| 1 | 1 | Construction of Retaining Wall at Location 13/400 KM length =40.00 mts | | | |
|---|
| 2 | 2 | Excavation of soil by manual.Earth work excavation for foundation of structure as per drawing and tech.specification | | 192 | cum |
|---|
| 3 | 3 | Dry rubble Flooring | | 5.6 | cum |
|---|
| 4 | 4 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specification | | 5.6 | cum |
|---|
| 5 | 5 | Stone masonry work in cement mortar 1:3 for substructure complete as drawing and Technical Specification | | 105.6 | cum |
|---|
| 6 | 6 | Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification | | 60 | cum |
|---|
| 7 | 7 | Construction of cattle trap at location 14/600 Km on NH-02 | | | |
|---|
| 8 | 8 | Earthwork in excavation of foundation of structures as per drawing and technical specification etc complete | | 30 | cum |
|---|
| 9 | 9 | Plain/reinforced cement concrete in foundation complete as per drawing and technical specifications PCC M15 Grade | | 3 | cum |
|---|
| 10 | 10 | Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical Specification | | 5.77 | cum |
|---|
| 11 | 11 | Plain/Reinforced Cement Concrete in sub-structure complete as per drawing and technical specification PCC M20 Grade | | 2.83 | cum |
|---|
| 12 | 12 | I Sectoin 100 mm Depth @ 18 Kg/1 m Length) | | 884 | kg |
|---|
| 13 | 13 | Construction of Breast Wall With Side Drain at Location 18/500 KM Length =45.00 mts | | | |
|---|
| 14 | 14 | Excavation of soil by manual.Earth work excavation for foundation of structure as per drawing and tech.specification | | 227.7 | cum |
|---|
| 15 | 15 | Dry rubble Flooring | | 9.45 | cum |
|---|
| 16 | 16 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specification | | 9.45 | cum |
|---|
| 17 | 17 | Stone masonry work in cement mortar 1:3 for substructure complete as drawing and Technical Specification | | 116.77 | cum |
|---|
| 18 | 18 | Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification | | 67.5 | cum |
|---|
| 19 | 19 | C Construction of Breast Wall at Location 19/5000 KM length =45.00 mts | | | |
|---|
| 20 | 20 | Excavation of soil by manual.Earth work excavation for foundation of structure as per drawing and tech.specification | | 189 | cum |
|---|
| 21 | 21 | Dry rubble Flooring | | 6.3 | cum |
|---|
| 22 | 22 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specification | | 5.4 | cum |
|---|
| 23 | 23 | Stone masonry work in cement mortar 1:3 for substructure complete as drawing and Technical Specification | | 92.81 | cum |
|---|
| 24 | 24 | Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification | | 28.125 | cum |
|---|
| 25 | 25 | Construction of H/P culvert (1000 mm dia Hume Pipe Culvert ) Height of Head wall 10.00m Length 15.00m Location 19/500km | | | |
|---|
| 26 | 26 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides) | | 197.29 | cum |
|---|
| 27 | 27 | Plain/reinforced cement concrete in foundation complete as per drawing and technical specifications PCC M15 Grade | | 6.594 | cum |
|---|
| 28 | 28 | Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications Coursed rubble masonry (first sort ) | | 41.25 | cum |
|---|
| 29 | 29 | Bedding for Pipe\n Plain/reinforced cement concrete in foundation complete as per drawing and technical specifications | | 11.6994 | cum |
|---|
| 30 | 30 | Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications Coursed rubble masonry (first sort ) | | 1 | cum |
|---|
| 31 | 31 | Laying Reinforced Cement Concrete Pipe NP4/prestrssed concrete pipe on first class bedding in single row . (Laying Reinforced cement concrete pipe NP4/prestrssed concrete pipe for culverts on first class bedding of granular material in single row) 1000 mm dia. | | 15 | m |
|---|
| 32 | 32 | Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification Granular material | | 56.9834 | cum |
|---|
| 33 | 33 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides)I. Manual Means - Soil (Upto 3 m depth) | | 2.74 | cum |
|---|
| 34 | 34 | Plain/reinforced cement concrete in foundation complete as per drawing and technical specifications | | 0.39 | cum |
|---|
| 35 | 35 | Stone masonry work in cement mortar 1:3 in sub structure complete as drawing and Technical Specification | | 0.96 | cum |
|---|
| 36 | 36 | Plain/reinforced cement concrete in foundation complete as per drawing and technical specifications | | 0.6 | cum |
|---|
| 37 | 37 | Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical Specification Random Rubble Masonry | | 2 | cum |
|---|
| 38 | 38 | Plain/reinforced cement concrete in sub-structure complete as per drawing and technical specificationsPCC M20 | | 6 | cum |
|---|
| 39 | 39 | Construction of Breast Wall With Side Drain at Location 19/900 KM Length =40.00 mts | | | |
|---|
| 40 | 40 | Excavation of soil by manual.Earth work excavation for foundation of structure as per drawing and tech.specification | | 202.4 | cum |
|---|
| 41 | 41 | Dry rubble Flooring | | 8.4 | cum |
|---|
| 42 | 42 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specification | | 8.4 | cum |
|---|
| 43 | 43 | Stone masonry work in cement mortar 1:3 for substructure complete as drawing and Technical Specification | | 103.8 | cum |
|---|
| 44 | 44 | Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification | | 60 | cum |
|---|
| 45 | 45 | Construction of Retaining Wall at Location 20/300 KM length =20.00 mts | | | |
|---|
| 46 | 46 | Excavation of soil by manual.Earth work excavation for foundation of structure as per drawing and tech.specification | | 56 | cum |
|---|
| 47 | 47 | Dry rubble Flooring | | 2.8 | cum |
|---|
| 48 | 48 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specification | | 2.8 | cum |
|---|
| 49 | 49 | Stone masonry work in cement mortar 1:3 for substructure complete as drawing and Technical Specification | | 51.42 | cum |
|---|
| 50 | 50 | Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification | | 30 | cum |
|---|
| 51 | 51 | Clearing and grubbing Road land.(Clearing and grubbing road land including uprooting rank vegetation grass,bushes, shrubs,saplings and trees girth upto 300mm,removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be used or auctioned up to a lead of 1000metres including removal and disposal of top organic soil not exceeding 150mm in thickness). \nKm 3.500 to Km 40.000 of NH-2 | | 6.685 | Hec |
|---|
| 52 | 52 | Hill side Drain clearance.(Removal of earth from the choked hill sidedrain and disposing it on the valley side manually)\nKm 3.500 to Km 40.000 of NH-2 | | 9380 | m |
|---|