| 1 | 1 | Dagbelling 5 to 7.5 cm deep | BI01010001010000000000000515BI0100001113 | 1800 | Rm |
|---|
| 2 | 2 | Clearance of Jungle and cutting of ordinary vegetation shrubs and bushes | BI01010001010000000000000515BI0100001114 | 1559 | Sqm |
|---|
| 3 | 3 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect | BI01010001010000000000000515BI0100001112 | | |
|---|
| 4 | 3.1 | Hard soil mixed with Kankar / boulders, Morrum | BI01010001010000000000000515BI0100001115 | 352 | Cum |
|---|
| 5 | 3.2 | Soft / Disintegrated rock | BI01010001010000000000000515BI0100001116 | 343.425 | Cum |
|---|
| 6 | 3.3 | Hard rock without blasting | BI01010001010000000000000515BI0100001117 | 25.725 | Cum |
|---|
| 7 | 4 | Cement Concrete 1:3:6 well mixed and laid in position complete including all leads of all construction materials including curing and finishing well graded broken stone aggregate of maximum size upto 40mm | BI01010001010000000000000515BI0100001118 | 136.96 | Cum |
|---|
| 8 | 6 | Random rubble stone masonary in cement mortar 1:6 for | BI01010001010000000000000515BI0100001130 | | |
|---|
| 9 | 6.1 | Foundation | BI01010001010000000000000515BI0100001120 | 6.3 | Cum |
|---|
| 10 | 6.2 | Superstructure | BI01010001010000000000000515BI0100001121 | 6.741 | Cum |
|---|
| 11 | 7 | Cement concrete well mixed with cement mortar (1:2:4) laid in position complete excluding curing with aggregate size upto 12mm HB. | BI01010001010000000000000515BI0100001122 | 24.763 | Cum |
|---|
| 12 | 8 | Dismentling old cement plaster, scratching of jhiri, joints and cleaning of surfaces | BI01010001010000000000000515BI0100001123 | 13.6 | Sqm |
|---|
| 13 | 9 | Random rubble stone masonary in cement mortar 1:6 for | BI01010001010000000000000515BI0100001124 | | |
|---|
| 14 | 9.1 | Foundation | BI01010001010000000000000515BI0100001125 | 332 | Cum |
|---|
| 15 | 10 | Cement plaster in cement sand mortar 1:4, 25mm thick. | BI01010001010000000000000515BI0100001126 | 994.28 | Sqm |
|---|
| 16 | 11 | 50mm thick Cement concrete well mixed with cement mortar (1:2:4) laid in position complete excluding curing with aggregate size upto 12mm HB. | BI01010001010000000000000515BI0100001127 | 1079 | Sqm |
|---|
| 17 | 12 | For construction of culverts, S/F of RCC Hume pipe of 450mm diameter in cement sand mortar 1:2 with proper gradient complete in all respect | BI01010001010000000000000515BI0100001128 | 42.5 | m |
|---|
| 18 | 13 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect for Black Cotton Soil for Corewall and Cutoff Trench | BI01010001010000000000000515BI0100001129 | 52.5 | Cum |
|---|
| 19 | 14 | Re- handling excavation earth (excluding rock) in trenches, plinth side of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering including cost of water including loading and un-loading wherever required with cost of dewatering wherever required. | BI01010001010000000000000515BI0100001131 | 52.5 | Cum |
|---|
| 20 | 15 | Transportation of Black Cotton Soil upto average 5 km lead considering shortest route including Loading, Unloading and Stacking for Corewall and Cutoff Trench | BI01010001010000000000000515BI0100001132 | 52.5 | Cum |
|---|
| 21 | 18 | Centering and shuttering (GKN 2020 item no. 93B) | BI01010001010000000000000515BI0100001135 | 143.5 | Sqm |
|---|
| 22 | 19 | display Board (including painting, writing and installation on site) | BI01010001010000000000000515BI0100001136 | 1 | Nos |
|---|