Tamil Nadu Generation And Distribution Corporation Limited-TANGEDCO has published Works Contract For Loading/Unloading And Handling Of Materials (Transporting If Necessary) At Central Stores/Mettur Dam/Medc. Submission Date for this Tender is 25-11-2020. Bags Supply Tenders in Mettur EDC Tamil Nadu. Bidders can get complete Tender details and download the document.
Name of Work: Works Contract for Loading/Unloading and Handling of Materials (Transporting if necessary) at Central Stores/Mettur dam/MEDC | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity (Approx) | Units | |
1 | 1 | Loading /Unloading of Transformers from Lorry to the Stores yard and stacking various capacities up to 40 KVA | 70 | Nos | |
2 | 2 | Loading /Unloading of Transformers from Lorry to the Stores yard and stacking 63 KVA to 200 KVA | 800 | Nos | |
3 | 3 | Loading /Unloading of Transformers from Lorry to the Stores yard and stacking above 200 KVA | 70 | Nos | |
4 | 4 | Loading /Unloading of Metering Sets from Lorry to the Stores Yard and Stacking Various capacities in 11KV and 22 KV | 50 | Nos | |
5 | 5 | Unloading of Conductor drum from Lorry, leading and stracking yard | 500 | Drum | |
6 | 6 | Leading of Conductor drum to Lorry leading point and loading | 500 | Drum | |
7 | 7 | Uncoiling the Conductor drum, bundling and transporting to weighing scalem weighing and transporting to godown and stacking | 350 | KM | |
8 | 8 | Loading/Unloading of RS Joists Materials | 50 | MT | |
9 | 9 | Loading/Unloading of Iron & Steel Materials | 25 | MT | |
10 | 10 | Lifting, Leading to Weighing Scale, Weighing & Stacking of Iron & Steel Materials | 25 | MT | |
11 | 11 | Loading/Unloading of Line Materials ( Structure Materials, X-Arm, Stay Set, G.I Wire, Stay Wire, Earth Pipe, Bolt&Nut, G.I Pin ) | 1200 | MT | |
12 | 12 | Loading/Unloading of 1phase, 3phase Meters | 1000 | Box | |
13 | 13 | Loading/Unloading of HT Metering Box , LTCT Metering Box & Battery Charger | 100 | Nos | |
14 | 14 | Loading /Unloading of chokes, LTCT's, LT LAS, Fuse Unit, Hut Service Kit and Other Items with Individual Packing | 500 | Each | |
15 | 15 | Loading/Unloading of L.T Pin Insulators, Guy Shackle, L.T Shackle and verification | 150000 | Nos | |
16 | 16 | Loading/Unloading of Crates with 11/22/33 KV Sisc, 11/22/33 KV Pin Insulators verifying and stacking | 8000 | Crate | |
17 | 17 | Loading/Unloading & Stacking of Oil drums with Oil | 300 | Drum | |
18 | 18 | Loading/Unloading & Stacking of Paint Container with Paint | 500 | Container | |
19 | 19 | Loading/Unloading of L.T Open Type fuse unit 11/22 KV H.G Fuse Set | 1500 | Each | |
20 | 20 | Unpacking,Verifying, Counting and repacking, Stacking of Meters, LAS, Chokes, Fuse Unit and Others | 80000 | Each | |
21 | 21 | Unpacking, Verifying, Counting and repacking, Stacking of Insulators, G.I Pin, Hardware and Others | 35000 | Nos | |
22 | 22 | Loading/Unloading of all size of Tyres, LT/HT, Trivector Meters, Inoor C.T and Stacking | 500 | Each | |
23 | 23 | Lifting, Leading to Weighing Scale, Weighing , Releading to Stacking Point and Stacking of all Scrap Materials including Copper, Aluminium etc | 200 | MT | |
24 | 24 | Unloading of all kinds of Scrap from Lorry, Weighing and Stacking | 200 | MT | |
25 | 25 | Loading of all kinds of Scraps to Lorry | 400 | MT | |
26 | 26 | Unpacking, Verifying and Repacking, Stacking of M.S Bolt & nut and Others | 150 | MT | |
27 | 27 | Uncoiling, Measuring, Recoiling and Stacking of PVC Cable 2.65 Sq.mm & 6.00 Sq.mm,50 Sq.mm and Others | 50 | Coil | |
28 | 28 | Uncoiling, Measuring, Recoiling and Stacking of PVC Cable 50,95,120 Sq.mm and others | 50 | Coil | |
29 | 29 | Loading/Unloading & Stacking of PVC Cable - 2.65 Sq.mm, 6.00 Sq.mm and 25 Sq.mm | 30 | Coil | |
30 | 30 | Loading/Unloading & Stacking of PVC Cable - 50 Sq.mm, 95 Sq.mm and 120 Sq.mm | 30 | Coil | |
31 | 31 | Loading/Unloading & Stacking of 11 KV/22 KV AB Switch Double Pole | 500 | Set | |
32 | 32 | Loading/Unloading of Stationary Items at Transport Lorry Bundles upto 30 Kgs | 15 | Bundle | |
33 | 33 | Loading/Unloading of Stationary Items at Transport Lorry Bundles from 30 to 50 Kgs | 20 | Bundle | |
34 | 34 | Loading/Unloading of Stationary Items at Transport LorryBundles above 50 Kgs | 15 | Bundle | |
35 | 35 | Unpacking, Verifying , Recpacking, Stacking of Stationary Items at Stores Bundles Upto 30 Kgs | 20 | Bundle | |
36 | 36 | Unpacking, Verifying , Recpacking, Stacking of Stationary Items at Stores Bundles from 30 to 50 Kgs | 20 | Bundle | |
37 | 37 | Unpacking, Verifying , Recpacking, Stacking of Stationary Items at Stores Bundles above Kgs | 20 | Bundle | |
38 | 38 | Loading/Unloading of Empty Drums - Wooden Drum | 25 | Each | |
39 | 39 | Loading/Unloading of Empty Drums - Steel Drum | 15 | Each | |
40 | 40 | Loading/Unloading of Shunt Capacitor | 16 | Nos | |
41 | 41 | Unpacking of Gunny Bags,Verifying & Stacking of SEC Wires, SEA Alu. Wire upto 30 Kgs | 20 | KG | |
42 | 42 | Unpacking of Gunny Bags,Verifying & Stacking of TC Fuse Wires | 20 | KG | |
43 | 43 | Unpacking, Counting, Verifying and Stacking of numbered Lead ( 100 Nos/Shell ) | 500 | Shells | |
44 | 44 | Loading/Unloading & Stacking of Cables in Wooden Drums | 100 | Each | |
45 | 45 | Loading/Unloading & Stacking of Cables in Steel Drums | 35 | Each | |
46 | 46 | Loading/Unloading of 6 Way Pillar box | 30 | Each | |
47 | 47 | Loading/Unloading of 4 Way Pillar box | 35 | Each | |
48 | 48 | Loading/Unloading of Mini Pillar box | 50 | Each | |
49 | 49 | Loading/Unloading of FRB Pillar box | 30 | Each | |
50 | 50 | Loading of V Trough | 500 | Each | |
51 | 51 | Unloading and Stacking of V Trough | 500 | Each | |
52 | 52 | Loading/Unloading & Stacking of Straight Joint/End Termination Kit | 15 | Each | |
53 | 53 | Loading/Unloading & Stacking of 3x400 Sq.mm UG Alu.Cable | 30 | Drum | |
54 | 54 | Loading/Unloading & Stacking of 4x240 Sq.mm UG Alu.Cable | 30 | Drum | |
55 | 55 | Loading/Unloading & Stacking of LT UG Cable 16 Sq.mm | 100 | Drum | |
56 | 56 | Loading/Unloading & Stacking of LT UG Cable 120 Sq.mm | 40 | Drum | |
57 | 57 | Loading/Unloading Outdoor CT/PT and Indoor CT/PT | 15 | Nos | |
58 | 58 | Leading, Weighing and Stacking of Transformer Oil Drums | 50 | Drum | |
59 | 59 | Loading/Unloading of Single Pole AB Switch Vertical Type Complete & 33 KV Centre Rotating Switch | 300 | Sets | |
60 | 60 | Loading/Unloading, Stacking GI Earth Pipe 40 mm 10' Long | 20 | MT | |
61 | 61 | Loading/Unloading , Stacking Batterry, Computer, Printer, UPS | 200 | Each | |
62 | 62 | Loading/Unloading, Stacking SMC Box & Pilfer Proof Box | 500 | Each | |
63 | 63 | Loading/Unloading, Stacking of 33 KV 1 x630 Sq.mm UG Alu.Cable | 30 | Drum | |
64 | 64 | Loading/Unloading, Stacking of Earth Rod 4' | 100 | Sets | |
65 | 65 | Loading/Unloading, Stacking of Earth Rod 10' | 50 | Each | |
66 | 66 | Crane charges for lifting the materials | 1 | Hour | |
67 | 67 | Hiring of vehicle for transporting for a load of 1MT 0-5KM | 1 | LS | |
68 | 68 | For transporting 6 to 20KM for additional KM | 1 | KM | |
69 | 69 | For transporting 21 to 50 KM for additional KM | 1 | km | |
70 | 70 | For transporting 51Km and above for additional KM | 1 | km | |
71 | 71 | Hiring of vehicle for transporting for a load of 2MT 0-5KM | 1 | LS | |
72 | 72 | For transporting 6 to 20KM for additional KM | 1 | KM | |
73 | 73 | For transporting 21 to 50 KM for additional KM | 1 | km | |
74 | 75 | For transporting 51Km and above for additional KM | 1 | km | |
75 | 76 | E.S.I. @3.25 % should be Entered by the Bidder | 1 | Percentage | |
76 | 77 | EPF 13% for labour charges | 1 | Percentage | |
77 | 78 | G.S.T. @18% should be Entered by the Bidder | 1 | Percentage |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail