| 1 | 1 | SUPPLY PART | | | |
|---|
| 2 | 1.1 | Deluge valve rectification and modification work | | | |
|---|
| 3 | 1.11 | Supply the Defective deluge trim fittings for individual deluge valve as well as supply the trim fittings for up gradation of the deluge system. (See the supply specification) | | 20 | Set |
|---|
| 4 | 1.12 | Supply of Electrical & manually operated Butterfly valve (100 mm dia).(See the supply specification) | | 18 | Set |
|---|
| 5 | 1.13 | Supply of Electrical & manually operated Butterfly valve (80 mm dia). (See the supply specification) | | 2 | Set |
|---|
| 6 | 1.14 | Supply of Complete Deluge valve Trim fittings. (See the supply specification) | | 5 | Set |
|---|
| 7 | 1.15 | Supply of outdoor type Pressure Switch withisolation valve with all fittings acceries. (See the supply specification) | | 60 | Set |
|---|
| 8 | 1.16 | Supply of outdoor type Pressure gauge with valve with all fittings acceries. (See the supply specification) | | 40 | Set |
|---|
| 9 | 1.17 | Supply of primer & paint for two coat painting of Sprinkler and detection pipe line. (See the supply specification) | | 1 | lot |
|---|
| 10 | 1.18 | Supply of diffective Quartzoid bulb. (tentive qty) (See the supply specification Page 5 of ). | | 40 | Pcs |
|---|
| 11 | 1.19 | Supply of defective or missing Spray nozzle. (See the supply specification Page 6 of ). | | 40 | Pcs |
|---|
| 12 | 1.2 | Supply of PLC (Including HMI display) control panel to control & monitor all 20 nos Deluge valve with spare of two nos. As well as dispalying and control two nos reservior water label. | | 1 | Pcs |
|---|
| 13 | 1.21 | Supply of PLC control with HMI display to control all 20 nos active deluge valve 2 nos spare Deluge valve. | | 1 | Pcs |
|---|
| 14 | 1.22 | Supply of Power and signal cable between deluge valve & DV control panel. Between MCC panel to DV control panel. | | 1 | lot |
|---|
| 15 | 1.23 | Supply of Junction and control BOX near Deluge valve. | | 20 | lot |
|---|
| 16 | 1.24 | Supply of MS PIPE 80NB (HEAVY GRADE) use for bypass network. | | 18 | Mtr |
|---|
| 17 | 1.25 | Supply of MS PIPE 100NB (HEAVY GRADE) use for bypass network. | | 300 | Mtr |
|---|
| 18 | 1.26 | Supply of the small part gate valve use in deluge network (40 nos valve) | | 1 | lot |
|---|
| 19 | 1.27 | Supply strainer in sprinkler header network with isolation Butterfly valve. | | 2 | nos |
|---|
| 20 | 1.28 | Reservior automation project. | | | |
|---|
| 21 | 1.29 | Supply of Label transmitter switch with controller for reservoir automation.\n\n | | 2 | nos |
|---|
| 22 | 1.3 | Supply of 7 x 1.5 sqmm armoured copper cable from reservoir filling pump room to reservoir. | | 2000 | Mtr |
|---|
| 23 | 1.31 | Supply of Interconnection of label control panel to MCC panel & DV control panel. | | 200 | Mtr |
|---|
| 24 | 1.32 | Supply of electrical component for existing MCC panel up gradation for reservoir filling automation. | | 1 | lot |
|---|
| 25 | 1.33 | Fire Hydrant network and equipment upgradation | | | |
|---|
| 26 | 1.34 | Supply of defective part of existing of hose reel drum. | | 10 | nos |
|---|
| 27 | 1.35 | FRP hose box supply for outdoor area. | | 10 | nos |
|---|
| 28 | 1.36 | Supply of deffective part of existing Hydrant valve. | | 1 | lot |
|---|
| 29 | 1.37 | Supply all diffective part of isolation isolation valve to repairing & maintains. | | 1 | lot |
|---|
| 30 | 1.38 | Supply of primer & PO red paints outdoor yard sprinkler & hydrant pipe network only surrounding plant area. \n \n\n\n\n\n | | 1 | lot |
|---|
| 31 | 2 | SERVICE PART | | | |
|---|
| 32 | 2.1 | Deluge valve rectification and modification works | | | |
|---|
| 33 | 2.11 | Deleuge valve with all deluge trim equipment overhauling work with small diffective part supply. | | 20 | Set |
|---|
| 34 | 2.12 | Electrical & manually operated Butterfly valve newlly installed at new bypass valve. (100 mm dia) | | 18 | Set |
|---|
| 35 | 2.13 | Electrical & manually operated Butterfly valve newlly installed at new bypass valve. (80 mm dia) | | 2 | Set |
|---|
| 36 | 2.14 | Deleuge valve Trim fittings supply and installation. | | 5 | Set |
|---|
| 37 | 2.15 | Pressure Switch with valve & fittings supply and installation. | | 60 | Set |
|---|
| 38 | 2.16 | Pressure gauge with valve supply and installation. | | 40 | Set |
|---|
| 39 | 2.17 | Sprinkler and detection pipe line rectification with painting work with supply of paint pipe and fittings. | | 20 | lot |
|---|
| 40 | 2.18 | Supply and installed of diffective Quartzoid bulb. (tentive qty) | | 40 | Pcs |
|---|
| 41 | 2.19 | Supply and installed of Spray nozzle. | | 40 | Pcs |
|---|
| 42 | 2.2 | Deluge valve control & monitoring panel for 20 nos active deluge valve 2 nos spare Deluge valve. Reservior label indication & Panel for bypass control 20 nos active deluge valve 2 nos spare Deluge valve. Reservior label indication. | | 1 | Pcs |
|---|
| 43 | 2.21 | Panel for bypass control 20 nos active deluge valve 2 nos spare Deluge valve. Reservior label indication. | | 1 | Pcs |
|---|
| 44 | 2.22 | Power and signal cable between deluge valve & DV control panel. Between MCC panel to DV control panel. | | 1 | lot |
|---|
| 45 | 2.23 | Junction and control BOX near Deluge valve | | 20 | lot |
|---|
| 46 | 2.24 | MS PIPE 80NB (HEAVY GRADE) use for bypass network. | | 18 | Mtr |
|---|
| 47 | 2.25 | MS PIPE 100NB (HEAVY GRADE) use for bypass network. | | 300 | Mtr |
|---|
| 48 | 2.26 | Overhauling the all gate in deluge network (40 nos valve) | | 1 | lot |
|---|
| 49 | 2.27 | Use strainer network with isolation Butterfly valve. | | 2 | nos |
|---|
| 50 | 2.28 | Reservior automation project | | | |
|---|
| 51 | 2.29 | Lebel transmitter switch with controller for reservior automation. | | 2 | nos |
|---|
| 52 | 2.3 | 7 x 1.5 mm2 armoued copper cable from reservior filling pump room to reservior. | | 2000 | Mtr |
|---|
| 53 | 2.31 | Interconnection of lebel control panel to MCC panel & DV control panel. | | 200 | Mtr |
|---|
| 54 | 2.32 | MCC panel upgradation for reservior filling automation. | | 1 | lot |
|---|
| 55 | 2.33 | Fire Hydrant network and equipment upgradation. | | | |
|---|
| 56 | 2.34 | Rectifiaction & repairing of hose reel drum. | | 10 | nos |
|---|
| 57 | 2.35 | FRP hose box supply for outdoor area. | | 10 | nos |
|---|
| 58 | 2.36 | Hydrant valve repairing & rectification | | 1 | lot |
|---|
| 59 | 2.37 | All isolation valve repairing & maintance. | | 1 | lot |
|---|
| 60 | 2.38 | All out door area pipe painting. | | 1 | lot |
|---|