Military Engineer Services-MES has published Manning & Operation Of Ac Plant At Nad Trombay & Thane, Dg Set, Pump Set At Ts Mahul & Nsd Sewri And Repair & Maintenance Of Ac Plant At Ahu, Chiller Pump Cooling Tower Control Panel At Nad Trombay, Dg Set Pump Set, Oh Tank Water Supply Line At Ts Mahul &. Submission Date for this Tender is 02-02-2021. Fire Fighting Consumable Tenders in MANKHURD Maharashtra. Bidders can get complete Tender details and download the document.




Tender Notice

26683809
Manning & Operation Of Ac Plant At Nad Trombay & Thane, Dg Set, Pump Set At Ts Mahul & Nsd Sewri And Repair & Maintenance Of Ac Plant At Ahu, Chiller Pump Cooling Tower Control Panel At Nad Trombay, Dg Set Pump Set, Oh Tank Water Supply Line At Ts Mahul &
Open Tender
Indian
Maharashtra
MANKHURD
02-02-2021

Tender Details

MANNING & OPERATION OF AC PLANT AT NAD TROMBAY & THANE, DG SET, PUMP SET AT TS MAHUL & NSD SEWRI AND REPAIR & MAINTENANCE OF AC PLANT AT AHU, CHILLER PUMP COOLING TOWER CONTROL PANEL AT NAD TROMBAY, DG SET PUMP SET, OH TANK WATER SUPPLY LINE AT TS MAHUL & SEWARI AND COMPREHENSIVE REPAIRS TO FIRE FIGHTING SYSTEM AND CONNECTED WORKS AT MANKHURD AREA UNDER GE (NW) MANKHURD.

Key Value

Document Fees
INR 1000 /-
EMD
INR 213500.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: MANNING & OPERATION OF AC PLANT AT NAD TROMBAY & THANE, DG SET, PUMP SET AT TS MAHUL & NSD SEWRI AND REPAIR & MAINTENANCE OF AC PLANT AT AHU, CHILLER PUMP COOLING TOWER CONTROL PANEL AT NAD TROMBAY, DG SET PUMP SET, OH TANK WATER SUPPLY LINE AT TS MAHUL & SEWARI AND COMPREHENSIVE REPAIRS TO FIRE FIGHTING SYSTEM AND CONNECTED WORKS AT MANKHURD AREA UNDER GE (NW) MANKHURD.
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Manning & Operation of Central AC Plants [Installation consisting of AC plant with chilled water system 150 TR capacity having 03 Nos compressors each of 75 TR capacity (02 Nos working at a time and 01 No. standby) with all connected equipments and machineries as per Serial No 1 of Annexure 'A' to Particular Specifications] round the clock through out the month in three shifts (including Sundays and Holidays) by employing one operator cum AC machenic per shift of eight hours including carrying out routine maintenance and upkeeping the Installation / AC Plants in operation condition complete in all respects as specified and directed :- \nLocation : Missar Mine Workshop at NAD (Trombay):\n(i) 1st shift - 0600 hrs to 1400 hrs\n(ii) 2nd shift - 1400 hrs to 2200 hrs\n(iii) 3rd shift - 2200 hrs to 0600 hrs\nNotes for ITEM NOS 01 TO 05: Quoted rates shall also be deemed to include the following elements:-\n(i) To provide uniform, tools & plants, safety means like glove etc to the employees and also alternative employee (reliever) for Manning and Operation of AC Plants/Installation so that the other employees can avail the facility of weekly leave etc.\n(ii) To keep the AC Plant Room & allied area in clean and tidy condition during the operation period.\n(iii) To carryout the routine maintenance, minor repairs, oiling, greasing and to rectify the minor defects to keep the plants / Installation in serviceable condition all as directed by the GE and Engineer-in-Charge. However, the major repairs, replacements, overhauling, gas charging, topping-up oil etc are not included in the scope of the above items.\n(iv) To keep necessary documentation duly signed by all the concerned. \n(v) To hand over the entire plant in serviceable condition at the time of completion (vi) Contractor shall submit the details of payment of wages for staff employed through Aadhaar linked bank accounts for payment purpose. (vii)Contribution towards bonus EPF, ESIC the amount is payable only after submission of valid and authentic document in support of having paid the requisite amount to the employed labour. \n\n\n\n\n\n\n\n\n\n\n\n 11 Per Month
2 2 Manning & Operation of Central AC Plants [Installation consisting of AC plant with chilled water system 30 TR capacity having 03 Nos compressors each of 15 TR capacity (02 Nos working at a time and 01 No. standby) with all connected equipments and machineries as per Serial No 2 of Annexure 'A' to Particular Specifications] through out the month in two shifts (including Sundays and Holidays) by employing one operator cum AC machenic per shift of eight hours including carrying out routine maintenance and upkeeping the Installation / AC Plants in operation condition complete in all respects as specified and directed :- \nLocation : Magzine and AWS at NAD(Trombay):\n(i) 1st shift - 0600 hrs to 1400 hrs\n(ii) 2nd shift - 1400 hrs to 2200 hrs\n 11 Per Month
3 3 Manning & Operation of Central AC Plants [Installation consisting of AC Plant of direct expansion type 60 TR capacity having 03 Nos compressors each of 30 TR capacity (02 Nos working at a time and 01 No. standby) with all connected equipments and machineries as per Serial No 3 of Annexure 'A' to Particular Specifications] round the clock through out the month in three shifts (including Sundays and Holidays) by employing one operator cum AC machenic per shift of eight hours including carrying out routine maintenance and upkeeping the Installation / AC Plants in operation condition complete in all respects as specified and directed :- \nLocation : New Mine Workshop, P-35(NAD):\n(i) 1st shift - 0600 hrs to 1400 hrs\n(ii) 2nd shift - 1400 hrs to 2200 hrs\n(iii) 3rd shift - 2200 hrs to 0600 hrs 11 Per Month
4 4 Manning & Operation of Central AC Plants [Installation consisting of AC Plant of direct expansion type 30 TR capacity having 02 Nos compressors each of 30 TR capacity (01 No. working at a time and 01 No. standby) with all connected equipments and machineries as per Serial No 4 of Annexure 'A' to Particular Specifications] round the clock through out the month in three shifts (including Sundays and Holidays) by employing one operator cum AC machenic per shift of eight hours including carrying out routine maintenance and upkeeping the Installation / AC Plants in operation condition complete in all respects as specified and directed :- \nLocation : P-78 Magzine at NAD Trombay:\n(i) 1st shift - 0600 hrs to 1400 hrs\n(ii) 2nd shift - 1400 hrs to 2200 hrs\n(iii) 3rd shift - 2200 hrs to 0600 hrs 11 Per Month
5 5 M & L for dismantling condenser connections for descaling, plugging them and providing 15 mm bore tee outlet for local circulation of mild acid solution in the condenser (separate container and small pump set to circulate mild acid solution shall be used). The PH value of solution shall be 4 and it shall be checked frequently i.e. every 1 hour during the operation. The Scalgun WS solution or equivalent solution as approved by the GE shall be used for discaling purpose. After 2 to 3 hours of cleaning, if the PH value remains less than 7, flush with fresh water added with sodium carbonate. After above process, the end covers shall be opened and condenser tubes shall be cleaned with Nylon brush, subsequently after closing the end covers, circulate mild acid solution as specified above and PH value shall be maintained as above, flushing the same with fresh water including recharging of stored refrigerant upto required pressure complete all as specified and directed for AC Plant of condensor 3 x 75 TR capacity (NAD Missarmine).\nNotes: The quoted rates shall also be deemed to include the following elements :-\n(a) The solution shall be warmed upto 35 Degree Celsius.\n(b) During the entire process of cleaning, the PH value of water shall be 7.\n(c) Provision of solution for descaling, rubber gaskets, washers, nuts, bolts etc as directed. 3 Each Job
6 6 -diito- all as per item No. 05 hereinbefore but for Condensar of AC Plant of 3x30 TR Capacity of EKM WKSP at NAD 3 Each Job
7 7 -diito- all as per item No.05 hereinbefore but for Condensar of AC Plant of 3x15 TR Capacity AWS at NAD 3 Each Job
8 8 -ditto- all as per item No. 05 herein before but for AC Plant of 3 x 30 TR Capacity P-35, 2 x 30 TR Capacity P-78 capacity EKM WKSP at NAD 5 Each Job
9 9 Dismantling cooling coil section of AHU for descaling and provision of 2 Nos 15mm tee outlet for local circulation of mild acid solution in the coil. Separate container and small pump set shall be used to circulate mild acid solution with 4 PH value. The Scalgun WS/Cleansol or equivalent solution as approved by the GE shall be used for descaling. If the PH value remains less than 7, flush with fresh water added with sodium carbonate till PH value attains to 7. Refixing the coil section in position, carryout minor repairs including fixing arrangement etc. AHU coil fins shall be cleaned by Sealgum solution by spraying the solution with washing pump upto the required level for 150 TR Capacity of AHU Plant Missar Mine NAD 3 Each Job
10 10 -ditto- all as per item No. 09 herein before but for the chiller connection of AC Plant of 3 x 30 TR Capacity of P-35, 2 x 30 TR Capacity of P-78, 3 x 30 TR capacityof EKM WKSP at NAD and HQ 31 WEU Thane 11 Each Job
11 11 -ditto- all as per item No. 09 herein before but for the chiller connection of AC Plant of 3 x 15 TR Capacity AWS at NAD 3 Each Job
12 12 Supply only refrigerant (R-22) gas as per requirement, complete all as specified and directed. Make : MAFRON/FLORON/ REFRON/ FREON\n 410 KG
13 13 Supply only refrigerant (R-407 C )gas as per requirement, complete all as specified and directed. Make : MAFRON/FLORON/ REFRON/ FREON. 75 KG
14 14 Supply only compressor oil as per requirement, complete all specified and directed. Make : Servo, HP, BP, Sheetal N-68, Freezol 36. 230 Ltrs
15 15 Supply and fix in repairs chiller Water Sensors in various AC plants 6 Each
16 16 Disconnecting chiller connection for descaling, providing 2 Nos of 15mm dia tee and plugging for circulating mild acid solution in the chiller (Separate container and small pump set shall be used to circulate mild acid solution with PH value 4). The Scalgun WS/Cleansol or equivalent solution as approved by the GE shall be used for descaling purpose. After 2 to 3 hours of cleaning if the PH value remains less than 7, flush with fresh water added with sodium carbonate till PH value attains to 7 for the chiller connection of AC plants of 3 x 75 TR Capacity (Missar Mine) complete all as specified and directed.\nNotes: The quoted rates shall also be deemed to include the following elements :- \n(a) The solution shall be warmed upto 35 Degree Celsius \n(b) During the entire process of cleaning, the PH value of water shall be 7.\n(c) Provision of solution for descaling, rubber gaskets, washers, nuts, bolts etc as directed. 3 Each Job
17 17 -ditto- all as per item No. 16 hereinbefore but for 60 TR capacity (Location : EKM NAD) 3 Each Job
18 18 -ditto- all as per item No.16 hereinbefore but for 60 TR capacity (Location : P-35 NAD) 3 Each Job
19 19 -ditto- all as per item No.16 hereinbefore but for 30 TR capacity (Location :P-78 NAD) 2 Each Job
20 20 -ditto- all as per item No.16 hereinbefore but for 30 TR capacity (Location MAGZINE & AWS NAD) 3 Each Job
21 21 -ditto- all as per item No. 16 hereinbefore but for 60 TR capacity (Location : 31 WEU THANE) 3 Each Job
22 22 Re-winding of 100 HP capacity compressor/ pump electric motor 3 phase, 50Hz, 415 Volts of pump set complete all as specified and directed. \nNOTES: The quoted rates shall also be deemed to include the following elements:-\n(a) Disconnecting & removing the electric motor from installed position including loading, unloading and transporting to approved workshop.\n(b) Dismantling the existing burnt winding from the motor including winding with new super enamelled copper winding wire of existing gauge, also including provision of all insulating material such as insulation paper, sleeves, tape, varnish etc complete in all respects for class ’F’ insulation.\n(c) Transporting the motor back to the location, reinstalling in original position including making alignment, electric connection etc complete, commissioning and testing for 8 hours continuously to check the RPM to the satisfaction of Engineer-in-Charge. (Note : Any damage caused during handling and rewinding etc will be made good by the contractor at his own cost).\n(d) The existing motors are installed at , NAD Mine Workshop 1 Each Job
23 23 -ditto- all as per item No. 22 above but 40 HP capacity motor 1 Each Job
24 24 -ditto- all as per item No. 22 above but 20/25 HP capacity motor 2 Each Job
25 25 -ditto- all as per item No.22 above but 10 /15 HP capacity motor. 2 Each Job
26 26 -ditto- all as per item No. 22 above but 7.5 HP capacity Motor. 2 Each Job
27 27 -ditto- all as per item No. 22 above but 5/3 HP capacity Motor. 2 Each Job
28 28 Supply and fix in repairs automatic capacity control pilot solenoid valve suitable for the liquid line of AC Plants of various capacity complete all as specified and directed, Make :- Rotex, Avcon, SPORLAN, DANFOSS. 3 Each Job
29 29 M & L for thermal insulation over 150mm bore chiller water piping with 50mm thick fibre glass wool, crown 150 and of density 24 Kg/Cum, the glass wool shall be covered with and including 24 SWG aluminium sheet cladding, complete all as specified and directed, Make: Lloyd's / TWIGA/ FGP Ltd. 20 RM
30 30 -Dittio- all as per item No. 29 above but over 80mm bore chiller water piping 20 RM
31 31 -Dittio- all as per item No. 29 above but over 50mm bore chiller water piping 20 RM
32 32 Dismantling of Monoblock pump of under mentioned capacities from connected suction/delivery pipes and electric connections etc, taking to workshop, overhauling of the same and replacing unserviceable spares/parts/components, cleaning of impeller, greasing reassembling, bringing providing paking necessary nuts & bolts etc and reconnecting, recommissioning and testing for smooth functioning.\n(Notes: Cost of all the elements (material cost as well as labour cost) for making the pumps completely functional except the following shall be deemed to be included in the quoted ratess:\n
33 32.01 40 HP Capacity 1 Each Job
34 32.02 20/25 HP Capacity 2 Each Job
35 32.03 10 /15HP Capacity 2 Each Job
36 32.04 5/7.5 HP Capacity 2 Each Job
37 33 Supply only following spares /components/parts for monoblock pump set all as specified and directed :-
38 33.01 Gun metal bushes for 40 HP capacity 1 Each Job
39 33.02 Gun metal bushes for 20/25 HP capacity 2 Each Job
40 33.03 Gun metal bushes for 10 /15HP capacity 2 Each Job
41 33.04 Gun metal bushes for 5/7.5 HP capacity 2 Each Job
42 33.05 Gland packing set for 40 HP capacity 1 Each Job
43 33.06 Gland packing set for 20/25 HP capacity 2 Each Job
44 33.07 Gland packing set for 10 /15HP capacity 2 Each Job
45 33.08 Gland packing set for 5/ 7.5HP capacity 2 Each Job
46 33.09 Bearing for 7.5 HP capacity\nMake : SKF, TATA, NBC 2 Each Job
47 33.1 Bearing for10 HP capacity\nMake : SKF, TATA, NBC 2 Each Job
48 33.11 Water seal packing for 7.5 HP capacity 2 Each Job
49 33.12 Water seal packing for 10 HP capacity\nNote : The quantity of item Nos 33.01 to 33.12 shall be operated only to the extent required replacement for Pumps under item Nos. 32.01 to 32.04 here-in-before. These shall be of makes as specified and in case, makes are not mentioned in these tender documents, the same shall be as per the existing and shall be suitable for the pumps under item Nos 32.01 to 32.04 all as directed and approved by the GE. 2 Each Job
50 34 Taking down AC Plant compressor reciprocating type model SMC-4-100 of ACCEL Make by dismantling complete assembly, after pumping down refrigerant R-22,overhauling the compressor including replacement of unserviceable spares, also including machining of crank shaft bearing, polishing, replacing of gaskets packing, reassembly and recharging of pumped down Refrigerant, also charging of additional refrigerant upto the required pressure & topping up if required to maintain the required standing charged pressure of compressor oil, testing for smooth functioning etc, complete all as specified and directed. \nLocation : EKM workshop\n(Note: Cost of all the elements (material cost as well as labour cost) for making the compressors completely functional except the following shall be deemed to be included in the quoted rates :\n(a) Supply only spares included under item Nos 35.01 to 35.18 here-in-after.\n(b) Supply only additonal refrigerant required for recharging of pumped down refrigerant, if required. \n(c) Supply only compressor oil for topping up, if required. 1 Each Job
51 35 Supply only following spares for compressor reciprocating type model SMC- 4-100, Make : ACCEL :
52 35.01 Crank shaft duly remetalised, grinded, polished and made to size to match with the existing, Cat No. F-7713 1 Each Job
53 35.02 Piston Cat No. F-6503 5 Each
54 35.03 Piston Oil rings Cat No.F-6523 8 Each Set
55 35.04 Main sealing bearing (Set of two) Cat No. F-7276 2 Each Set
56 35.05 Liner assembly Cat No. F-7167 8 Each
57 35.06 Oil pump assembly Cat No. F-6501 1 Each
58 35.07 Rocker arm Cat No. F-7166 14 Each
59 35.08 Loader/unloader spring Lock Cat No. F-7277 11 Each Set
60 35.09 Piston sleeves bushing with collar, Cat No. F-7165 7 Each
61 35.1 Suction valve reeds Cat No. F-8162 8 Each
62 35.11 Discharge valve reeds Cat No. F-6504 8 Each
63 35.12 Oil filter Cat No. F-7796 1 Each
64 35.13 Suction Filter Cat No. F-7167 2 Each
65 35.14 Oil pressure regulating valve Cat No. F-6507 1 Each
66 35.15 Connecting rod bearing Cat No. F-7164 4 Each
67 35.16 Gasket set of make Neopene or equivalent as appoved by the GE 2 Each Set
68 35.17 Compressor safety valve Cat No. F-7278 1 Each
69 35.18 Shaft seal assembly, Cat No. F-7646\n 1 Each
70 36 Taking down AC Plant compressor reciprocating type model SMC- 8-100 of ACCEL Make by dismantling complete assembly after pumping down refrigerant R-22,overhauling the compressor including replacement of unserviceable spares, also including machining of crank shaft bearing, polishing, replacing of gaskets packing, reassembly and recharging of pumped down Refrigerant, also charging of additional refrigerant upto the required pressure & topping up if required to maintain the required standing charged pressure of compressor oil, testing for smooth functioning etc, complete all as specified and directed. \nLocation : MISSAR MINE NAD\n(Note: Cost of all the elements (material cost as well as labour cost) for making the compressors completely functional except the following shall be deemed to be included in the quoted rates :\n(a) Supply only spares \n(b) Supply only additonal refrigerant required for recharging of pumped down refrigerant, if required. \n(c) Supply only compressor oil for topping up, if required. 1 Job
71 37 Supply only following spares for compressor reciprocating model SMC- 8-100, Make : ACCEL :
72 37.01 Crank shaft duly remetalised, grinded, polished and made to size to match with the existing, Cat No. F -7803 1 Each Job
73 37.02 Piston Cat No. V5124A 4 Each
74 37.03 Piston Oil rings Cat No.V5485 8 Each Set
75 37.04 Main sealing bearing (Set of two) Cat No. F-7276 2 Each Set
76 37.05 Liner assembly Cat No. F-7167 8 Each
77 37.06 Oil pump assembly Cat No. F-6501 1 Each
78 37.07 Rocker arm Cat No. F-7166 14 Each
79 37.08 Loader/unloader spring Lock Cat No. F-7277 11 Each Set
80 37.09 Piston sleeves bushing with collar, Cat No. F-7165 7 Each
81 37.1 Suction valve reeds Cat No. F-8162 8 Each
82 37.11 Discharge valve reeds Cat No. F-6504 8 Each
83 37.12 Oil filter Cat No. F-7796 1 Each
84 37.13 Suction Filter Cat No. F-7167 2 Each
85 37.14 Oil pressure regulating valve Cat No. F-6507 1 Each
86 37.15 Connecting rod bearing Cat No. F-7164 4 Each
87 37.16 Gasket set of make Neopene or equivalent as appoved by the GE 1 Each Set
88 37.17 Compressor safety valve Cat No. F-7278 1 Each
89 37.18 Shaft seal assembly, Cat No. F-7646\nNote : The quantity of item Nos 37.01 to 37.18 shall be operated only to the extent required replacement for compressors under item No. 36.00 here-in-before. Unless othewise specified in the BOQ, these shall be of make ACCEL & of mentioned Cat No in the BOQ and shall be suitable for the compressors under item No 36.00 all as directed and approved by the GE. 2 Each
90 38 Taking down AC Plant compressor reciprocating type model SMC-6-65 Make ACCEL by dismantling complete assembly after pumping down refrigerant R-22,overhauling the compressor including replacement of unserviceable spares, also including machining of crank shaft bearing, polishing, replacing of gaskets packing, reassembly and recharging of pumped down Refrigerant, also charging of additional refrigerant upto the required pressure & topping up if required to maintain the required standing charged pressure of compressor oil, testing for smooth functioning etc, complete all as specified and directed. \nLocation :P-78 NAD \n(Note: Cost of all the elements (material cost as well as labour cost) for making the compressors completely functional except the following shall be deemed to be included in the quoted rates :\n(a) Supply only spares\n(b) Supply only additonal refrigerant required for recharging of pumped down refrigerant, if required. \n(c) Supply only compressor oil for topping up, if required. 1 Each
91 39 Supply only following spares for compressor reciprocating model SMC-6-65 Make ACCEL
92 39.01 Crank shaft duly remetalised, grinded, polished and made to size to match with the existing, Cat No. F -7803 1 Each Job
93 39.02 Piston Cat No. V5124A 4 Each
94 39.03 Piston Oil rings Cat No.V5485 8 Each Set
95 39.04 Main sealing bearing (Set of two) Cat No. F-7276 2 Each Set
96 39.05 Liner assembly Cat No. F-7167 8 Each
97 39.06 Oil pump assembly Cat No. F-6501 1 Each
98 39.07 Rocker arm Cat No. F-7166 14 Each
99 39.08 Loader/unloader spring Lock Cat No. F-7277 11 Each Set
100 39.09 Piston sleeves bushing with collar, Cat No. F-7165 7 Each
101 39.1 Suction valve reeds Cat No. F-8162 8 Each
102 39.11 Discharge valve reeds Cat No. F-6504 8 Each
103 39.12 Oil filter Cat No. F-7796 1 Each
104 39.13 Suction Filter Cat No. F-7167 1 Each
105 39.14 Oil pressure regulating valve Cat No. F-6507 1 Each
106 39.15 Connecting rod bearing Cat No. F-7164 4 Each
107 39.16 Gasket set of make Neopene or equivalent as appoved by the GE 1 Each Set
108 39.17 Compressor safety valve Cat No. F-7278 1 Each
109 40 S & F in repairs HP/LP/OP sensor swtiches all as specided and driected Make Indofoss / danfoss 5 Each
110 41 S & F in repairs pressure gauges HP/LP/OP of following capacities etc. complete with all accessories, as specified and directed, Make : PENN / INDOFOSS / RANCO / DANFOSS / JOHNSON \n
111 41.01 0-30 Kg/ cm2 3 Each Job
112 41.02 0-12.5Kg/ cm2 3 Each Job
113 41.03 0 to 16kg./cm2 3 Each Job
114 42 Supply and fix in replacement single phase preventer, type SPPR Type SZ 5 (7 Wire), 380V suitable for existing panel board for AC Plant, complete all as specified and directed, (Make L&T / SIEMENS). 3 Each
115 43 S & F in replacement unserviceable worn out 'V' belt of model A-50 of make Fenner or equivalent in Nirlon/Dunlop as approved by the GE for Compressor / AHU etc. complete all as specified and directed. 2 Each
116 44 S & F in replacement unserviceable worn out 'V' belt of model B-65of make Fenner or equivalent in Nirlon/Dunlop as approved by the GE for Compressor/ AHU etc. complete all as specified and directed. 2 Each
117 45 S & F in replacement unserviceable worn out 'V' belt of model B-2760 of make Fenner or equivalent in Nirlon/Dunlop as approved by the GE for Compressor/ AHU etc. complete all as specified and directed. 2 Each
118 46 S & F in replacement unserviceable worn out 'V' belt of model A-32 of make Fenner or equivalent in Nirlon/Dunlop as approved by the GE for Compressor/ AHU etc. complete all as specified and directed. 3 Each
119 47 S & F in replacement unserviceable worn out 'V' belt of model B-73 of make Fenner or equivalent in Nirlon/Dunlop as approved by the GE for Compressor/ AHU etc. complete all as specified and directed. 3 Each
120 48 S & F in replacement unserviceable worn out 'V' belt of model C-134 of make Fenner or equivalent in Nirlon/Dunlop as approved by the GE for Compressor/ AHU etc. complete all as specified and directed. 3 Each
121 49 S & F in replacement unserviceable worn out 'V' belt of model SPZ-1950 of make Fenner or equivalent in Nirlon/Dunlop as approved by the GE for Compressor/ AHU etc. complete all as specified and directed. 3 Each
122 50 S & F in replacement unserviceable worn out 'V' belt of model SPZ-1800f make Fenner or equivalent in Nirlon/Dunlop as approved by the GE for Compressor/ AHU etc. complete all as specified and directed. 2 Each
123 51 S & F in repairs for expansion valve suitable for AC plant of 75 TR/80TR chillar unit, comlete all as specified and directed, Make: DANFOSS / SPORLAN / RANCO. Model No :MVE-42 1 Each Job
124 52 -ditto- all as per item No. 51 above but for AC 30/40 TR chillar unit, Model no MVE-26 3 Each Job
125 53 M & L for replacement of following capacity existing unserviceable / defective ampere meter digital type of size 96 x 96mm with and including CT, complete all as specified & directed, Make : AE / ENERCON / SECURE / L&T
126 53.01 0 to 20Amps 5 Each Job
127 53.02 0 to 30Amps 5 Each Job
128 53.03 0 to 50Amps 5 Each Job
129 54 M & L for replacement of unserviceable Cooling Tower accessories i.e. Nozzelles, water inlet/out pipe and filter, fanblade, fan bulb, fan shaft, GI bolts, nuts, MS frame and ladder etc complete and refitting old PVC fills (serviceable qty shall be reused to the extent available) after cleaning with diluted HCL solution suitable for the cooling tower of 21 to 40TR of FRP Basin, complete all as specified and directed.\nNote : Extra PVC fills required to complete the job shall only be measured and paid separately as supply only to the extent required and ordered and cost of all the other elements to make the cooling towers completely functional shall be deemed to be included in the quoted rates. 1 Each Job
130 55 Pumping down the existing refrigerant from the plant of 75/80 TR capacity, carrying out the leakage testing of plant with the pressure of Nitrogen gas and monitoring for 24hrs to assess leakages, rectification of leakage by brazing & replacement of necessary gaskets wherever required, vacumizing of the plant by vaccum pump and keep-it upto 24 hours for testing and rectification of leakages if any, finally recharging of existing refrigerant gas to the plant and topping up of refrigerant if required to maintain the standard pressure etc complete including testing of the plant for smooth functioning complete all as specified & directed.\nLocation : MISSAR MINE WORKSHOP 1 Each Job
131 56 Pumping down the existing refrigerant from the plant of 60 TR capacity, carrying out the leakage testing of plant with the pressure of Nitrogen gas and monitoring for 24hrs to assess leakages, rectification of leakage by brazing & replacement of necessary gaskets wherever required, vacumizing of the plant by vaccum pump and keep-it upto 24 hours for testing and rectification of leakages if any, finally recharging of existing refrigerant gas to the plant and topping up of refrigerant if required to maintain the standard pressure etc complete including testing of the plant for smooth functioning complete all as specified & directed.\nLocation : EKM Work Shop 1 Each Job
132 57 Pumping down the existing refrigerant from the plant of 30 TR capacity, carrying out the leakage testing of plant with the pressure of Nitrogen gas and monitoring for 24hrs to assess leakages, rectification of leakage by brazing & replacement of necessary gaskets wherever required, vacumizing of the plant by vaccum pump and keep-it upto 24 hours for testing and rectification of leakages if any, finally recharging of existing refrigerant gas to the plant and topping up of refrigerant if required to maintain the standard pressure etc complete including testing of the plant for smooth functioning complete all as specified & directed, Location : P-78 at NAD and P-35 at NAD 2 Each Job
133 58 S & F in replacement loader / Unloader coil 230 Volt, 50HZ for solenoid valve suitable for compressor SMC 6-65 / 8- 65 Model, Make : ACCEL 3 Each Job
134 59 -Ditto- all as per item No. 58 above but for SMC 8-100, Make ACCEL.\n 1 Each Job
135 60 Taking down existing unserviceable Shaft Seal assembly and in lieu S & F new Shaft Seal Assembly of Make ACCEL including tear gasket, nuts, bolts, washers etc. and testing for leakage of refrigerant suitable for 75/80 TR Capacity chiller unit, Make -ACCEL, complete all as specified and directed. 2 Each Job
136 61 -ditto- all as per item No. 60 hereinabove but Shaft seal Assembly of Make -ACCEL for 30/40 TR capacity chiller unit \n 2 Each Job
137 62 S & F in replacement contactor type ML-2.0, 415Volt, 50Hz for star delta starter for motor of compressor, water pump and chiller pump etc. complete all as specified and directed, Make L & T/ Marline - Garline/ SIEMENS/ Schneider 2 Each Job
138 63 S & F in replacement contactor type ML- 3, 415Volt, 50Hzfor star delta starter for motor of compressor, water pump and chiller pump etc. complete all as specified and directed. Make L & T/ Marline - Garline/ SIEMENS/Schneider 2 Each Job
139 64 S & F in replacement contactor type ML- 6, 415Volt, 50Hz for star delta starter for motor of compressor, water pump and chiller pump etc. complete all as specified and directed. Make L & T/ Marline - Garline/ SIEMENS/Schneider 2 Each Job
140 65 Supply only PVC fills of size 600mm x 150mm x 150mm complete all as specified and directed. 25 Each
141 66 Supply only PVC fills of size 600mm x 300mm x 150mm complete all as specified and directed. 25 Each
142 67 M & L for replacement of relay for 100 HP Starter installed in Panel Board of AC Plant Installation, complete all as specified and directed, Make : L & T / SIEMENS. 1 Each Job
143 68 M & L for replacement of relay for 40 HP Starter installed in Panel Board of AC Plant Installation, complete all as specified and directed, Make : L & T / SIEMENS. 2 Each Job
144 69 M & L for replacement of relay for 20/25 HP Starter installed in Panel Board of AC Plant Installation, complete all as specified and directed, Make L&T / Siemens. 3 Each Job
145 70 M & L for replacement of relay for 10 /15 HP Starter installed in Panel Board of AC Plant Installation, complete all as specified and directed, Make L&T / Siemens. 2 Each Job
146 71 M & L for replacement of relay for 7.5/5 HP Starter installed in Panel Board of AC Plant Installation, complete all as specified and directed, Make L&T / Siemens. 2 Each Job
147 72 M & L for replacement of Timer 800 SD installed in Panel Board of AC Plant Installation, complete all as specified and directed, Make L&T or Siemens 5 Each Job
148 73 M & L for replacement of Indicator lamp RBY, 230 V, installed in Panel Board of AC Plant Installation, complete all as specified and directed, Make L&T / Siemens/C&S. 10 Each set
149 74 Replacement of unserviceable MS pipe, heavy grade of following sizes (condenser water tubing from the cooling tower area) including provision of all fittings, welding and connected works as required for smooth functioning of AC Plants, complete all as specified and directed, Make : TATA/JINDAL :-
150 74.01 150mm bore 20 RM
151 74.02 125mm bore 20 RM
152 74.03 100 mm bore 20 RM
153 74.04 80 mm bore 20 RM
154 74.05 50 mm bore 20 RM
155 75 Supply, Fabrication, Installation, Testing and Commissioning of ducting for supply/Return made out of GI steel metal 22 gauge, Zinc coated complete with all standard accessories, flanges, G I Hardware, Self Adhesive elastomeric foam gasket, support etc as per IS-655, complete all as specified and directed. 20 Sqm
156 76 M&L for duct insulation (50mm thick) with resin bonded fibre glass wool roll of density 24 Kg/Cum, with factory laminated aluminium vapour barrier, as specified and including provision of the followings :\n(a) M&L for cleaning the duct surface (to be insulated) by scrapping carefully with wire brush etc to make the surface completely free of miss-scale, dirt, dust, grease and other foreign materials, taking special care so that all duct joints are sealed against any leakage.\n(b) M&L applying rubber based adhesive CPRX compound.\n(c) M&L for sealing of all longitudinal joints and circular overlaps with and including aluminium foil tape 50mm wide, to make the insulation leakproof.\n(d) M&L for securing the insulation with and inculding mechanically fastened nylon / steel straps of size 50mm wide at maximum intervals of 1.2 metre. 20 Sqm
157 77 Suply and fix in repairs Cast Iron butterfly valve class PN-16 including flange, nuts, bolts, rubber, gaskets etc suitable for 50mm bore pipe, complete all as specified and directed. 2 Each Job
158 78 Suply and fix in repairs Cast Iron butterfly valve class PN-16 including flange, nuts, bolts, rubber, gaskets etc suitable for 80mm bore pipe, complete all as specified and directed. 2 Each Job
159 79 Suply and fix in repairs Cast Iron butterfly valve PN-16 including flange, nuts, bolts, rubber, gaskets etc suitable for 100mm bore pipe, complete all as specified and directed. 2 Each Job
160 80 Suply and fix in repairs Cast Iron butterfly valve PN-16 including flange, nuts, bolts, rubber, gaskets etc suitable for 150mm bore pipe, complete all as specified and directed. 2 Each Job
161 81 Suply and fix in repairs Cast Iron Non-return butterfly valve PN-16 including flange, nuts, bolts, rubber, gaskets etc suitable for 100mm bore pipe, complete all as specified and directed. 2 Each Job
162 82 Suply and fix in repairs Cast Iron Non-return butterfly valve PN-16 including flange, nuts, bolts, rubber, gaskets etc suitable for 150mm bore pipe, complete all as specified and directed. 2 Each Job
163 83 Supply / Fixing in repairs volt meter and ammeter after removing old volt meter. 10 Each Job
164 84 Repair/installation to 150 TR chiller after removing suction / discharge pipe line of gas / water transporting the chiller to workshop, opening both and flange of chiller, cleaning the shell side of chiller and copper tubes with fresh water, pressure testing with water, keeping chiller 24 hrs of pre testing, chocked copper tubes 3/4" 120 nos removed the existing chiller after brazing / welding closing the both end flange with new gasket after changing the nuts and bolts ,pressure testing carried out after changing the tubes, transporting the chiller to site complete with new nuts & bolts in orginal position connecting suction / discharge gas line by welding & brazing, vaccumising the system, pressure testing N2 gas if no leakage found, gas charging with required R22 Insulating the chiller nitrile rubber sheet can chiller body and suction / discharge gas pipeline in orginal position testing the system for smooth functioning all as specified & directed. AC Plants :NAD 2 Each Job
165 85 M & L for preparation of old painted / unpainted surfaces of any description, including taking out of parts / components under painting (if required) from any position / location as listed herein under and applying one coat of epoxy paint (with colour code maintained as per relevant IS) including marking with flow directions (of approved colour) complete comprsing comprssor , motor pumps, conductors , water pipe lines etc a) AC plant 2x30 TR P-78 NAD \nb) Ac Plant 3x30 TR P-35 NAD c) Ac plant 3x15TR AWS NAD d) Ac plant 3x30TR WEU thane (e) AC Plant 3 x30 TR EKM NAD 5 Job
166 86 M & L for preparation of old painted / unpainted surfaces of any description, including taking out of parts / components under painting (if required) from any position / location as listed herein under and applying one coat of epoxy paint (with colour code maintained as per relevant IS) including marking with flow directions (of approved colour) complete at a) 3 X 75 TR Missar Mine 1 Job
167 87 Supply and fixing AHU filters 10.0 micron 98% efficiency of existing suitable size for AHU after removing old unserviceable AHU filters. 24 Nos
168 88 Supply fix in repair, microprocessor suitable for water cooled chiller 60/30TR model CWCDR040 OMNT replace MPD / VPD, PLC, circuit wiring if faulty make microprocessor with display functional in auto tempreature stage, suction pressure / discharge pressure, CHW out temp after testing complete. 2 Each Job
169 89 S & F in repairs for expansion valve suitable AC 40 TR chillar unit, Make Danfoss Location Rukami 1 Each
170 90 Supply and fixing filter dryer core after removing old U/s filter dryer core, Make: DANFOSS 12 Each
171 91 Excavation in trenches not exceeding 1.5 Mtr wide and not exc 1.5 Mtr depth for taking out pipe/laying of pipe and getting out in any type of soil. 44.28 Cum
172 92 Returning, Filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm. deep as in hard/dense soil . 43.0105 Cum
173 93 Removing excavated material not exc 50 Mtr and depositing where directed at a level not exc 1.5 Mtr above the starting point in soil including spreading in low lying area . 1.2695 Cum
174 94 Material and labour for Plain cement concrete 1:4:8 type D-2 using 40 mm graded stone aggregate in foundation all as specified and as directed. 16 Cum
175 95 Taking up or down steel water tubing and connections including cleaning, cutting out damaged/wornout ends etc. complete all as specified and directed for the following bores.
176 95.01 (a) 50 mm 60 RM
177 95.02 (b) 80 mm 48 RM
178 95.03 (c) 100 mm 36 RM
179 96 Taking up or down MS pipes and connections including cleaning, cutting out damaged/wornout ends etc.complete all as specified and directed for the following bores.
180 96.01 (a) 100 mm 96 RM
181 96.02 (b) 150 mm 135 RM
182 96.03 (c) 200 mm 158 RM
183 97 Supply & Laying fixing, connecting and testing steel water tubing, medium grade, galvanised with screwed and socketed joints, in any length, including supply and fixing all fittings,and fixed to wall/ceiling or laid in trenches/floors and connections complete all as specified and directed for the following bores.\n
184 97.01 (i) 50 mm dia 60 RM
185 97.02 (ii) 80 mm dia 48 RM
186 97.03 (ii) 100 mm dia 36 RM
187 98 Supply, lay / fix, connect and testing mild steel ERW Class "C" grade pipes, medium grade, in any length, including supply and fixing all MS fittings like bends, tees, tapers, reducers, flanges etc. ISI marked conforming to relevant IS and fixed to walls / ceiling or laid in trenches / floors, welding joints and applying two coats of synthetic enamel paint (of approved tint as per relevant IS) over a coat of red oxide zinc chrome primer complete all as specified and as directed by the Engineer-in-charge of the following bores:\n
188 98.01 (a) 100 mm dia (bore) 96 RM
189 98.02 (b) 150 mm dia (bore) 135 RM
190 98.03 (c) 200 mm dia (bore) 158 RM
191 99 M &L for reneval of valve pit of size up to 80 cm x 80 cm x 80 cm (internal diamension), stone/brick construction including all necessary excavation and earth work in any type of soil,returning,filling in disposal of surplus soil to a distance not exceeding 50m and depositing where directed,PCC in foundation for mix(1:2:4) type D2 brick mansonary in cement mortar(1:4) rendering 12mm duck in cement mortar(1:4) internally ,finished even and fair and polishing flush externally as the work proceeds in the same mortor.Mild steel angle iron 40 x40 x6 mm frame MS sheet cover 3.15mm thick with handle and locking arrangement,painting all exposed MS work with two coats of synthetic enamel paint over a cost of red oxide primer and painting all the MS embeded in PCC with two coats of black bitumenous paint complete all as specified. 2 Each \nJob
192 100 Supply and fix in repairs fire brigade inlet connection 2 way conforming to IS 5290, 63mm dia all as specified as directed.\n\n\n 1 Each
193 101 Taking up or down MS pipes and connections including cleaning, cutting out damaged/wornout ends, etc complete all as specified and directed for the following bore :-
194 101.01 (a) 100 mm 75 RM
195 101.02 (b) 150 mm 65 RM
196 101.03 (c) 200 mm 70 RM
197 102 Refixing of serviceable pipe retrieved from item no. 101 including jointing/welding with required fittinge etc , complete all as specified and directed for the following bores.
198 102.01 (a) 100 mm 15 RM
199 102.02 (b) 150 mm 20 RM
200 102.03 (c) 200 mm 18 RM
201 103 Supply, lay / fix, connect and testing mild steel ERW Class "C" grade pipes, medium grade, in any length, including supply and fixing all MS fittings like bends, tees, tapers, reducers, flanges etc. ISI marked conforming to relevant IS and fixed to walls / ceiling or laid in trenches / floors, welding joints and applying two coats of synthetic enamel paint (of approved tint as per relevant IS) over a coat of red oxide zinc chrome primer complete all as specified and as directed by the Engineer-in-charge of the following bores:\n
202 103.01 (a) 100 mm dia (bore) 60 RM
203 103.02 (b) 150 mm dia (bore) 45 RM
204 103.03 (c) 200 mm dia (bore) 52 RM
205 104 Supply and fix 200mm sluice valve class PN1.6 as per IS-14846 and including taking out old unserviceable sluice valve complete all as per directed\nMake: Kirloskar/Kartar 1 Each
206 105 Supply and fix 150mm sluice valve class PN1.6 as per IS-14846 and including taking out old unserviceable sluice valve complete all as per directed\nMake: Kirloskar/Kartar 1 Each
207 106 Supply and fix 100mm sluice valve class PN1.6 as per IS-14846 and including taking out old unserviceable sluice valve complete all as per directed\nMake: Kirloskar/Kartar 1 Each
208 107 Supply and fix fire hose cabinet made out of 18 gauge MS sheet but not less than 800 x 600 x 250mm with double door with 4mm thick glass and door frame made out of 16 gauge MS sheet painted with two coats of synthetic enamel paint of fire red color for external faces and brilliant white for inside faces over a coat of red oxide, including taking out old unserviceable hose box complete all as per directed.\nSwati/Cease Fire/Essel 26 Each
209 108 S&F for fabricate supply and fix MS flat clamps made out mild steel of size 40 x 6 mm(confirming to Fe 290 Gde-165 ) including drilling hole, nut, bolts, washer and made to shape of required size ie, For 200 mm dia / 150 mm dia/ 100 mm dia MS pipe. 55 Kg
210 109 Supply and fix in replacement of unserviceable gun metal fire hydrant oblique type single outlet 63mm dia instantenous type 'A' conforming to IS: 5290, complete all as per directed\nMake:Swati/Cease Fire/Essel 20 Each
211 110 Supply and lay / fix fire hose reel drum, conforming to IS 884, 20mm bore and 30m long including suitable brass coupling, conforming to relevant IS, as laid / fixed in repairs in any location / position and disposing off old hose complete all as specified and as directed by the Engineer-in-charge 2 Each
212 111 S&F CP Hose 15 Meter length shall be non-percolating type conforming to IS 636, complete all as specified and as directed 10 Each
213 112 M&L for scraping cleaning surface of fire hose cabinet of any type/size internal, and preparation of entire surface and applying two coat of Synthetic enamel paint ( Red Post Office colour outside and brilliant white olour inside) including writing, marking box Nos in stencil all as directed. 30 Job
214 113 M&L for surface cleaning with wire brush, sand paper, removing dust dirt, washing with water, cleaning, drying surface and applying two coat of synthetic paint (Red Post Office) over a coat of red oxide all as directed.
215 113.01 (a) 200mm dia MS Pipe 300 RM
216 113.02 (b) 150mm dia MS Pipe 340 RM
217 113.03 (c) 100 mm dia MS Pipe 220 RM
218 113.04 (d) 63 mm fire hydrants 110 Each
219 114 M&L for repair of damaged portion of MS pipe of 200mm size by cutting the pipe and welding both internally & externally and testing for leakage complete including removing material/scrap generated during the work, both internally & externally all as specified and as directed.\nNote:(a)Rate quoted includes deployment of skilled manpower like welder, fitter, and unskilled manpower.\n(b) Contractor should provide necessary arrangement for welding /cutting equipments at site and prior permission to be taken from Engr-in-charge before starting welding works.\n(c) Excavation and earthwork will be measured and paid separately. 6 Each job
220 115 All as per item No. 114 above but for MS Pipe of capacity 150mm size 8 Each job
221 116 All as per item No. 114 above but for MS Pipe of capacity 100mm size 5 Each job
222 117 Manning and operation of water supply installation with all connected equipments, supply lines and machineries (as listed herein under) and pumps, internal and external electrification, external water supply system, sumps, overhead reservoirs, service tanks, etc with an operator / technician, operation round the clock in 03 shifts, depending upon availability of water from BMC / Mumbai Port Trust, including Sundays and holidays including routine maintenance checks and upkeeping the installation complete all as specified and as directed by the Engineer-in-charge Location: NSD Sewri \nShifts \n(i) 1st shift - 0600 to 1400hrs \n(ii) 2nd shift - 1400 to 2200hrs \n(iii) 3rd shift - 2200 to 0600hrs \nMachineries: \n(a) Pumping set 25HP - 02No. \n(b) Pumping set 20HP - 02No. \n(c) Pumping set 1.5HP - 02Nos. \n(d) Electric control panel - 01No \n(e) 50 KVA DG Set Note : - (i) Any malfunctioning noticed during the entire contract period on account of negligence of the operaters , the cost of Repair /replacement of defective parts shall be recoveredfrom any dues from the contractor. Decision of the Eng - in Charge on this subject shall be final and binding (ii)Contribution towards bonus EPF, ESIC the amount ispayble only after submission of valid and authentic document in support of having paid the requisite amount to the employed labour 11 Per month
223 118 M & L for carrying out 'B' check of DG Set 625 KVA DG Set at TS Mahul including of 'B' check kit consisting of the following under laid works complete all as specified and as directed by the Engineer-In-Charge.\nMake: M/s Kirloskar/M/s Cummins Power System India Ltd\n(i) Primary Fuel Filter - 01 Set\n(ii) Secondary Fuel Filter - 01 Set\n(iii) Oil Filter - 01 No.\n(iv) Engine oil as required (Engine oil shall be measured and paid separately)\n(v) Complete cleaning of DG Set\n(vi) Examination and rectification of engine RPM\n(vii) Monitoring of output and maintaining and adjusting speed governor\n(viii) Painting of DG sets with two coats of synthetc enamel paint of colour as directed by the Engineer-In-Charge 1 Each job
224 119 All as pere Item No 118 above But 100 KVA DG Set at Rukmani TS Mahul 1 Each job
225 120 All as pere Item No 118 above But 50 KVA DG Set at NSD Sewari 1 Each job
226 121 M & L for dismantling radiator, draining out water and coolant, cleaning, carrying out required tests for any leakage and rectifying same by bronzing / soldering as required and re-testing for no leakage, etc. and refixing the same in original position and refilling the tank with water including filling in new coolant hrough authorized agencies of the manufacturer of DG Sets complete all as specified and directed by the Engineer-In-Charge for DG Sets 625 KVA DG Set at TS Mahul.\nNote : coolent shall be measured and paid separately under respective item of Sch-'A'. 1 Each Job
227 122 All as per Item No 121 above but 100 KVA DG Set at Rukmani Ts Mahul 1 Each Job
228 123 All as per Item No 121 above but 50 KVA DG Set at NSD Sewari 1 Each Job
229 124 Supply only distilled water in sealed bottles of 1 litre capacity complete all as specifed. 50 Each
230 125 Supply only multi-grade 20 W 40 engine oil for topping upto required levels complete all as specified and as directed by the Engineer-In-Charge.\nMake : Castrol/Servo/Bharat Petroleum 300 Ltrs
231 126 Supply only coolent for engines for topping up to required levels complete all as specified and as directed by the Engineer-In-Charge.\nMake : Castrol/Servo/Bharat Petroleum 80 Ltrs
232 127 Supply and fix battery terminal, heavy duty, suitable for 92AH/180AH 12 V battery, as fixed in repairs complete all as specified and directed by the Engineer-In-Charge.\n 6 Pair
233 128 Supply and fix in replacement battery heavy duty 12 Volts 180 AH maintenance free. \nMake : Exide/Amron/Cummins 2 Each
234 129 M & L for dismantling fuel tank and draining out fuel in tank, cleaning the tank using pressure jet process, de-scaling the tank completely and refixing the tank in original position and refilling the tank with fuel retrieved on duly calibrating the same through authorised agencies of the manufacture (of DG Sets) complete all as specified and directed by the engineer - in - charge for DG sets 625 KVA DG Set at TS Mahul. 1 Each Job
235 130 All as per item No.129 above but 100 KVA DG Set at Rukmani Ts Mahul 1 Each Job
236 131 All as per item No.129 above but 50 KVA DG Set at NSD Sewari 1 Each Job
237 132 Dismantling the U/S stator exiter coil assembly from the 625 KVA engine housing transporting the same to workshop & refixing testing the same at site after the following repairs\n(i) dismantling the old U/S winding and rewinding the stator with equivalent size size of super enamalled copper wire to match the original rating & output complete with E class insulation & Lamination 1 Each Job
238 133 S & F in replacement solenoid switch for control of fuel governor, operation in 12 Volts DC supply as per existing model fixed complete all as specified and as directed by the Engineer-In-Charge. 1 Each
239 134 S & F new movable battery charger for battery charging purpose of the DG Set as a back up in case of any failure to the panel for the uninterrupted DG supply all as specified and as directed by Engineer-In-Charge. 1 Each
240 135 M & L for repair of various places Panel board of water supply installation,Relay for 25 HP Starter 1 Each
241 136 All as per Item No 135 above but Relay for 20 HP Starter 1 Each
242 137 All as per Item No 135 above but Relay for 10 HP Starter 1 Each
243 138 All as per Item No 135 above but Relay for 7.5/5 HP Starter 1 Each
244 139 All as per Item No 135 above butTimer 800 SD 1 Each
245 140 All as per Item No 135 above but Indicator lamp RBY 230 V 2 set of 3
246 141 Dismantling unsv PVC water tanks and S&F 500 litre capacity ISI marked rotational moulded polythene water storage tank with cover cylinderical vertical type clossed top hoisted and fixed in position all as specified. ( Tank Covers shall be Cast Iron casted all as per BMC approval norms and cost of the same is deemed to be included in this Item rate) Make of Tank :- Sintex / Polygon (ISI Marked ) 3 Each
247 142 All as per item No 141 above but 1000 litre capacity 3 Each
248 143 All as per item No 141 above but 2000 litre capacity 2 Each
249 144 S & F in replacement of Power contactor current rating 500A fixed complete all as specified and as directed by the Engineer-In-Charge.conform to Cat No LC1E400 of Schneider or equivalent from CG / L&T 1 Each
250 145 Supply and fix in replacement MCCB 200 Amp TP ,415 V, 25 KA fixed type, including taking down of old unsv MCCB after disconnecting existing cables and reconnecting the cabes with proper lugs and glands to new MCCB's complete all as specified and directed. Make : Schneider/Indo Asian/Havells/standard 2 Each
251 146 All as per ser item No 145 above but MCCB 100 Amp 2 Each
252 147 All as per ser item No 145 above but MCCB 63 Amp 2 Each
253 148 Earthing complete with GI steel earth plate electrode 60cm x 60cmx6.3mm thick barried directly in ground vertically to a depth not less than 2.25 metres below ground level with top edge of earth plate at a depth not less than 1.5 mtrs below level ground, connected to GI srtip 32x6mm by means of nuts, bolts checks nuts and washers made of GI iron or steel earth wire protected by GI iron pipe 40mm bore, medium grade and connected to main switch board or main control board as directed and including concrete pit in PCC (1:3:6) type C1, pre-cast RCC over slab 30cmx30cmx10cm with one lifting handle made of 8mm dia MS bar funnel wire mesh, 20mm bore GI or steel pipe medium grade for watering, charcoal or coke and salt in alternate layers, necessary excavation and earth work in any type of soil complete all as shown in electrical plate No 3 of MES schedule Part-I and testing after completion. 4 Each
254 149 Calibration and overhauling of injector assembly of 625 KVA DG Set including replacement of necessary spare parts as directed. 1 Job
255 150 Calibration and overhauling of injector assembly of 100 KVA DG Set including replacement of necessary spare parts as directed. 1 Job
256 151 Taking out of UNSV water pump assy 625 KVA Kirloskar/Cummins engine and carrying out overhauling including supply and fix water pump kit all as directed and specified. 1 Job
257 152 Taking out of UNSV water pump assy 50 KVA Kirloskar engine and carrying out overhauling including supply and fix water pump kit all as directed and specified. 1 Job
258 153 Preparing old painted surface of DG set including cleaning throughly scraping and applying two coats of synthetic enamel paint over a coat of red oxide primer using spary painting including writing SM/MES No on the body of the DG Set complete all as directed by Engr-in-Charge. 1 Job
259 154 Calibration and over hauling of PT pump with replacement of following for 100 KVA (Make : Kirloskar Cummins) DG Set :-\n(a) Throttle shaft of PT Pump.\n(b) Kit barrel and plunger.\n(c) Gasket Set.\n(d) Shim.\n(e) Washer.\n(f) Gear pump.\n(g) Seals.\n(h) Gear pump adopter\n(j) Elbow.\n(k) Cap screw.\n(l) 'O' ring.\n(m) Screen filter.\n 1 Job
260 155 Calibration and over hauling FTP or PT Pump of 50 KVA DG Set with replacement of the following parts :-\n(a) Delivery valve - 06 Nos.\n(b) Bearing - 02 Nos.\n(c) Elements - 06 Nos.\n(d) Main spring - 06 Nos.\n(e) Gasket sets.\n(f) Seal.\n(g) Cap screw.\n(h) 'O' ring - 01 Set.\n(j) Governer assembly - 01 Set.\n(k) Screen filter. 1 Job
261 156 Supply and Laying or fixing or passing through pipe, XLPE/PVC insulated, armoured heavy duty electric cable with aluminium conductor 1100 volts grade cross sectional area 50 Sqmm 3.5 core including necessary connection and providing cable lugs as required including disconnection/taking down of existing cable all as specified. \nNote : : Havells/Richa/RR Kabel 117 RM
262 157 Excavation in trenches not exc. 1.5 metre wide and not exc. 1.50 mtr depth for laying of underground cable, erection of poles etc. and getting out in soft/loose soil including separating serviceable bricks for re-use at site obtained during excavation complete all as specified and directed. 54 Cum
263 158 Returning, filling in including spreading, levelling, watering and well ramming in layers not exceeding 25cm thick complete all as specified and directed. 29.226 Cum
264 159 Removal of surplus soil not exc 50mtr distance and depositing where directed. 24.774 Cum
265 160 M&L for well burnt sub class 'B' bricks laid flat breadth wise along the length of cable for cable protection complete all as specified and directed. 1800 Each
266 161 M&L sand cushioning for protection of cable complete all as specified and directed. 16.2 Cum
267 162 Manning and operation of standby diesel generating set 625 KVA, with all connected equipments and machineries as detailed herein under with an operator / mechanic, operation round the clock in 03 shifts, including Sundays and holidays including routine maintenance checks, tests, etc and upkeeping the installation complete all as specified and as directed by the Engineer-in-charge \nLocation : TS Mahul \nShifts \n(i) 1st shift - 0600 to 1400hrs \n(ii) 2nd shift - 1400 to 2200hrs \n(iii) 3rd shift - 2200 to 0600hrs \nDetails of DG set: \n(a) Diesel engine 625kVA - 01No \n(b) Alternator - 625kVA - 01No \n(c) LT panel with 800Amps ACB, MCCBs and change over switches Note : - Any malfunctioning noticed during the entire contract period on account of negligence of the operaters , the cost of Repair /replacement of defective parts shall be recoveredfrom any dues from the contractor. Decision of the Eng - in Charge on this subject shall be final and binding (ii)Contribution towards bonus EPF, ESIC the amount ispayble only after submission of valid and authentic document in support of having paid the requisite amount to the employed labour 11 per Month
268 163 M&L for cleaning underground / semi-underground sumpsof 10,000 gal capacity by draining out sludge from bottom, by blocking all inlet/outlet, removing alge-fungi growth from wall, floor, ceiling by wire brush/ water jet pressure machine, cleaning complete surface and dis-infecting with bleaching powder all as specified and directed. 2 Each Job
269 164 All as per Item No 163 above but 20,000 gallons capacity. 4 Each Job
270 165 M & L for cleaning of over head reservoir of 20000 gal capacityby draining out water,removing sludge, alge-fungi growth from walls/floor, roof by rubbing with wire brush and disinfecting the reservoir with bleaching powder, draining out and making reservoir totally clean all as specified and directed. 1 Each Job
271 166 M & L for cleaning RCC / PVC Service Tanks upto 500 lit capacity by draining out entire water, removing sludge, mud etc, cleaning the ceilings from spider webs, mud accumulations etc., with water jets etc., brushing / rubbing with wire / nylon brush / mop to remove all algae / fungal growth and moss etc. entirely from walls, floors, etc. washing clean with fresh water by using water jets and then again washing and treating with anti - bacterial agents, disinfectants and bleaching powder, as required at site and writing in paint of approved font of size "Date of Cleaning" and "Capacity" of sumps cleaning off the surrounding complete all as specified and directed by the Engineer-in-charge following capacities: 40 Each Job
272 167 All as per item No 166 above but 501 Ltrs to 1,000 Ltrs capacity. 35 Each Job
273 168 All as per item No 166 above but 1001 Ltrs to 2,000 Ltrs capacity. 25 Each Job
274 169 All as per item No 166 above but 2001 Ltrs to 5,000 Ltrs capacity. 10 Each Job
275 170 M & L for servicing of Centrifugal pump set of capacity 25 HP by opening end covers, greasing the bearings, replacing worn out nut, bolts, gasket, air release valve key, gland stuffing box male/ female set, Rubber bush and painting one coat of synthetic enamel paint, including writing/marking in 1" size letters SM & MES No. for the following capacity of pumps:- 3 Job
276 171 All as per Item No 170 above but Pump set 20 HP 2 Job
277 172 All as per Item No 170 above but Pump set 10 HP 2 Job
278 173 All as per Item No 170 above but Pump set 5HP 2 Job
279 174 Supply and fix in replacement of fully authomatic star delta motor starter fixed in existing sheet steel enclose type ML 2 FASD-suitable for 25 HP electric motor 415 volt 50 Hz including lugs, etc and test on load complete. Make : L&T/ Crompton Greaves/ Siemens\n 2 Each
280 175 Supply and fix in replacement of old unserviceable Cast iron tank cover with MS strip /flat iron framework with all necessary fixing and locking arrangement nuts,bolts all as per BMC standards any required alteration to the tank for fixing of new CI covers all as specified and directed by the Engineer -in-Chief of sizes:- 508mm dia. (weight of tank cover not less than 12 Kgs) 38 Each
281 176 M&L for rewinding of electric motor 25 HP 3 phase 50 Hz 415 volt of following capacities complete all as directed and specified as under: (a) Disconnecitng, dismantling existing burnt widning from motor and rewinding complete with super enamled copper winding wire of matching gauge including all insulation material such as PVC insulated sheet, cotton tape sleeves varnish etc. (b) Transporting electric motor including loading/ unloading upto wksp and back to site. (c) Re-installing the same at the orignal locaition with proper alignmenent connecting and testing on load. (d) Replacement 2 Nos ball bearing for each motor of existing size/model. Make- SKF/NBC/TATA. (e) Replacement of winding terminal plate with brass stus,/ nut, bolt washer. 1 Job
282 177 All as pere Item No 176 for Motor 20 HP Cap 1 Job
283 178 All as pere Item No 176 for Motor 10 HP Cap 1 Job
284 179 All asper Iem NO 176 above but for Motor 5 HP cap NOTE: Quoted rates shall be deemed to include one year warranty for motors after rewinding and commissioning. 1 Job
285 180 S&F the following component in existing LT Panel Boards including disconnecting and taking down at different locations all as directed :-
286 181 Voltmeter Digital type ,0-500 Volts of size 96x96mm. 16 Each
287 182 Ammeter Digital type of 400 amps capacity of size 96X96mm. 10 Each
288 183 Selector switch for voltmeter / Ammeter. 10 Each
289 184 Phase indicating lamp neon type complete with holder assy RYB 25 Each
290 185 CT coils any capacity. 20 Set of three
291 186 Supply and fix brass water meter of 150 mm class B flange type size all as specified and as directed. 1 Each
292 187 Supply and fix brass water meter of 50 mm class B flange type size all as specified and as directed. 1 Each
293 188 Supply only calcium based white chlorination chemical AQUAAFIT in sealed containers complete all as specified. 135 Kg
294 189 Drilling and taping cast iron water mains (in position) for branch connections 15 mm bore of the internal dia. 6 Each
295 190 -Ditto- all as per item No 189 above but 20mm bore 6 Each
296 191 Taking up or down steel water tubing 15 mm bore and connections including cleaning for re-fixing or removal. 50 RM
297 192 -Ditto- all as per item No 191 above but 20mm bore 25 RM
298 193 -Ditto- all as per item No 191 above but 25mm bore 30 RM
299 194 -Ditto- all as per item No 191 above but 40mm bore 15 RM
300 195 -Ditto- all as per item No 191 above but 50mm bore 15 RM
301 196 M & L for preparation of old painted / unpainted surfaces of any description, including taking out of parts / components under painting (if required) from any position / location as listed hereinunder and applying one coat of epoxy paint (with colour code maintained as per relevant IS) including marking with flow directions (of approved colour) complete al as specified and as directed by the Engineer-In-Charge.\n(a) Induction motors 25 HP/20 HP - 06 Nos.\n(c) Electric motors 10/7.5 HP - 03 No.\n(d) Sluice valve 100 mm dia. - 06 Nos.\n(e) Sluice valve 80 mm dia. - 06 Nos.\n(f) Electric Panel Board - 04 Nos 1 Each Job
302 197 S & F foot valve of 150 mm bore, in cast iron body, ball type, with flanged and drilled ends and synthetic rubber coated MS ball, conformimg to relevant IS, ISI marked, including all joints, gaskets, bolts and nuts, washers, including taking up/down old unserviceable valves from any position and any addition/alteration for fixing required complete all as specified and directed by the engineer in charge. 1 Each
303 198 All as per item No 197 above but 80mm bore 1 Each
304 199 M&L for dismantling existing unserviceable sluice valve and supply and fix new sluice valve ISI marked IS-14846 PN 1.6 with iron operating wheel, flanged type rubber gasket, nut, bolts, washers, including any addition alteration. Fixing of new sluice valve of size 100 mm bore. Make:Leader,Venus,Kirloskar,Kajariwal Upadhyaya Valves,Indian Valves,L&T. 2 Each
305 200 M&L for dismantling existing unserviceable sluice valve and supply and fix new sluice valve ISI marked IS-14846 PN 1.6 with iron operating wheel, flanged type rubber gasket, nut, bolts, washers, including any addition alteration. Fixing of new sluice valve of size 80 mm bore. Make:Leader, Venus, Kirloskar, Kajariwal Upadhyaya Valves, Indian Valves,L&T. 2 Each
306 201 M & L for valve chamber of size 900 X 900 X 900 mm including necessary earth work in any type of soil, PCC foundation C-2 1:3:6 in base concrete, brick work in CM 1:6 with 10 mm thick plaster internally and 15 mm thick externally in CM 1:4, 6 mm thick MS cover with hinges and locking arrangement fixed to angle iron frame made-out of 40 X 40 X 6 mm MS angles complete with 2 coats of synthetic enamel paint over one coat of red oxide zinc chrome primer on all metal works including dosmantling the existing valve chamber complete all as specified and directed by EIC. 3 Each Job
307 202 Supply, lay/fix, connect and testing steel water tubing, 25 MM medium grade, galvanised with screwed and socketed joints, in any length, including supply and fixing all fittings, ISI marked conforming to IS-1239 and fixed to wall/ceiling or laid in trenches/floors including taking up/down existy tubinging and connections complete all as specified and directed by the Engineer-in-Charge. Make - TATA, Swastik, Jindal, Prakash, Surya\n\n 60 RM
308 203 All as per item No 202 above but of 50 mm bore. 60 RM
309 204 All as per item No 202 above but of 80mm bore. 80 RM
310 205 All as per item No 202 above but of 100mm bore. 45 RM
311 206 S&F in repairs GM gate valve ISI marked IS-778 screwed down for iron pipe or ferrule including fittings such as union check nut etc of size 50mm. Make;- Leader/Neeta/ Guru including any addition/alteration and fittings like union, check nut etc 15 Each
312 207 All as per item No. 206 above but of size 25mm dia. 10 Each
313 208 Supply and Laying or fixing or passing through pipe, XLPE/PVC insulated, armoured heavy duty electric cable with aluminium conductor 1100 volts grade cross sectional area 10 Sqmm 2 core including necessary connection and providing cable lugs as required including disconnection/taking down of existing cable all as specified. Make : : Havells/Richa/RR Kabel 50 RM
314 209 Excavation in trenches not exc 1.5M wide /n.exc 10 Sqm on plan and not exc 1.5M in depth for laying GI pipe etc and getting out in hard / dense soil. 35 Cum
315 210 Returning, filling, including spreading leveling, watering and well ramming in layers not exc 25cm in soil. 27 Cum
316 211 Removing excavated Soill not exc 50M and depositing where directed at a level not exc 1.5M above the starting point all as specified & directed. 6 Cum
317 212 M&L for cement concrete in foundation, filling and mass concrete (1:4:8) type D2 using 40mm graed stone aggregate 1 Cum
318 213 Replacement of unserviceable ball (float) valve , supply and fix new brass ball valves 25 mm bore, high pressure with polythene float and fly nuts complete screwed to iron/ GI pipe or brass ferrule including necessary CI fitting such as nipple check nut, reducer elbow sockets etc as required for the following size. 20 Each
319 214 All as per Item No 213 above but 40 mm bore 10 Each
320 215 All as per Item No 213 above but 50 mm bore 8 Each
321 216 Supply & fixing in repairs chiller water sensors in various AC plant 6 Each
322 217 Material and labour for Plain cement concrete 1:4:8 type D-2 using 40 mm graded stone aggregate in foundation all as specified and as directed. 16 Cum
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail