Bharat Coking Coal Limited-BCCL has published Hiring Of Hemm For Removal Of Ob , Extraction And Transportation Of Coal ( Including Crushing ) With Firefighting From Khudia , Palasia , Gp Top , Gp Bottom , Bp Top , Bp Bottom And Kalimati Seam At Patch-B Of Basantimata-Dahibari Colliery , Cv A. Submission Date for this Tender is 20-01-2021. Explosives Tenders in CMC DEPARTMENT,BCCL HQ Jharkhand. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 04-Jan-2021 | Clause Related Corrigendum | Other | 20-01-2021 |
Name of Work: NIT No: | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Excavation in benches (In-Situ) by mechanical means at any depth in all kinds of soil, rock, including mixed soil, mixed hard soil i.e. clay soils mixed with pebbles / laterite / stone boulders, soft or hard rock etc., removal of slushy earth, mud and slurry as required, loading, transporting and unloading the excavated materials mechanically and disposed off outside the working area surface/ in-pit OB dump in proper manner including spreading, dozing, lighting, water sprinkling, grading, fire-fighting and other ancillary mining activities etc. all complete as per instructions/directions of Engineer-in-charge. The job involves making access trench/haul roads, dozing, grading as required for excavation operation and for transportation of excavated materials etc., all complete.\n(Blasting shall be done by department free of cost, as and when required. Supply of explosives, detonators and related materials will be made available by BCCL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the Management free of cost.)\nRemoval and disposal of overburden also includes fire-fighting for which the tenderer has to provide adequate M.S. pipes of required lengths & dia. including all required fittings etc. for proper fire-fighting at OB faces and OB dumps as per instructions/directions of Engineer In-charge.\nThe tenderer has to make arrangements of manpower and fire-fighting including hoses to deal with fire during all operations such as drilling in hot strata at any depth, cooling the blast holes with water before charging them with explosives, charging of explosives in blast holes, digging and loading of OB, continuously spraying water over the blasted OB to quench fire etc.Tenderer has to ensure that fire is absolutely quenched before loading of OB etc.\n\nCarriage Lead: (1-2) KM from face to surface/in-pit OB dump.\n | ITEM 1 | 2.309e+06 | Cum |
2 | 1.01 | Excavation in benches (In-Situ) by mechanical means at any depth in all kinds of soil, rock, including mixed soil, mixed hard soil i.e. clay soils mixed with pebbles / laterite / stone boulders, soft or hard rock etc., removal of slushy earth, mud and slurry as required, loading, transporting and unloading the excavated materials mechanically and disposed off outside the working area surface/ in-pit OB dump in proper manner including spreading, dozing, lighting, water sprinkling, grading, fire-fighting and other ancillary mining activities etc. all complete as per instructions/directions of Engineer-in-charge. The job involves making access trench/haul roads, dozing, grading as required for excavation operation and for transportation of excavated materials etc., all complete.\n(Blasting shall be done by department free of cost, as and when required. Supply of explosives, detonators and related materials will be made available by BCCL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the Management free of cost.)\nRemoval and disposal of overburden also includes fire-fighting for which the tenderer has to provide adequate M.S. pipes of required lengths & dia. including all required fittings etc. for proper fire-fighting at OB faces and OB dumps as per instructions/directions of Engineer In-charge. \nThe tenderer has to make arrangements of manpower and fire-fighting including hoses to deal with fire during all operations such as drilling in hot strata at any depth, cooling the blast holes with water before charging them with explosives, charging of explosives in blast holes, digging and loading of OB, continuously spraying water over the blasted OB to quench fire etc.Tenderer has to ensure that fire is absolutely quenched before loading of OB etc.\nCarriage Lead: (2-3) KM from face to surface/ in-pit OB dump.\n | ITEM 2 | 1.1285e+07 | Cum |
3 | 1.02 | Excavation in benches (In-Situ) by mechanical means at any depth in all kinds of soil, rock, including mixed soil, mixed hard soil i.e. clay soils mixed with pebbles / laterite / stone boulders, soft or hard rock etc., removal of slushy earth, mud and slurry as required, loading, transporting and unloading the excavated materials mechanically and disposed off outside the working area surface/in-pit OB dump in proper manner including spreading, dozing, lighting,water sprinkling, grading, fire-fighting and other ancillary mining activities etc. all complete as per instructions/directions of Engineer-in-charge. The job involves making access trench/haul roads, dozing, grading as required for excavation operation and for transportation of excavated materials etc., all complete.\n(Blasting shall be done by department free of cost, as and when required. Supply of explosives, detonators and related materials will be made available by BCCL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the Management free of cost.)\nRemoval and disposal of overburden also includes fire-fighting for which the tenderer has to provide adequate M.S. pipes of required lengths & dia. including all required fittings etc. for proper fire-fighting at OB faces and OB dumps as per instructions/directions of Engineer In-charge. \nThe tenderer has to make arrangements of manpower and fire-fighting including hoses to deal with fire during all operations such as drilling in hot strata at any depth, cooling the blast holes with water before charging them with explosives, charging of explosives in blast holes, digging and loading of OB, continuously spraying water over the blasted OB to quench fire etc.Tenderer has to ensure that fire is absolutely quenched before loading of OB etc.\nCarriage Lead: (3-4) KM from face to surface/ In-pit OB dump.\n | ITEM 3 | 8.906e+06 | Cum |
4 | 1.03 | Excavation in benches (In-Situ) by mechanical means at any depth in all kinds of soil, rock, including mixed soil, mixed hard soil i.e. clay soils mixed with pebbles / laterite / stone boulders, soft or hard rock etc., removal of slushy earth, mud and slurry as required, loading, transporting and unloading the excavated materials mechanically and disposed off outside the working area surface OB dump in proper manner including spreading, dozing, lighting, water sprinkling, grading, fire-fighting and other ancillary mining activities etc. all complete as per instructions/directions of Engineer-in-charge.\nThe job involves making access trench/haul roads, dozing, grading as required for excavation operation and for transportation of excavated materials etc., all complete.\n(Blasting shall be done by department free of cost, as and when required. Supply of explosives, detonators and related materials will be made available by BCCL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the Management free of cost.)\nRemoval and disposal of overburden also includes fire-fighting for which the tenderer has to provide adequate M.S. pipes of required lengths & dia. including all required fittings etc. for proper fire-fighting at OB faces and OB dumps as per instructions/directions of Engineer In-charge. \nThe tenderer has to make arrangements of manpower and fire-fighting including hoses to deal with fire during all operations such as drilling in hot strata at any depth, cooling the blast holes with water before charging them with explosives, charging of explosives in blast holes, digging and loading of OB, continuously spraying water over the blasted OB to quench fire etc.Tenderer has to ensure that fire is absolutely quenched before loading of OB etc.\nCarriage Lead: (4-5) KM from face to surface/ in-pitOB dump.\n | ITEM 4 | 3.77e+06 | Cum |
5 | 1.04 | Excavation in benches (In-Situ) by mechanical means at any depth in all kinds of soil, rock, including mixed soil, mixed hard soil i.e. clay soils mixed with pebbles / laterite / stone boulders, soft or hard rock etc., removal of slushy earth, mud and slurry as required, loading, transporting and unloading the excavated materials mechanically and disposed off outside the working area surface OB dump in proper manner including spreading, dozing, lighting, water sprinkling, grading, fire-fighting and other ancillary mining activities etc. all complete as per instructions/directions of Engineer-in-charge. The job involves making access trench/haul roads, dozing, grading as required for excavation operation and for transportation of excavated materials etc., all complete.\n(Blasting shall be done by department free of cost, as and when required. Supply of explosives, detonators and related materials will be made available by BCCL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the Management free of cost.)\nRemoval and disposal of overburden also includes fire-fighting for which the tenderer has to provide adequate M.S. pipes of required lengths & dia. including all required fittings etc. for proper fire-fighting at OB faces and OB dumps as per instructions/directions of Engineer In-charge. \nThe tenderer has to make arrangements of manpower and fire-fighting including hoses to deal with fire during all operations such as drilling in hot strata at any depth, cooling the blast holes with water before charging them with explosives, charging of explosives in blast holes, digging and loading of OB, continuously spraying water over the blasted OB to quench fire etc.Tenderer has to ensure that fire is absolutely quenched before loading of OB etc.\nCarriage Lead: (5-6) KM from face to surface OB dump.\n | ITEM 5 | 502000 | Cum |
6 | 2 | Removal of dumped loose overburden by mechanical means in all kinds of soil, rock including mixed soil, mixed hard soil i.e. clay soils mixed with pebbles / laterite/ stone boulders, soft or hard rock etc., removal of slushy earth, mud & slurry as required, loading, transporting & unloading the excavated materials mechanically and disposed off outside the working zone at surface OB dump in proper manner on the dumping yard including spreading, dozing, lighting, water sprinkling, grading, fire-fighting & other ancillary mining activities etc., all complete as per instructions/directions of Engineer- in charge. The job involves making access trench/haul roads, dozing, grading as required for excavation operation and for transportation of excavated materials etc., all complete.\nRemoval and disposal of overburden also includes fire-fighting for which the tenderer has to provide adequate M.S. pipes of required lengths & dia. including all required fittings etc. for proper fire-fighting at OB faces and OB dumps as per instructions/directions of Engineer In-charge. \nThe tenderer has to make arrangements of manpower and fire-fighting including hoses to deal with fire during all operations such as drilling in hot strata at any depth, cooling the blast holes with water before charging them with explosives, charging of explosives in blast holes, digging and loading of OB, continuously spraying water over the blasted OB to quench fire etc.Tenderer has to ensure that fire is absolutely quenched before loading of OB etc.\nCarriage Lead:(2-3) KM from face to Surface OB dump.\n | ITEM 6 | 747400 | Cum |
7 | 3 | Winning / extraction of coal in benches from available coal seams at any depth, blasting (Blasting shall be done by department free of cost, as and when required. Supply of explosives, detonators and related materials will be made available by BCCL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the Management free of cost) including mechanical loading of coal free from extraneous materials into tippers/ dumpers, water sprinkling, dozing, lighting, grading, fire-fighting and other ancillary mining activities and transportation of coal from face to Surface Dump complete job as per instructions/directions of Engineer-in-charge. The above job also involves making and maintenance of access trench / haul road, dozing, grading and all other allied jobs required to accomplish the entire operation of winning / extraction and transportation of coal.\nExtraction and transportation of coal also includes fire-fighting for which the tenderer has to provide adequate number of M.S. pipes of required lengths & dia. including all required fittings etc. for proper firefighting at coal faces as per instructions/directions of Engineer In-charge.The tenderer has to make arrangements of manpower and firefighting including hoses to deal with fire during all operations such as drilling in hot strata at any depth, cooling the blast holes with water before charging them with explosives, charging of explosives in blast holes, digging and loading of coal, continuously spraying water over the blasted coal to quench fire etc.Tenderer has to ensure that fire is absolutely quenched before transportation of coal from face and fire does not reappear subsequently.\nCarriage Lead: (1-2) KM from face to Surface Coal Dump\n | ITEM 7 | 45000 | MT |
8 | 3.01 | Winning / extraction of coal in benches from available coal seams at any depth, blasting (Blasting shall be done by department free of cost, as and when required. Supply of explosives, detonators and related materials will be made available by BCCL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the Management free of cost) including mechanical loading of coal free from extraneous materials into tippers/ dumpers, water sprinkling, dozing, lighting, grading, fire-fighting and other ancillary mining activities and transportation of coal from face to Surface Dump complete job as per instructions/ directions of Engineer-in-charge. The above job also involves making and maintenance of access trench / haul road, dozing, grading and all other allied jobs required to accomplish the entire operation of winning / extraction and transportation of coal. \nExtraction and transportation of coal also includes fire-fighting for which the tenderer has to provide adequate number of M.S. pipes of required lengths & dia. including all required fittings etc. for proper firefighting at coal faces as per instructions/directions of Engineer In-charge.The tenderer has to make arrangements of manpower and firefighting including hoses to deal with fire during all operations such as drilling in hot strata at any depth, cooling the blast holes with water before charging them with explosives, charging of explosives in blast holes, digging and loading of coal, continuously spraying water over the blasted coal to quench fire etc.Tenderer has to ensure that fire is absolutely quenched before transportation of coal from face and fire does not reappear subsequently.\nCarriage Lead: (2-3) KM from face to Surface Coal Dump\n | ITEM 8 | 660000 | MT |
9 | 3.02 | Winning / extraction of coal in benches from available coal seams at any depth, blasting (Blasting shall be done by department free of cost, as and when required. Supply of explosives, detonators and related materials will be made available by BCCL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the Management free of cost) including mechanical loading of coal free from extraneous materials into tippers/ dumpers, water sprinkling, dozing, lighting, grading, fire-fighting and other ancillary mining activities and transportation of coal from face to Surface Dump complete job as per instructions/directions of Engineer-in-charge. The above job also involves making and maintenance of access trench / haul road, dozing, grading and all other allied jobs required to accomplish the entire operation of winning / extraction and transportation of coal. \nExtraction and transportation of coal also includes fire-fighting for which the tenderer has to provide adequate number of M.S. pipes of required lengths & dia. including all required fittings etc. for proper firefighting at coal faces as per instructions/directions of Engineer In-charge.\nThe tenderer has to make arrangements of manpower and firefighting including hoses to deal with fire during all operations such as drilling in hot strata at any depth, cooling the blast holes with water before charging them with explosives, charging of explosives in blast holes, digging and loading of coal, continuously spraying water over the blasted coal to quench fire etc.Tenderer has to ensure that fire is absolutely quenched before transportation of coal from face and fire does not reappear subsequently.\nCarriage Lead: (3-4) KM from face to Surface Coal Dump\n | ITEM 9 | 156000 | MT |
10 | 3.03 | Winning / extraction of coal in benches from available coal seams at any depth, blasting (Blasting shall be done by department free of cost, as and when required. Supply of explosives, detonators and related materials will be made available by BCCL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the Management free of cost) including mechanical loading of coal free from extraneous materials into tippers/ dumpers, water sprinkling, dozing, lighting, grading, fire-fighting and other ancillary mining activities and transportation of coal from face to Contractual Crusher Hopper complete job as per instructions/directions of Engineer-in-charge. The above job also involves making and maintenance of access trench / haul road, dozing, grading and all other allied jobs required to accomplish the entire operation of winning / extraction and transportation of coal. \nExtraction and transportation of coal also includes fire-fighting for which the tenderer has to provide adequate number of M.S. pipes of required lengths & dia. including all required fittings etc. for proper firefighting at coal faces as per instructions/directions of Engineer In-charge.The tenderer has to make arrangements of manpower and firefighting including hoses to deal with fire during all operations such as drilling in hot strata at any depth, cooling the blast holes with water before charging them with explosives, charging of explosives in blast holes, digging and loading of coal, continuously spraying water over the blasted coal to quench fire etc.Tenderer has to ensure that fire is absolutely quenched before transportation of coal from face and fire does not reappear subsequently.\nCarriage Lead: (1-2) KM from face to Contractual Crusher Hopper\n | ITEM 10 | 343000 | MT |
11 | 3.04 | Winning / extraction of coal in benches from available coal seams at any depth, blasting (Blasting shall be done by department free of cost, as and when required. Supply of explosives, detonators and related materials will be made available by BCCL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the Management free of cost) including mechanical loading of coal free from extraneous materials into tippers/ dumpers, water sprinkling, dozing, lighting, grading, fire-fighting and other ancillary mining activities and transportation of coal from face to Contractual Crusher Hopper complete job as per instructions/directions of Engineer-in-charge. The above job also involves making and maintenance of access trench / haul road, dozing, grading and all other allied jobs required to accomplish the entire operation of winning / extraction and transportation of coal. \nExtraction and transportation of coal also includes fire-fighting for which the tenderer has to provide adequate number of M.S. pipes of required lengths & dia. including all required fittings etc. for proper firefighting at coal faces as per instructions/directions of Engineer In-charge.The tenderer has to make arrangements of manpower and firefighting including hoses to deal with fire during all operations such as drilling in hot strata at any depth, cooling the blast holes with water before charging them with explosives, charging of explosives in blast holes, digging and loading of coal, continuously spraying water over the blasted coal to quench fire etc.Tenderer has to ensure that fire is absolutely quenched before transportation of coal from face and fire does not reappear subsequently.\nCarriage Lead: (2-3) KM from face to Contractual Crusher Hopper\n | ITEM 11 | 5.671e+06 | MT |
12 | 3.05 | Winning / extraction of coal in benches from available coal seams at any depth, blasting (Blasting shall be done by department free of cost, as and when required. Supply of explosives, detonators and related materials will be made available by BCCL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the Management free of cost) including mechanical loading of coal free from extraneous materials into tippers/ dumpers, water sprinkling, dozing, lighting, grading, fire-fighting and other ancillary mining activities and transportation of coal from face to Contractual Crusher Hopper complete job as per instructions/directions of Engineer-in-charge.\nThe above job also involves making and maintenance of access trench / haul road, dozing, grading and all other allied jobs required to accomplish the entire operation of winning / extraction and transportation of coal. \nExtraction and transportation of coal also includes fire-fighting for which the tenderer has to provide adequate number of M.S. pipes of required lengths & dia. including all required fittings etc. for proper firefighting at coal faces as per instructions/directions of Engineer In-charge.The tenderer has to make arrangements of manpower and firefighting including hoses to deal with fire during all operations such as drilling in hot strata at any depth, cooling the blast holes with water before charging them with explosives, charging of explosives in blast holes, digging and loading of coal, continuously spraying water over the blasted coal to quench fire etc.Tenderer has to ensure that fire is absolutely quenched before transportation of coal from face and fire does not reappear subsequently.\nCarriage Lead: (3-4) KM from face to Contractual Crusher Hopper\n | ITEM 12 | 444000 | MT |
13 | 3.06 | Winning / extraction of coal in benches from available coal seams at any depth, blasting (Blasting shall be done by department free of cost, as and when required. Supply of explosives, detonators and related materials will be made available by BCCL and the services of statutory supervisory personnel as required for the work will beprovided as and when considered necessary by the Management free of cost) including mechanical loading of coal free from extraneous materials into tippers/ dumpers, water sprinkling, dozing, lighting, grading, fire-fighting and other ancillary mining activities and transportation of coal from face to Dept. Crusher Hopper at NLOCP Siding complete job as per instructions/directions of Engineer-in-charge. The above job also involves making and maintenance of access trench / haul road, dozing, grading and all other allied jobs required to accomplish the entire operation of winning / extraction and transportation of coal. \nExtraction and transportation of coal also includes fire-fighting for which the tenderer has to provide adequate number of M.S. pipes of required lengths & dia. including all required fittings etc. for proper firefighting at coal faces as per instructions/directions of Engineer In-charge.\nThe tenderer has to make arrangements of manpower and firefighting including hoses to deal with fire during all operations such as drilling in hot strata at any depth, cooling the blast holes with water before charging them with explosives, charging of explosives in blast holes, digging and loading of coal, continuously spraying water over the blasted coal to quench fire etc.Tenderer has to ensure that fire is absolutely quenched before transportation of coal from face and fire does not reappear subsequently.\nCarriage Lead: (3-4) KM from face to Dept. Crusher Hopper at NLOCP Siding\n | ITEM 13 | 114000 | MT |
14 | 3.07 | Winning / extraction of coal in benches from available coal seams at any depth, blasting (Blasting shall be done by department free of cost, as and when required. Supply of explosives, detonators and related materials will be made available by BCCL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the Management free of cost) including mechanical loading of coal free from extraneous materials into tippers/ dumpers, water sprinkling, dozing, lighting, grading, fire-fighting and other ancillary mining activities and transportation of coal from face to Dept. Crusher Hopper at NLOCP Siding complete job as per instructions/directions of Engineer-in-charge. The above job also involves making and maintenance of access trench / haul road, dozing, grading and all other allied jobs required to accomplish the entire operation of winning / extraction and transportation of coal. \nExtraction and transportation of coal also includes fire-fighting for which the tenderer has to provide adequate number of M.S. pipes of required lengths & dia. including all required fittings etc. for proper firefighting at coal faces as per instructions/directions of Engineer In-charge.The tenderer has to make arrangements of manpower and firefighting including hoses to deal with fire during all operations such as drilling in hot strata at any depth, cooling the blast holes with water before charging them with explosives, charging of explosives in blast holes, digging and loading of coal, continuously spraying water over the blasted coal to quench fire etc.Tenderer has to ensure that fire is absolutely quenched before transportation of coal from face and fire does not reappear subsequently.\nCarriage Lead: (4-5) KM from face to Dept. Crusher Hopper at NLOCP Siding.\n | ITEM 14 | 326000 | MT |
15 | 3.08 | Winning / extraction of coal in benches from available coal seams at any depth, blasting (Blasting shall be done by department free of cost, as and when required. Supply of explosives, detonators and related materials will be made available by BCCL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the Management free of cost) including mechanical loading of coal free from extraneous materials into tippers/ dumpers, water sprinkling, dozing, lighting, grading, fire-fighting and other ancillary mining activities and transportation of coal from face to Dept. Crusher Hopper at NLOCP Siding complete job as per instructions/directions of Engineer-in-charge. The above job also involves making and maintenance of access trench / haul road, dozing, grading and all other allied jobs required to accomplish the entire operation of winning / extraction and transportation of coal. \nExtraction and transportation of coal also includes fire-fighting for which the tenderer has to provide adequate number of M.S. pipes of required lengths & dia. including all required fittings etc. for proper firefighting at coal faces as per instructions/directions of Engineer In-charge.The tenderer has to make arrangements of manpower and firefighting including hoses to deal with fire during all operations such as drilling in hot strata at any depth, cooling the blast holes with water before charging them with explosives, charging of explosives in blast holes, digging and loading of coal, continuously spraying water over the blasted coal to quench fire etc.Tenderer has to ensure that fire is absolutely quenched before transportation of coal from face and fire does not reappear subsequently.\nCarriage Lead: (5-6) KM from face to Dept. Crusher Hopper at NLOCP Siding\n | ITEM 15 | 851000 | MT |
16 | 3.09 | Transportation of Coal from proposed Contractual Crusher Chute to Dahibari Washery via Khoodia at a lead of (2-3) KM with tipper loading by payloader at crusher chute including cost of all materials, labor and ancillary works etc. complete job as per instructions/directions of Engineer-in-charge. | ITEM 16 | 5.166e+06 | MT |
17 | 3.1 | Transportation of Coal from proposed Contractual Crusher Chute to Dahibari Washery via Patlabari at a lead of (5-6) KM with tipper loading by payloader at crusher chute including cost of all materials, labor and ancillary works etc. complete job as per instructions/directions of Engineer-in-charge. | ITEM 17 | 1.292e+06 | MT |
18 | 3.11 | Transportation of Coal from NLOCP Dept. Crusher Chute with tipper loading by payloader at crusher chute to NLOCP Siding at a lead slab of (0-1)KM and wagon loading by payloader at NLOCP Siding including cost of all materials, labor and ancillary works etc. complete job as per instructions/directions of Engineer-in-charge. | ITEM 18 | 1.291e+06 | MT |
19 | 3.12 | Crushing of coal to (-) 200mm Size (all dimensions) by electrically operated mobile crusher with spreader including feeding of coal into mobile crusher. The elements include providing & installing suitable & matching mobile crushing arrangement as per NIT requirement with all infrastructures including operation, repair & maintenance of crushing arrangement (Electricity will be supplied free of cost by BCCL) etc. complete job as per instructions/ directions of Engineer-in-charge. | ITEM 19 | 6.458e+06 | MT |
20 | 4 | Drilling in Coal and OB by mechanical means at any depth in all kinds of soil, rock, including mixed soil, mixed hard soil or hard rock, coal etc. water sprinkling, dozing and other ancillary mining activities etc. all complete as per instructions/directions of Engineer-in-charge.\nTenderer has to make all necessary arrangement also for firefighting as per instruction of Engineer-in-charge.\n | ITEM 20 | 2.68162e+06 | Mtr |
21 | 5 | Total impact of GST for the purpose of CTC | ITEM 21 | 1 | Nos |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail