| 1 | 1 | Dismantling & stacking of AAA conductor 80 sqmm | BI01010001010000000000000515BI0100001114 | 8.5 | Km |
|---|
| 2 | 2 | Dismantling & stacking of Pin/Shackle insulator with hardware | BI01010001010000000000000515BI0100001115 | 300 | Nos |
|---|
| 3 | 3 | Dismantling & stacking of MS bracket clamp and nut bolt | BI01010001010000000000000515BI0100001116 | 464 | Kg |
|---|
| 4 | 4 | Dismantling &stacking of 11mtr./13mtr tubular pole | BI01010001010000000000000515BI0100001117 | 30 | Nos |
|---|
| 5 | 5 | Supply and fabrication of MS bracket 65x65x6mm(20 nos x 0.8 mtr. x 02 nos.. x 5.8 kg) | BI01010001010000000000000515BI0100001118 | 186 | Kg |
|---|
| 6 | 6 | Supply and fabrication of MS Flat 50x6mm(20 nos x 0.84 Kg) | BI01010001010000000000000515BI0100001119 | 17 | Kg |
|---|
| 7 | 7 | Supply of stay set 5/8\" x 6\" long complete with all accessories & stay insulator 1.1 KV | BI01010001010000000000000515BI0100001120 | 6 | Nos |
|---|
| 8 | 8 | Supply of LT shackle insulator with hardware 1.1 KV | BI01010001010000000000000515BI0100001121 | 100 | Nos |
|---|
| 9 | 9 | Erection of 11 mtr./13 mtr. tubular pole | BI01010001010000000000000515BI0100001122 | 25 | Nos |
|---|
| 10 | 10 | Excavation of pole pit and stay pit size (0.65 x 0.65 x 1.8 mtr. x 20 nos) + (0.65 x 0.65 x 1.2 mtr x 05 nos) | BI01010001010000000000000515BI0100001123 | 17.745 | Cum |
|---|
| 11 | 11 | Concreating at pole and stay with mine gravel 1:4:8 | BI01010001010000000000000515BI0100001124 | 21.125 | Cum |
|---|
| 12 | 12 | Laying, strining and tensioning of AAA conductor 80 Sqmm | BI01010001010000000000000515BI0100001125 | 6 | Km |
|---|
| 13 | 13 | Erection of stay set complete | BI01010001010000000000000515BI0100001126 | 6 | Nos |
|---|
| 14 | 14 | Erection of fabricated MS bracket with clamp & nut bolt | BI01010001010000000000000515BI0100001127 | 650 | Kg |
|---|
| 15 | 15 | Supply of stay wire 7/12 SWG (05 nos x 15 mtr 299 Kg) | BI01010001010000000000000515BI0100001128 | 14.95 | Kg |
|---|
| 16 | 16 | Painting of steel tabular poles including removal of all dust with synthetic super enameled aluminium paint (One coat red oxide, two coat aluminium) | BI01010001010000000000000515BI0100001129 | 25 | Nos |
|---|
| 17 | 17 | Total impact of GST for the purpose of CTC | BI01010001010000000000000515BI0100001134 | 1 | Nos |
|---|