National Highways and Infrastructure Development Corporation Limited-NHIDCL has published Ae For Improvement And Widening To Two Lane With Paved Shoulder Of Kailashahar - Khowai Section Of Nh-208 In The State Of Tripura On Epc Mode - ( Package-I , Ii , Iii , Iv And V ). Submission Date for this Tender is 25-01-2021. Highway Construction Tenders in Tripura Tripura. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 11-Jan-2021 | Reply to Pre Bid Queries | Other | 25-01-2021 |
2 | 20-Jan-2021 | Corrigendum No. 2 | Other | 25-01-2021 |
Name of Work: Authority’s Engineer for “Improvement and Widening to two lane with paved shoulder of Kailashahar - Khowai section of NH-208 in the state of Tripura on Engineering, Procurement & Construction (EPC) mode - starting near Kirtanthali (near Kailashahar town) at km 21.100 and ending near Ganki in Khowai district at km 101.300 (Package-I, II, III, IV & V) under JICA ODA loan Phase-IV on Engineering, Procurement, Construction (EPC) Mode | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Remuneration for Local Staff (inclusive of per Diem allowance) | |||
2 | 1.01 | Team Leader cum Sr. Highway Engineer 1 * [ 18(const.)+ 60(maint.) ]\n | 78 | Months | |
3 | 1.02 | Sr. Slope/ Safety Engineer\n ( 1 * 18(const.)\n\n | 18 | Months | |
4 | 1.03 | Sr. Contract Specialist 1 * [06(Const.)+ 04(maint.)]\n | 10 | Months | |
5 | 1.04 | Resident Engineer \n [2 * 18(Const.)]\n | 36 | Months | |
6 | 1.05 | Bridge/ Structural Engineer [2 * 18(Const.)]\n\n | 36 | Months | |
7 | 1.06 | Material Engineer (2*18(const) + 1*60 (maint.)\n | 96 | Months | |
8 | 1.07 | Sr. Quantity Surveyor [2 * 18(Const.)]\n | 36 | Months | |
9 | 1.08 | Environmental Expert/ safe guard Expert 2 *[ 18(const)+ 5(maint.)]\n\n | 41 | Months | |
10 | 2 | Remuneration for Sub- Professional | |||
11 | 2.01 | Quantity Surveyor [2 * 18(const)+ 1 * 60(maint.)]\n\n | 96 | Months | |
12 | 2.02 | CAD Engineer [2 * 18(Const.)]\n | 36 | Months | |
13 | 2.03 | Field Engineer [2 * 18(Const.)]\n | 36 | Months | |
14 | 2.04 | Surveyor [2 * 18(Const.)]\n\n | 36 | Months | |
15 | 2.05 | Lab Technician [2 * 18(const)+ 1 * 60(maint.)]\n\n | 96 | Months | |
16 | 3 | Support Staff (inclusive of per diem allowance) | |||
17 | 3.01 | Office Manager Cum Accountant [2 * 18(const)+ 1 * 60(maint.)]\n\n | 96 | Months | |
18 | 3.02 | Computer operator cum steno [2 * 18(const)+ 1 * 60(maint.)]\n\n | 96 | Months | |
19 | 3.03 | Office Boy [2 * 18(const)+ 1 * 60(maint.)]\n | 96 | Months | |
20 | 4 | Transportation (Fixed Costs) | |||
21 | 4.01 | Innova/or equivalent (not more than 3 years old)\n(1 nos x 18 months + 1 nos x 60 months)\n\n | 78 | Months | |
22 | 4.02 | Bolero or equivalent (not more than 3 years old)\n(2 nos x 18 months + 1 nos x 60months)\n\n | 96 | Months | |
23 | 4.03 | Duty Travel to Site(Fixed Costs): Professional and Sub-Professional Staff. The employer may require the key personnel to visit the Employer's Site Offices/Regional Office. The quoted amount against remuneration should include travel fare for 20 round trip to Employer's Head Office and 20 round trip to Employer's regional office\n\n | 1 | LS | |
24 | 5 | Office rent and Supplies, Utilities and Communication (Fixed Costs) e.g. Office Supplies, Drafting Supplies, Computer Running Costs and Domestic and\nInternational Communication\n\n | |||
25 | 5.01 | During Construction Period (02 nos Offices) [2 * 18(Const.)]\n | 36 | Months | |
26 | 5.02 | During Defect Liability Period (01 nos) | 60 | Months | |
27 | 6 | Office Furniture and Equipment (Rental)Executive Table, Executive Chairs, Tables (for executive), Ordinary Chairs Type-I, Tables (for all other staff), Ordinary Chairs Type II (for all other staff), Steel Almirah, Visitors chairs/Conference room chairs, Tables for computers with 3 drawers, keyboard/mouse pull out trays, Printer desks, Side tables, Conference Table, Revolving Chairs for Computer Room/Drawing room, Telephone with PABX facilities, Photocopier, FAX, Computer PC (state of the art), LaserJet Printers, Binding Machine, Water\nCoolers and Software.\n | |||
28 | 6.01 | During Construction Period (02 nos Offices) [2 * 18(Const.)]\n | 369 | Months | |
29 | 6.02 | During Defect Liability Period (01 nos) | 60 | Months | |
30 | 7 | Rental cost towards Survey Equipment(GPS/Total station /Auto\nLevel/LIDAR) with semiskilled survey Party (4 persons) and one dedicated vehicle for Survey Party (inclusive salary, fuel operationand maintenance etc complete) with rods, flags and other sundries\n | 36 | Months | |
31 | 8 | Contigencies | 1 | Nos |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail