| 1 | 1 | Errection of gauge scale for Satff Gauge at Thanneermukkam Barrage,Kariyar spillway,Andhakaranazhy regulator | BI01010001010000000000000515BI0100001113 | | |
|---|
| 2 | 1.01 | 2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | BI01010001010000000000000515BI0100001114 | 64 | sqm |
|---|
| 3 | 1.02 | 10.1 : Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | BI01010001010000000000000515BI0100001115 | 149.6 | kilogram |
|---|
| 4 | 1.03 | od33969/2020_2021/KP : Driving down 75x75x6mm angle section to lines and levels through various strata including all hire charges and labour for fixing , staging platform and all other appliances necessary for the erection of gauging staff after pointing the bottom end | BI01010001010000000000000515BI0100001116 | 10 | metre |
|---|
| 5 | 1.04 | 13.61.1 : Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work | BI01010001010000000000000515BI0100001117 | 6 | sqm |
|---|
| 6 | 1.05 | od32873/2020_2021/KP : Supplying of staff gauge comply IS 4080-1994 ,for the manual observation of water level. Material enamelled steel or stable FRP plate,colour white background deep blue graduations,length 1000 mm, accuracy of graduations 0.5 mm , distinction cm,dm and m ,index at 5 cm mark ,width -100 mm | BI01010001010000000000000515BI0100001118 | 14 | metre |
|---|
| 7 | 1.06 | od34029/2020_2021/KP : Engaging labours for fixing the staff gauge on structures. | BI01010001010000000000000515BI0100001119 | 1 | Day |
|---|
| 8 | 1.07 | 60.11.1 : FIXING TBM- Supplying and fixing TBM with RCC 1:1.5:3 pillar block having a size of 30*30*75 cm, steel reinforcement for RCC work, painting top and sides of pillar with synthetic enamel paint, lettering in the pillar block with 8cm high \"TBM\" on one face and the reduced level on the outer face, etc complete, fixed in CC1:3:6 using 40 mm metal 55*55*60 cm etc complete and centering and shuttering including strutting , propping and removal of form work for pillar and foundation. | BI01010001010000000000000515BI0100001120 | 3 | each |
|---|