| 1 | 1 | PG-Calibration of faulty pressure gauges. | a1 | 58 | No |
|---|
| 2 | 2 | PG-Fixing of diaphragm type pressure gauge with isolation valve. | a2 | 43 | No |
|---|
| 3 | 3 | PG-Fixing of diaphragm & capillary type pressure gauge. | a3 | 170 | No |
|---|
| 4 | 4 | PG-Replacement of defective pressure gauge & defective PG with isolation valve. PG removal and shifting to workshop. | a4 | 75 | No |
|---|
| 5 | 5 | PG-Rectification of leakage for PG having leakage from PG bottom chamber or from gasket. | a5 | 55 | No |
|---|
| 6 | 6 | PG-Rectification of leakage from PG 1/2 inch process connection. | a6 | 42 | No |
|---|
| 7 | 7 | LG- Replacement/rectification defective Drain valve of level gauge & Fixing new level gauge Drain valve & Removal, cleaning and fixing back of level gauge scale. | a7 | 115 | No |
|---|
| 8 | 8 | LG-Shifting of level gauge from stores to site. | a8 | 43 | No |
|---|
| 9 | 9 | LG-Flushing, de-chocking and cleaning of magnetic level gauge & Fixing of level gauge after rectification. | a9 | 86 | No |
|---|
| 10 | 10 | LG-Removal, cleaning and replacement of deformed float & Rectification of leakage problem from isolation valve. | a10 | 72 | No |
|---|
| 11 | 11 | LG-Fixing of plug at LG drain and vent. | a11 | 60 | No |
|---|
| 12 | 12 | LG-Replacement of guide wire & defective float of float and board LGs | a12 | 19 | No |
|---|
| 13 | 13 | LG-Pointer relocation of float and board LGs | a13 | 7 | No |
|---|
| 14 | 14 | Magnetic Flow Meter- Fixing of mag flow meter at new location. | a14 | 14 | No |
|---|
| 15 | 15 | Magnetic Flow Meter - Removal, cleaning and fixing back of flow tube. | a15 | 14 | No |
|---|
| 16 | 16 | Magnetic Flow Meter - Replacement of defective converter & Checking and programming of converter. | a16 | 22 | No |
|---|
| 17 | 17 | Magnetic Flow Meter -Cabling, glanding and termination of mag flow meter & checking of flow tube & Checking calibration of mag flow using simulator. | a17 | 50 | cm2 |
|---|
| 18 | 18 | Magnetic Flow Meter -Rectification/replacement of defective earthing & rectification of leakage problem of mag flow. | a18 | 36 | No |
|---|
| 19 | 19 | Magnetic Flow Meter - Replacement of defective float of float and board LGs and checking of flow tube using simulator & Relocation, modification and new installation of mag flow meter | a19 | 86 | No |
|---|
| 20 | 20 | Control Valve- Overhauling of control valve | a20 | 12 | No |
|---|
| 21 | 21 | Control Valve - Removal and shifting of control valve to workshop for maintenance & Rectification of butterfly valve body leakage from the shaft end leakage. | a21 | 29 | No |
|---|
| 22 | 22 | Control Valve - Removal and rectification of gland, flange & seat leakage. | a22 | 50 | No |
|---|
| 23 | 23 | Control Valve - Replacement of defective AFR of control valve. | a23 | 14 | Nos |
|---|
| 24 | 24 | Control Valve - Control valve fixing calibration and taking in line Control valve removal, cleaning and shifting to store. | a24 | 29 | Nos |
|---|
| 25 | 25 | Control Valve - Control valve cable laying, dressing, glanding and termination. | a25 | 22 | Nos |
|---|
| 26 | 26 | Control Valve - Relocation, modification and new installation of control valve | a26 | 48 | Nos |
|---|
| 27 | 27 | ULT- Tank manhole cover removal and shifting to mechanical workshop for providing nozzle for ULT & Preparing Canopy for ULT and fixing. . | a27 | 7 | Nos |
|---|
| 28 | 28 | ULT-Fixing, cabling and termination of ULT, ULT removal, cleaning and mounted back, Cable laying dressing for ULT. Fixing, cabling and termination of local indicator for ULT. | a28 | 36 | Nos |
|---|
| 29 | 29 | ULT-Mounting of ULT with still well on the tank.\nULT-Calibration of ULT to match LG and LT & Providing extended nozzle for ULT. Replacement of DPLT with ULT.\n | a29 | 29 | Nos |
|---|
| 30 | 30 | ULT-Calibration of ULT to match LG and LT & Providing extended nozzle for ULT. Replacement of DPLT with ULT. | a30 | 29 | Nos |
|---|
| 31 | 31 | ULT-Mounting of ULT after maintenance. | a31 | 14 | Nos |
|---|
| 32 | 32 | ULT-Relocation, modification and new installation of ULT\nLEVEL SWITCH- Removal cleaning and replacement of deform float & Cleaning and rectification of sump level switch. | a32 | 24 | Nos |
|---|
| 33 | 33 | LEVEL SWITCH- Removal cleaning and replacement of deform float & Cleaning and rectification of sump level switch. | a33 | 22 | Nos |
|---|
| 34 | 34 | Level Switch- Dechoking of isolation valve and Level switch & Rectification of leakage from drain valve. | a34 | 22 | Nos |
|---|
| 35 | 35 | Level Switch - Replacement of defective drain valve. | a35 | 12 | Nos |
|---|
| 36 | 36 | Level Switch - Providing plug at drain and vent. | a36 | 36 | Nos |
|---|
| 37 | 37 | Level Switch - Rectification of leakage from drain valve & leakage from Level switch flange joint. | a37 | 12 | Nos |
|---|
| 38 | 38 | Level Switch - Relocation, modification and new installation of Level Switch | a38 | 10 | Nos |
|---|
| 39 | 39 | DPFT- Calibration of DPFT & Isolating, cleaning of FT flange and taking in line. | a39 | 10 | Nos |
|---|
| 40 | 40 | DPFT- Impulse line cleaning. | a40 | 10 | Nos |
|---|
| 41 | 41 | DPFT- Power resetting of FT and taken in line. & Adjusting Zero shift. | a41 | 10 | Nos |
|---|
| 42 | 42 | DPLT- Calibration of DPLT & Isolating, cleaning of LT flange and taking in line. | a42 | 22 | Nos |
|---|
| 43 | 43 | DPLT- Dechoking of isolation, cleaning of LT flange and taking in line. | a43 | 12 | Nos |
|---|
| 44 | 44 | DPLT- Cleaning of LT cable and reterminating & Power resetting of LT and taken in line. | a44 | 14 | Nos |
|---|
| 45 | 45 | DPLT- Adjusting Zero shift. | a45 | 14 | Nos |
|---|
| 46 | 46 | RADAR LT- LT removal, cleaning and shifting to store & Checking calibration of Radar LT. | a46 | 36 | Nos |
|---|
| 47 | 47 | RADAR LT- LT fixing, glanding & termination & Programming of Radar level transmitter. | a47 | 36 | Nos |
|---|
| 48 | 48 | RADAR LT- Checking calibration of Radar LT | a48 | 42 | Nos |
|---|
| 49 | 49 | RTD or TT - removal, cleaning and shifting to store & Checking calibration of RTD or TT. | a49 | 10 | Nos |
|---|
| 50 | 50 | RTD or TT - Fixing, glanding & termination of RTD or TT | a50 | 10 | Nos |
|---|
| 51 | 51 | DCS- Replacement of defective fan & Loop checking of motor control loop. | a51 | 36 | Nos |
|---|
| 52 | 52 | DCS- Updating of Panel and JB Wiring. | a52 | 29 | Nos |
|---|
| 53 | 53 | DCS- Fixing cable ducts cover after cable dressing & Replacement of defective glass fuse. | a53 | 288 | Nos |
|---|
| 54 | 54 | DCS- Cleaning of all the panels and consoles. | a54 | 43 | Nos |
|---|
| 55 | 55 | DCS- Terminals tightened in all panels, Mounting of fuse TB and normal TB & Wiring job for panel. | a55 | 360 | Nos |
|---|
| 56 | 56 | DCS- Fixing of relay panel, diode array block & Mounting of isolators. | a56 | 36 | Nos |
|---|
| 57 | 57 | PRESSURE SWITCH- Replacement of defective pressure switch. | a57 | 7 | Nos |
|---|
| 58 | 58 | PRESSURE SWITCH- Pressure switch removal, calibration and fixing back. | a58 | 7 | Nos |
|---|
| 59 | 59 | TELEPHONE- Replacement of defective telephone set & defective hand set cable for telephone. | a59 | 36 | Nos |
|---|
| 60 | 60 | TELEPHONE- Repairing of defective telephone set. | a60 | 12 | Nos |
|---|
| 61 | 61 | TELEPHONE- One new Telephone connection given with telephone set, Telephone line loop checking & Shifting of telephone from different location. | a61 | 36 | Nos |
|---|
| 62 | 62 | Rotameter- Removal of rotameter, cleaning and fixing back. | a62 | 43 | Nos |
|---|
| 63 | 63 | Rotameter - Rectification of Flange leakage problem & Replacement of defective Rotameter. | a63 | 26 | Nos |
|---|
| 64 | 64 | Rotameter - Installation/Fixing, glanding, termination of Rotameter. | a64 | 42 | Nos |
|---|
| 65 | 65 | Rotameter - Loop checking of rotament for control room indication. | a65 | 7 | Nos |
|---|
| 66 | 66 | Rotameter - Cabling, Dressing, Glanding and termination for Rotameter. | a66 | 14 | Nos |
|---|
| 67 | 67 | Rotameter - Covering rotameter with polyethene & Removal, cleaning and shifting of Rotameter to store. | a67 | 84 | Nos |
|---|
| 68 | 68 | PH- Checking calibration of PH transmitters | a68 | 5 | Nos |
|---|
| 69 | 69 | PH- RTD and PH meter cabling to converter. | a69 | 5 | Nos |
|---|
| 70 | 70 | PC- Routine checking cleaning and up keeping of PC & Providing printer and installing in PC. | a70 | 22 | Nos |
|---|
| 71 | 71 | PC- Replacing defective monitor & defective mouse of computer. | a71 | 29 | Nos |
|---|
| 72 | 72 | PC- Relocating PC with table from one location to another location. | a72 | 7 | Nos |
|---|
| 73 | 73 | Others- Shifting of material and instrument from one location to another & Material shifting from main store to plant. | a73 | 144 | Nos |
|---|
| 74 | 74 | Others - Shifting of cable drums. | a74 | 14 | Nos |
|---|
| 75 | 75 | Others - Covering with polyethene sheet on field instrument for rainy season protection. | a75 | 58 | Nos |
|---|
| 76 | 76 | Others - PA system arrangement in meeting hall. | a76 | 22 | Nos |
|---|
| 77 | 77 | Others - 6mm & 12mm SS tubing. | a77 | 480 | Nos |
|---|
| 78 | 78 | Others - Rectification, Fixing of Air filter Regulator & Rectification of push button problem of plant PA system. | a78 | 115 | Nos |
|---|
| 79 | 79 | Others - Fixing of magnet of plant PA system. | a79 | 14 | Nos |
|---|
| 80 | 80 | Others - Power resetting of PA system & Maintenance of attendance system. | a80 | 29 | Nos |
|---|
| 81 | 81 | Others - Cleaning JB & field instrument. | a81 | 259 | Nos |
|---|
| 82 | 82 | Others - Rectification, programming and resetting of fire alarm system. | a82 | 14 | Nos |
|---|
| 83 | 83 | Others - Preparing and fixing aluminum canopy for field instrument and JB. | a83 | 29 | Nos |
|---|
| 84 | 84 | Others - Replacement of defective solenoid valve. | a84 | 7 | Nos |
|---|
| 85 | 85 | Others - Multi core cable, Drop cable , Power cable laying glanding and termination | a85 | 3000 | Nos |
|---|
| 86 | 86 | Others - Housekeeping job for instrument's in different units. | a86 | 144 | Nos |
|---|