Operation And Comprehensive Maintenance Of Ems For T E Bldg At Rayya Jandiala Guru Majitha Ajnala And Comprehensive Maintenance Of Ems For Various Rented Buildings And Group Exchanges Under Sdca Goindwal Rayya Jandiala Guru Majitha , Ajnala-Risk Cost , Wet Servicing Of Existing 1 . 5Tr / 2Tr Window / Split Ac Unit I / C Removing , Cleaning All Components And Filters , Dedusting By High Pressure Air Blower , Washing Condenser , Evaporator I / C Chemical Cleaning ( If Required ) , Refixing , Tightening Electrical Connections , Testing Of Ac Unit , Recording All Parameters In Service Report Etc As Reqd . , Providing And Charging Of R-22 Refrigerant Gas Including Carrying Out Leak Testing Of 1 . 5Tr Split / Wac Ac Units With Nitrogen Gas Including Dismantling Of Machine , Flushing The System , Brazing / Flaring The Leak Points , Vacumising , Purging And Making The System Leak Proof I / C Transportation Of Nitrogen Cylinder , Brazing Kit & Vacuum Pump , Supplying & Charging Of R22 Refrigerant Gas At Site , Reinstallation , Testing & Commissioning Complete Etc As Required . , 1 . 5 / 2 . 0 Tr , Replacement Of Following Capacity Of Existing Old Defective Compressor With New Sealed Compressor I / C Dismantling Of Faulty Compressor , Cutting Refrigerant Piping , Brazing & Making Necessary Addition / Alteration I / C Proper Mounting On Base Plate , Connection Of Suction And Discharge Lines , Leak Test & Charging Refrigerant I / C Testing Etc As Reqd . ( M / S Emerson / Tecumseh / Ss Make ) ( Note- The Firm Shall Submit Test Certificate Or Documentary Proof Towards Purchase Of New / Oem Factory Repaired Compressor . ) The Defective Compressor Shall Be The Property Of Agency & Firm Should Consider Suitable Price Rebate For The Same While Quoting . The Material Under Replacement Shall Be Similar To Existing Defective Material Or As Per Product Directory ) , 1 . 5 Tr , Replacement Of Following Material For Repairing & Attending Break Down Complaints Of 1 . 5 Tr Wac / Sac Units I / C Dismantling , Connection , Fixing & Testing Etc As Required . ( Note- The Defective Material Shall Be The Property Of Agency & Firm Should Consider Suitable Price Rebate For The Same While Quoting . The Material Under Replacement Shall Be Similar To Existing Defective Material Or As Per Product Directory . , Starting Capacitor ( Metal Body ) Of Rating Suitable For 1 . 5 / 2 . 0 Tr ( 80 / 100 Mfd ) ( M / S Epcos / Asian / Ss Make ) , Running Capacitor ( Metal Body ) Of Rating Suitable For 1 . 5 / 2 . 0 Tr ( M / S Epcos / Asian / Ss Make ) , Repairing Of Control Card Pcb Existing 1 . 5 / 2 . 0Tr Split Ac Units , Condenser Fan Blade ( Pvc / Frp ) , Condensor Coil , Replacement Of Control Card Pcb Suitable For 1 . 5Tr Split Ac Units , Blower Fan Motor For Idu Of Split Ac Unit ( M / S Aue / Marathon Ge / National / Diamond / Ss Make ) , Thermostat ( M / S Danfoss / Indfoss / Arvind / Ss Make , Washable Nylon Air Filter , Replacement / Rewinding Of Existing Condenser Motor Of 1 . 5 / 2 Tr Split / Window Ac Unit From Workshop Complete With Reinstallation , Testing Etc As Required , 3 Core Flexible Copper Cable 2 . 5 Sq Mm , Sitc Of Photo Electric Type Smoke Detector Complete With Detector Base Etc As Reqd And As Per Bsnl Specifications , Sitc Of Electro Pneumatic Type Dual Action ( Heat-Cum-Rate Of Rise In Temperature ) Heat Detector Complete With Detector Base Etc As Reqd And As Per Bsnl Specifications . , Providing Repairs To The Existing Microprocessor Based Fire Detection And Fire Alarm Panel I / C Replacement Of Transformer , Control Cards , Pcb I / C Making Minor Repairs To Make The Panel Fully Functional As Per The Directions Of The Engineer In Charge . , Replacement Of Following Ampere Hour Capacity Sealed Maintenance Free Battery I / C Making Connections , Testing And Commissioning Etc Comp . As Reqd Complete With Dismantling Of Old Defective Batteries . ( Note:The Old Dismantled Battery Shall Be The Property Of The Agency . ) , 12V-7Ah , 12V- 26Ah , Refilling Of Existing 4 . 5 Kg Co2 In The Existing 4 . 5 Kg Co2 Type Cylinder Including Transportation To The Filling Facility And Back To Concerned Te Bldg . Including Testing And Commissioning Complete Etc As Required . , Supplying And Fixing Following Items In The Existing 4 . 5 Kg Co2 Fire Extinguishers I / C Testing And Commissioning Etc As Reqd . , Horns With Hose Pipe , Topping Up Of Transformer Oil With Dielectric Strength More Than 40 Kv In The Existing Transformer / Ocb Etc . Comp . As Reqd . , Providing And Fixing Following Rating And Breaking Capacity And Pole Mccb With Thermomagnetic Release And Terminal Spreaders / Change Over Switch In Existing Cubicle Panel Board Including Drilling Holes In The Cubicle Panel Making Connections Etc Comp . As Reqd . , 200 / 250 A , 65 Ka , Fpmccb , 250 Amp . Fp Change Over Switch , Providing And Fixing Following Components In The Existing Capacitor Panel Suitable I / C Making Connections , Testing And Commissioning Etc Comp . As Reqd . , 5Kvar Heavy Duty Cylindrical Capacitor Suitable For Linear Load , 10Kvar Heavy Duty Cylindrical Capacitor Suitable For Linear Load , Plugging The Leakage Of The Existing 200 Kva Transformer By Providing Suitable Size Of Gasket Etc . Complete As Per Requirement At Site .