| 1 | 1 | Labour for running & supervision of Head Works, WTP, Raw water & Clear water rising main, Clear Water Pump House & OGRs. | BI01010001010000000000000515BI0100001112 | | |
|---|
| 2 | 1.01 | For running the Raw water pumps for 12 to 16 hours at Raw water pump house at Jokadia, 135 HP x 1 no including watch and ward of the pump house requirement per day. | BI01010001010000000000000515BI0100001113 | 12 | Month |
|---|
| 3 | 1.02 | For running the 7 MLD water treatment plant for 12 to 16 hours with running of dozing pumps, flash mixture and back washing of filter bed etc all complete as per the directionof Engineer-in-charge at WTP Mundamal including watch and ward of water treatment plant. | BI01010001010000000000000515BI0100001114 | 12 | Month |
|---|
| 4 | 1.03 | For running of 2 nos of 69 HP pump for 12 to 16 hours at WTP at Mundamal for water supply to Vyasanagar municipality and running of 2 nos 37.5 HP pump for zone No.1 including watch and ward of the pump house. | BI01010001010000000000000515BI0100001115 | 12 | Month |
|---|
| 5 | 1.04 | For running clear water centrifugal pumps for 12 to 16 hours at the following 3 Zonal pump houses for water supply to Vysanagar Town inciuding watch and ward of the pump house. | BI01010001010000000000000515BI0100001116 | 12 | Month |
|---|
| 6 | 1.05 | For supervision of entire operation and maintenance work of Intake Well and 7 MLD capacity WTP, OGRs, ESR, Clear water pump houses, rising main and all minor maintenance works of the system. | BI01010001010000000000000515BI0100001117 | 12 | Month |
|---|
| 7 | 2 | Minor Maintenance works | BI01010001010000000000000515BI0100001118 | | |
|---|
| 8 | 2.01 | Supplying all materials, labour T&P etc for inspection of Raw water and clear water rising mains by engaging labourers including inspection of 31 nos of air valves, 30 nos of sluice valves & 16 nos of NRV etc replacement of defective air valves balls, change of gland packing of sluice valves wherever necessary, reporting of leakages of rising main to the concerned officials etc , sweeping office building, pump house, filter house, chemicals house and other annex building of WTP at Mundamal, Head works at Jokadia Premises, clear water pump houses etc at Mundamal, Dala, Dhabalagiri & Bhatia including cost of broomsticks and jhudis, removal of debris, bushes, floating materials, trees, wids etc which will create problem in operating valves and damage to intake well, head works during flood period in the River Kharasrota , maintenance of electrical system, providing bulb, fuse wire, flexible wire and minor electrical defects in different head work and pump houses including replacement of fused bulbs, fused kitkats, maintenance of premises of transformer, LT & HT lines etc., cost of material and labour for greasing and using gland in different head works, pump houses, intake well at Jokadia, WTP at Mundamal, UGR & ESR site at Mundamal, Dala, Dhabalagiri & Bhatia, Maintenance of arboriculture, grading, plantation, greeneries, watering to trees and lawn, cutting, cleaning roads etc including provision of flexible PVC pipes etc all complete as per the direction of Engineer-in-charge. | BI01010001010000000000000515BI0100001119 | 12 | Month |
|---|