Director General Of Police has published Request For Proposal (Rfp) For Establishment Of Police Surveillance System For Haridwar Kumbh 2021. Submission Date for this Tender is 12-01-2021. CCTV System Tenders in KUMBH MELA AREA Uttarakhand. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 01-Jan-2021 | PRE BID | Technical Bid | 08-01-2021 |
2 | 04-Jan-2021 | Corrigendum for Technical | Technical Bid | 11-01-2021 |
3 | 09-Jan-2021 | Corrigendum 3 | Date | 12-01-2021 |
Name of Work: Request for Proposal (RFP) for Establishment of Police Surveillance System for Haridwar Kumbh 2021 | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Surveillance System | BI01010001010000000000000515BI0100001112 | ||
2 | 1.01 | Outdoor Box 4 MP Camera with IR camera | 278 | Nos | |
3 | 1.02 | PTZ with IR 30X | 22 | Nos | |
4 | 1.03 | ANPR Camera With License (5 Location) | 10 | Nos | |
5 | 1.04 | Cantilever Pole | 10 | Nos | |
6 | 1.05 | Poles for cameras and equipments | 100 | Nos | |
7 | 1.06 | UPS with 1 hr. backup (appropriate Backup as per technical/ functional specification) | 110 | Nos | |
8 | 1.07 | Solar Panel With Battery & All Accessories | 50 | Nos | |
9 | 1.08 | Networking Cost (Passive Components) (Pl. specify the details like Junction Box, Patch Panel, LIU, Cat6 Cable, Power Cable, Patch Cords, Pipes, earthing, Lighting arrester and electrical, earthing cables, Installation & Labour Charges, etc. | 100 | Nos | |
10 | 1.09 | Power Cable | 8000 | Mtrs | |
11 | 1.1 | Provisioning of Electricity Power Meter +30 Mtr. Of UPCL Underground Power Cables | 1 | Lot | |
12 | 1.11 | Network Switch for Parking & Holding Area, 8 Port PoE | 23 | Nos | |
13 | 1.12 | Junction Box and UPS for Parking Area with one hr. Backup | 23 | Nos | |
14 | 1.13 | 8 Channel NVR 30 days backup (With 22” Monitor & 4X2 HDD) With broadband Connection to connect the above mentioned places to the control room for 3 year. | 4 | Nos | |
15 | 2 | Connectivity | |||
16 | 2.01 | Industrial grade outdoor 8 Port PoE Switches | 110 | Nos | |
17 | 2.02 | Media Convertor for Holdup & Parking | 50 | Nos | |
18 | 2.03 | Industrial grade Distribution Switch with 10G SFP port | 20 | Nos | |
19 | 2.04 | LAN L3 Switches with failover | 2 | Nos | |
20 | 2.05 | Core Switch | 2 | Nos | |
21 | 2.06 | Router | 1 | Nos | |
22 | 2.07 | Radio For connectivity | 10 | Pair | |
23 | 2.08 | OFC laying (12 cores) armoured | 50 | kms | |
24 | 3 | Public Address System | |||
25 | 3.01 | PA system 50 Location(Per location 3 Horn), PA system should be provided along with live monitoring Software With Hardware | 50 | Nos | |
26 | 4 | Local Server Room | |||
27 | 4.01 | Surveillance Cameras-Management Server with N+1 | 2 | Nos | |
28 | 4.02 | Surveillance cameras recording server N+1 | 5 | Nos | |
29 | 4.03 | VMD & PA server with failover N+1 | 2 | Nos | |
30 | 4.04 | AI Server with failover N+1 | 3 | Nos | |
31 | 4.05 | NMS | 1 | Nos | |
32 | 4.06 | Analytics (Software + License ) | 100 | Nos | |
33 | 4.07 | Video Management System (VMS) | 300 | Nos | |
34 | 4.08 | KVM Switch (along with desired software system like OS, DB, etc.) | 1 | Nos | |
35 | 4.09 | Centralized Antivirus Solution | 1 | Lot | |
36 | 4.1 | Laptop core i7 with operating system | 2 | Nos | |
37 | 4.11 | Firewall with failover (N+1) | 2 | Nos | |
38 | 4.12 | 500 TB Storage (usable) | 1 | Nos | |
39 | 5 | VMD (Variable Message Display) | |||
40 | 5.01 | VMS board including VMS controller size 3000mm*1500mm*200mm (Minimum) with complete hardware and accessories as required mounting structure for VMD | 5 | Nos | |
41 | 5.02 | 3 KVA UPS | 5 | Nos | |
42 | 6 | Hardware for CCC/PSCR | |||
43 | 6.01 | Video Wall Cubes (55'') 5*2 matrix LED | 10 | Nos | |
44 | 6.02 | Video Wall Controller with Wall Management System | 1 | Nos | |
45 | 6.03 | Workstation for Operator & Wireless Grid with 24” Monitor | 18 | Nos | |
46 | 6.04 | Workstation with 24” Monitor for monitoring cameras of railway station | 1 | Nos | |
47 | 6.05 | Access control for server room and Viewing Centre | 2 | Nos | |
48 | 6.06 | Multi Function Laser Printer (City Operations Room) Print, Copy, Scan and Fax, ADF, Duplex | 1 | Nos | |
49 | 6.07 | CPU With 65" LED display to present critical information Display | 1 | Nos | |
50 | 6.08 | 20 kva UPS with 02 hrs backup for PSS with failover | 2 | Nos | |
51 | 6.09 | Electrical and power cabling | 1 | Lot | |
52 | 6.1 | LAN and CAT-6 cabling | 1 | Lot | |
53 | 6.11 | Fire & Smoke Detection System for PCR | 1 | Lot | |
54 | 6.12 | Furniture for PSS Operator Desks | 18 | Nos | |
55 | 6.13 | Furniture for Situation Room with Conference table and chairs | 1 | Nos | |
56 | 6.14 | Adjustable Chairs | 10 | Nos | |
57 | 6.15 | Sofa Set with centre table for PSS | 1 | Set | |
58 | 6.16 | Furniture for Dial 112, City Control Room | 3 | Nos | |
59 | 6.17 | Civil Work (3000 Sq Ft) (Structure of building shall be provided by the client, finishing which includes wiring, ducting, false ceiling, false flooring,light fixtures etc. will be the responsibility of MSI) | 1 | Lumpsum | |
60 | 6.18 | 1.5 Ton Split AC for Control Room | 10 | Nos | |
61 | 7 | Any additional hardware/software required | 1 | Lumpsum | |
62 | 8 | Comprehensive Operations, Maintenance and support for Surveillance System for: | |||
63 | 8.01 | Year 1 | 1 | Lumpsum | |
64 | 8.02 | Year 2 | 1 | Lumpsum | |
65 | 8.03 | Year 3 | 1 | Lumpsum | |
66 | 9 | Comprehensive Operations, Maintenance and support for Connectivity for: | |||
67 | 9.01 | Year 1 | 1 | Lumpsum | |
68 | 9.02 | Year 2 | 1 | Lumpsum | |
69 | 9.03 | Year 3 | 1 | Lumpsum | |
70 | 10 | Comprehensive Operations, Maintenance and support for Public Address System for: | |||
71 | 10.01 | Year 1 | 1 | Lumpsum | |
72 | 10.02 | Year 2 | 1 | Lumpsum | |
73 | 10.03 | Year 3 | 1 | Lumpsum | |
74 | 11 | Comprehensive Operations, Maintenance and support for Local Server Room for: | |||
75 | 11.01 | Year 1 | 1 | Lumpsum | |
76 | 11.02 | Year 2 | 1 | Lumpsum | |
77 | 11.03 | Year 3 | 1 | Lumpsum | |
78 | 12 | Comprehensive Operations, Maintenance and support for Variable Message Display for: | |||
79 | 12.01 | Year 1 | 1 | Lumpsum | |
80 | 12.02 | Year 2 | 1 | Lumpsum | |
81 | 12.03 | Year 3 | 1 | Lumpsum | |
82 | 13 | Comprehensive Operations, Maintenance and support for Hardware for CCC/PSCR for: | |||
83 | 13.01 | Year 1 | 1 | Lumpsum | |
84 | 13.02 | Year 2 | 1 | Lumpsum | |
85 | 13.03 | Year 3 | 1 | Lumpsum | |
86 | 14 | Electricity Recurring Charges for field locations for 1 year | 1 | Lumpsum | |
87 | 15 | Comprehensive Operations, Maintenance and support for additional hardware/software required | |||
88 | 15.01 | Year 1 | 1 | Lumpsum | |
89 | 15.02 | Year 2 | 1 | Lumpsum | |
90 | 15.03 | Year 3 | 1 | Lumpsum | |
91 | 16 | Technical Manpower | |||
92 | 16.01 | Project Manager | 3 | Man-Months | |
93 | 16.02 | Public Address System Expert | 6 | Man-Months | |
94 | 16.03 | Technical Expert Security and Surveillance | 6 | Man-Months | |
95 | 16.04 | Technical Expert Network | 6 | Man-Months | |
96 | 16.05 | CCTV Technicians | 108 | Man-Months |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail