

Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 30-Dec-202 | Tender due date extended | Date | 15-01-2021 |
2 | 18-Jan-202 | TECHNICAL CORRIGENDUM AND DUE DATE EXTENSION | Date | 02-02-2021 |
Name of Work: Fire, Acoustic & Thermal (FAT) insulation for Y-12706 & Y-12707 of Project P15B (For indigenous bidders only) | |||||
---|---|---|---|---|---|
Tender Sl. No. | Item Description (Material No.) | Yard No | Total Quantity | Units | |
1 | 1 | A - 60 FAT INSULATION - 50 MM AS PER NCD 1430 ISSUE 1 JULY 2020 AND TSP\nNO. P15 B/DF/TSP/FAT(150000000000060345) | 5000 | M2 | |
2 | 2 | A - 60 FAT INSULATION - 25 MM AS PER NCD 1430 ISSUE 1 JULY 2020 AND TSP NO. P15 B/DF/TSP/FAT(150000000000060346) | 3500 | M2 | |
3 | 3 | SET OF PIN WITH WASHER AND CAP FOR INSTALLATION ON PLAIN AREA -8000 M2 OF BULKHEADS AND DECK HEADS AS PER NCD 1430 ISSUE 1 JULY 2020 AND TSP NO. P15 B/DF/TSP/FAT(150000000000060347) | 1 | SET | |
4 | 4 | SET OF PINS WITH WASHER AND CAP FOR INSTALLATION ON STIFFENER AREA (STIFFENERS-11958 M) OF BULKHEADS AND DECK HEADS AS PER NCD 1430 ISSUE 1 JULY 2020 AND TSP NO. P15 B/DF/TSP/FAT(150000000000060348) | 1 | SET | |
5 | 5 | DOCUMENTS FOR A - 60 FAT INSULATION AS PER NCD 1430 ISSUE 1 JULY 2020 AND TSP NO. P15 B/DF/TSP/FAT(150000000000060349) | 3 | SET | |
6 | 6 | A - 60 FAT INSULATION - 50 MM AS PER NCD 1430 ISSUE 1 JULY 2020 AND TSP NO. P15 B/DF/TSP/FAT(150000000000060345) | 5000 | M2 | |
7 | 7 | A - 60 FAT INSULATION - 25 MM AS PER NCD 1430 ISSUE 1 JULY 2020 AND TSP NO. P15 B/DF/TSP/FAT(150000000000060346) | 3500 | M2 | |
8 | 8 | SET OF PIN WITH WASHER AND CAP FOR INSTALLATION ON PLAIN AREA -8000 M2 OF BULKHEADS AND DECK HEADS AS PER NCD 1430 ISSUE 1 JULY 2020 AND TSP NO. P15 B/DF/TSP/FAT(150000000000060347) | 1 | SET | |
9 | 9 | SET OF PINS WITH WASHER AND CAP FOR INSTALLATION ON STIFFENER AREA (STIFFENERS-11958 M) OF BULKHEADS AND DECK HEADS AS PER NCD 1430 ISSUE 1 JULY 2020 AND TSP NO. P15 B/DF/TSP/FAT JULY 2020 AND TSP NO. P15 B/DF/TSP/FAT(150000000000060348) | 1 | SET | |
10 | 10 | DOCUMENTS FOR A - 60 FAT INSULATION AS PER NCD 1430 ISSUE 1 JULY 2020 AND TSP NO. P15 B/DF/TSP/FAT(150000000000060349) | 3 | SET | |
11 | 11 | A - 60 FAT INSULATION - 50 MM AS PER NCD 1430 ISSUE 1 JULY 2020 AND TSP NO. P15 B/DF/TSP/FAT(150000000000060345) | 5000 | M2 | |
12 | 12 | A - 60 FAT INSULATION - 25 MM AS PER NCD 1430 ISSUE 1 JULY 2020 AND TSP NO. P15 B/DF/TSP/FAT(150000000000060346) | 3500 | M2 | |
13 | 13 | SET OF PIN WITH WASHER AND CAP FOR INSTALLATION ON PLAIN AREA -8000 M2 OF BULKHEADS AND DECK HEADS AS PER NCD 1430 ISSUE 1 JULY 2020 AND TSP NO. P15 B/DF/TSP/FAT(150000000000060347) | 1 | SET | |
14 | 14 | SET OF PINS WITH WASHER AND CAP FOR INSTALLATION ON STIFFENER AREA (STIFFENERS-11958 M) OF BULKHEADS AND DECK HEADS AS PER NCD 1430 ISSUE 1 JULY 2020 AND TSP NO. P15 B/DF/TSP/FAT(150000000000060348) | 1 | SET | |
15 | 15 | DOCUMENTS FOR A - 60 FAT INSULATION AS PER NCD 1430 ISSUE 1 JULY 2020 AND TSP NO. P15 B/DF/TSP/FAT(150000000000060349) | 3 | SET | |
16 | 16 | A - 60 FAT INSULATION - 50 MM AS PER NCD 1430 ISSUE 1 JULY 2020 AND TSP NO. P15 B/DF/TSP/FAT(150000000000060345) | 5000 | M2 | |
17 | 17 | A - 60 FAT INSULATION - 25 MM AS PER NCD 1430 ISSUE 1 JULY 2020 AND TSP NO. P15 B/DF/TSP/FAT(150000000000060346) | 3500 | M2 | |
18 | 18 | SET OF PIN WITH WASHER AND CAP FOR INSTALLATION ON PLAIN AREA -8000 M2 OF BULKHEADS AND DECK HEADS AS PER NCD 1430 ISSUE 1 JULY 2020 AND TSP NO. P15 B/DF/TSP/FAT NO. P15 B/DF/TSP/FAT(150000000000060347) | 1 | SET | |
19 | 19 | SET OF PINS WITH WASHER AND CAP FOR INSTALLATION ON STIFFENER AREA (STIFFENERS-11958 M) OF BULKHEADS AND DECK HEADS AS PER NCD 1430 ISSUE 1 JULY 2020 AND TSP NO. P15 B/DF/TSP/FAT(150000000000060348) | 1 | SET | |
20 | 20 | DOCUMENTS FOR A - 60 FAT INSULATION AS PER NCD 1430 ISSUE 1 JULY 2020 AND TSP NO. P15 B/DF/TSP/FAT(150000000000060349) | 3 | SET |
Copyright © 2021 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail