Removal , Supply , Installation , Testing And Handover At Site Of Forced Ventilation System For Augmentation Of Energy Block Extension At Nd ( V ) , ( A ) Supply Blower / Air Intake System , Supply And Installation Of 25 In Nos ( 10Ftx10ftx2ft ) Air Filter With Ss Frame And Washable Electrostatic Filters As Specified In Para 1 ( A ) ( I ) Of Part Ii Of Rfp , Supply And Install And Commissioning Of 25Hp Motor , 3000 Rpm , Floor Mounted , Flame Proof Along With 4 Blade Grp Impeller ( Qty- 2 ) With Trunking For Functioning As Supply Blower As Specified In Para 1 ( A ) ( Ii ) Of Part Ii Of Rfp , Supply , Install And Cabling From Starter To Motor , 04 Core , Copper Conductor , 16 Sq . Mm , Approx Length 20 Mtrs And Cabling From Panel To Starter , 04 Core , Copper Conductor , 35 Sq . Mm , Approx Length 10 Mtrs As Specified In Para 1 ( A ) ( Iii ) Of Part Ii Of Rfp , Replacement Of Existing Gi Trunking At Blower End With Frp Trunking As Specified In Para 1 ( A ) ( Iv ) Of Part Ii Of Rfp , Replacement Of Existing Gi Elbow With Frp Elbow As Specified In Para 1 ( A ) ( V ) Of Part Ii Of Rfp , Replacement Of Existing Gi Trunking Running Above Eot Crane Along Width Of Battery Charging Room With Frp Trunking As Specified In Para 1 ( A ) ( Vi ) Of Part Ii Of Rfp , Replacement Of Existing Gi Trunking Running Above Eot Crane Running Along Length Of Wall Inside Battery Charging Room With Frp Trunking As Specified In Para 1 ( A ) ( Vii ) Of Part Ii Of Rfp , Replacement Of Existing Gi Elbow With Frp Elbow As Specified In Para 1 ( A ) ( Viii ) Of Part Ii Of Rfp , Replacement Of Supply Trunking For Outside Wall Arrangement With Frp Elbow As Specified In Para 1 ( A ) ( Ix ) Of Part Ii Of Rfp , Replacement Of Elbow For Final Discharge With Frp Elbow As Specified In Para 1 ( A ) ( X ) Of Part Ii Of Rfp , Replacement Of Wire Mesh With Pvc Coated Wire Mesh For Air Inlet To Charging Hall As Specified In Para 1 ( A ) ( Xi ) Of Part Ii Of Rfp , Services Including Staging , Lifting Devices , Transportation And Other Requirement Including Installation & Commissioning As One Work As Specified In Para 1 ( A ) ( Xii ) Of Part Ii Of Rfp , ( B ) Fume Exhaust / Exhaust System , Replacement Of Existing Gi Air Exhaust Trunking With Top Cover / Canopy To Protect From Rain Water Till Exhaust Blower By Frp Material As Specified In Para 1 ( B ) ( I ) Of Part Ii Of Rfp , Replacement Of Existing Gi Elbow With 8 Mm Thick ( Marine Grade ) Frp Elbow To Connect Exhaust Trunking To Exhaust Blower As Specified In Para 1 ( B ) ( Ii ) Of Part Ii Of Rfp , Replacement Of Blower Assembly Motor With Two In Nos . 25 Hp Electric Motors , 415 V , 50 Hz , 3 Phase As Specified In Para 1 ( B ) ( Iii ) Of Part Ii Of Rfp , Supply , Install And Cabling From Starter To Motor , 04 Core , Copper Conductor , 16 Sq . Mm , Approx Length 20 Mtrs And Cabling From Panel To Starter , 04 Core , Copper Conductor , 35 Sq . Mm , Approx Length 10 Mtrs As Specified In Para 1 ( B ) ( Iv ) Of Part Ii Of Rfp , Replacement Of Combined Gi Exhaust Trunking Of Both Blowers With 8 Mm Frp Trunking As Specified In Para 1 ( B ) ( V ) Of Part Ii Of Rfp , Replacement Of Gi Trunking From Exhaust Blower To Battery Charging Room With Frp Trunking As Specified In Para 1 ( B ) ( Vi ) Of Part Ii Of Rfp , Replacement Of Gi Trunking Inside Battery Charging Room Running Along The Width Of Room And Divided Into 4 Exhaust Sections With Frpm Trunking As Specified In Para 1 ( B ) ( Vii ) Of Part Ii Of Rfp , Replacement Of Gi Trunking Running Above Battery Charging Station Along The Length Of Room With Frp Trunking As Specified In Para 1 ( B ) ( Viii ) Of Part Ii Of Rfp , Replacement Of Supporting Hangers 12 Each Of 4 Fts Length As Specified In Para 1 ( B ) ( Ix ) Of Part Ii Of Rfp , Clamps & Brackets Material Of Ms Of Various Sizes For Support Of Trunkings As Specified In Para 1 ( B ) ( X ) Of Part Ii Of Rfp , Renewal Of Gi Trunking From Load Bank Room To Outside Room Of Frp Material As Specified In Para 1 ( B ) ( Xi ) Of Part Ii Of Rfp , Securing Brackets And Angles Of Material Ms With Frp Coating As Specified In Para 1 ( B ) ( Xii ) Of Part Ii Of Rfp , Services Inclusive Of Staging , Lifting Devices , Transport And Other Equipment Required To Undertake The Work Including Installation And Commissioning As One Work As Specified In Para 1 ( B ) ( Xiii ) Of Part Ii Of Rfp , Standard Accessories , If Any ( Refer To Para 7 Of Part Ii ) , Two Years Operation & Maintenance Spares , If Any ( Refers To Para 8 Of Part Ii ) , Special Maintenance Tools And Test Equipment , If Any ( Refers To Para 9 Of Part Ii ) , Technical Literature / Certificates / Documentation , If Any ( Refers To Para 10 Of Part Ii ) , Acceptance , Testing , Trials And Commissioning Charges , If Any ( Refers To Para 11 Of Part Ii ) , Training , If Any ( Refers To Para 13 Of Part Ii ) , Any Other Item Such As Transportation , Insurance , Freight , Packing Etc