar 1:3. using 10mm thick in all floors etc.,complete. | BI01010001010000000000000515BI0100001129 | 31.97 | Cum |
|---|
| 19 | 19 | Plastering with cement mortar 1:5, using 12mm thick in all floors etc.,complete. | BI01010001010000000000000515BI0100001130 | 120.17 | Sqm |
|---|
| 20 | 20 | Special ceiling plastering with cement mortar 1:3. using 20mm thick in all floors etc.,complete. | BI01010001010000000000000515BI0100001131 | 28.53 | Cum |
|---|
| 21 | 21 | Granolathic floor finishing with C.C. 1:2:4 mix using 10mm to 12mm ISS chips to 25mm thick including cost and labour charges etc.,complete. | BI01010001010000000000000515BI0100001132 | 47.4 | Cum |
|---|
| 22 | 22 | Distempering two coats with best approved oil bound Distember including cost and labour charges etc.,complete. | BI01010001010000000000000515BI0100001133 | 95.55 | Sqm |
|---|
| 23 | 23 | Exterior Emulsion two coats with best approved oil bound Distember including cost and labour charges etc.,complete. | BI01010001010000000000000515BI0100001134 | 50.9 | Sqm |
|---|
| 24 | 24 | Painting two coats to new Irion works including cost and labour charges etc.,complete. | BI01010001010000000000000515BI0100001135 | 20.52 | Sqm |
|---|
| 25 | 25 | Supplying and fixing in position cuddappah slabs of 38/40 mm thick including labour charges for conveyance and finishing etc complete in all respects as directed by the departmental officers | BI01010001010000000000000515BI0100001136 | 2.16 | Sqm |
|---|
| 26 | 26 | Provision for Name board | BI01010001010000000000000515BI0100001137 | 1 | Nos |
|---|
| 27 | 27 | GST Amount for providing Service to Government Contract Works for the above Construction Works.\n | BI01010001010000000000000515BI0100001138 | 1 | GST Amount |
|---|