}

Up Gradation Of Fire Fighting System Supply , Overhauling , Rectification And Modification Work Of Deluge Valve , Automation Of Water Reservoir , Up Gradation Of Fire Hydrant Network And Equipment Of Dikrong Power House , Ranganadi He Plant , Neepco, Dikrong Power House, Hoz, Papumpare, Ar. Pradesh-Arunachal Pradesh

North Eastern Electric Power Corporation Limited-NEEPCO has published Up Gradation Of Fire Fighting System Supply , Overhauling , Rectification And Modification Work Of Deluge Valve , Automation Of Water Reservoir , Up Gradation Of Fire Hydrant Network And Equipment Of Dikrong Power House , Ranganadi He Plant , Neepco. Submission Date for this Tender is 20-01-2021. Fire Fighting Consumable Tenders in Dikrong Power House, Hoz, Papumpare, Ar. Pradesh Arunachal Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

26177877
Corrigendum : Up Gradation Of Fire Fighting System Supply , Overhauling , Rectification And Modification Work Of Deluge Valve , Automation Of Water Reservoir , Up Gradation Of Fire Hydrant Network And Equipment Of Dikrong Power House , Ranganadi He Plant , Neepco
Open Tender
Indian
Arunachal Pradesh
Dikrong Power House, Hoz, Papumpare, Ar. Pradesh
20-01-2021

Tender Details

Up Gradation Of Fire Fighting System Supply , Overhauling , Rectification And Modification Work Of Deluge Valve , Automation Of Water Reservoir , Up Gradation Of Fire Hydrant Network And Equipment Of Dikrong Power House , Ranganadi He Plant , Neepco , Arunachal Pradesh

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 05-Jan-2021 Corrigendum No. 01 dtd. 05.01.2021 Date 20-01-2021

Key Value

Document Fees
INR 2360 /-
EMD
INR 250000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: Supply, Overhauling, Rectification & Modification Work of Deluge Valve, Automation of Water Reservoir, Up gradation of Fire Hydrant Network & Equipments of Dikrong Power House, Ranganadi H.E. Plant, Dist Lower Subansiri, Arunachal Pradesh
Sl. No. Item Description Item Code / Make HSN No. Quantity Units
1 1 SUPPLY PART
2 1.1 Deluge valve rectification and modification work
3 1.11 Supply the Defective deluge trim fittings for individual deluge valve as well as supply the trim fittings for up gradation of the deluge system. (See the supply specification) 20 Set
4 1.12 Supply of Electrical & manually operated Butterfly valve (100 mm dia).(See the supply specification) 18 Set
5 1.13 Supply of Electrical & manually operated Butterfly valve (80 mm dia). (See the supply specification) 2 Set
6 1.14 Supply of Complete Deluge valve Trim fittings. (See the supply specification) 5 Set
7 1.15 Supply of outdoor type Pressure Switch withisolation valve with all fittings acceries. (See the supply specification) 60 Set
8 1.16 Supply of outdoor type Pressure gauge with valve with all fittings acceries. (See the supply specification) 40 Set
9 1.17 Supply of primer & paint for two coat painting of Sprinkler and detection pipe line. (See the supply specification) 1 lot
10 1.18 Supply of diffective Quartzoid bulb. (tentive qty) (See the supply specification Page 5 of ). 40 Pcs
11 1.19 Supply of defective or missing Spray nozzle. (See the supply specification Page 6 of ). 40 Pcs
12 1.2 Supply of PLC (Including HMI display) control panel to control & monitor all 20 nos Deluge valve with spare of two nos. As well as dispalying and control two nos reservior water label. 1 Pcs
13 1.21 Supply of PLC control with HMI display to control all 20 nos active deluge valve 2 nos spare Deluge valve. 1 Pcs
14 1.22 Supply of Power and signal cable between deluge valve & DV control panel. Between MCC panel to DV control panel. 1 lot
15 1.23 Supply of Junction and control BOX near Deluge valve. 20 lot
16 1.24 Supply of MS PIPE 80NB (HEAVY GRADE) use for bypass network. 18 Mtr
17 1.25 Supply of MS PIPE 100NB (HEAVY GRADE) use for bypass network. 300 Mtr
18 1.26 Supply of the small part gate valve use in deluge network (40 nos valve) 1 lot
19 1.27 Supply strainer in sprinkler header network with isolation Butterfly valve. 2 nos
20 1.28 Reservior automation project.
21 1.29 Supply of Label transmitter switch with controller for reservoir automation.\n\n 2 nos
22 1.3 Supply of 7 x 1.5 sqmm armoured copper cable from reservoir filling pump room to reservoir. 2000 Mtr
23 1.31 Supply of Interconnection of label control panel to MCC panel & DV control panel. 200 Mtr
24 1.32 Supply of electrical component for existing MCC panel up gradation for reservoir filling automation. 1 lot
25 1.33 Fire Hydrant network and equipment upgradation
26 1.34 Supply of defective part of existing of hose reel drum. 10 nos
27 1.35 FRP hose box supply for outdoor area. 10 nos
28 1.36 Supply of deffective part of existing Hydrant valve. 1 lot
29 1.37 Supply all diffective part of isolation isolation valve to repairing & maintains. 1 lot
30 1.38 Supply of primer & PO red paints outdoor yard sprinkler & hydrant pipe network only surrounding plant area. \n \n\n\n\n\n 1 lot
31 2 SERVICE PART
32 2.1 Deluge valve rectification and modification works
33 2.11 Deleuge valve with all deluge trim equipment overhauling work with small diffective part supply. 20 Set
34 2.12 Electrical & manually operated Butterfly valve newlly installed at new bypass valve. (100 mm dia) 18 Set
35 2.13 Electrical & manually operated Butterfly valve newlly installed at new bypass valve. (80 mm dia) 2 Set
36 2.14 Deleuge valve Trim fittings supply and installation. 5 Set
37 2.15 Pressure Switch with valve & fittings supply and installation. 60 Set
38 2.16 Pressure gauge with valve supply and installation. 40 Set
39 2.17 Sprinkler and detection pipe line rectification with painting work with supply of paint pipe and fittings. 20 lot
40 2.18 Supply and installed of diffective Quartzoid bulb. (tentive qty) 40 Pcs
41 2.19 Supply and installed of Spray nozzle. 40 Pcs
42 2.2 Deluge valve control & monitoring panel for 20 nos active deluge valve 2 nos spare Deluge valve. Reservior label indication & Panel for bypass control 20 nos active deluge valve 2 nos spare Deluge valve. Reservior label indication. 1 Pcs
43 2.21 Panel for bypass control 20 nos active deluge valve 2 nos spare Deluge valve. Reservior label indication. 1 Pcs
44 2.22 Power and signal cable between deluge valve & DV control panel. Between MCC panel to DV control panel. 1 lot
45 2.23 Junction and control BOX near Deluge valve 20 lot
46 2.24 MS PIPE 80NB (HEAVY GRADE) use for bypass network. 18 Mtr
47 2.25 MS PIPE 100NB (HEAVY GRADE) use for bypass network. 300 Mtr
48 2.26 Overhauling the all gate in deluge network (40 nos valve) 1 lot
49 2.27 Use strainer network with isolation Butterfly valve. 2 nos
50 2.28 Reservior automation project
51 2.29 Lebel transmitter switch with controller for reservior automation. 2 nos
52 2.3 7 x 1.5 mm2 armoued copper cable from reservior filling pump room to reservior. 2000 Mtr
53 2.31 Interconnection of lebel control panel to MCC panel & DV control panel. 200 Mtr
54 2.32 MCC panel upgradation for reservior filling automation. 1 lot
55 2.33 Fire Hydrant network and equipment upgradation.
56 2.34 Rectifiaction & repairing of hose reel drum. 10 nos
57 2.35 FRP hose box supply for outdoor area. 10 nos
58 2.36 Hydrant valve repairing & rectification 1 lot
59 2.37 All isolation valve repairing & maintance. 1 lot
60 2.38 All out door area pipe painting. 1 lot
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail