| 1 | 1 | Loading, carriage & unloading of following materials from centre store to work site and its stacking. Distance approx (0-35) kms. | BI01010001010000000000000515BI0100001112 | | |
|---|
| 2 | 2 | (A) Line Material. | | 45 | Qtl. |
|---|
| 3 | 3 | (B) PCC pole 8.5/9 Mtr long | | 130 | Nos. |
|---|
| 4 | 4 | (C) STP Pole 9/11 Mtr. long. | | 20 | Nos. |
|---|
| 5 | 5 | (D)- T/F 10/16/25/63 KVA | | 12 | Nos. |
|---|
| 6 | 6 | (E)ACSR Rabit/Dog /Racoon/weasel/ conductor | | 6000 | Mtr. |
|---|
| 7 | 7 | (F)ABC( 3x120/95/70/25/16) Sqmm. | | 157 | Mtr. |
|---|
| 8 | 8 | (G)11 KV XLPE Cable (3x35/70/120/185/240) | | 210 | Mtr. |
|---|
| 9 | 9 | (H) 11kv pilfer resistant metering cubical | | 3 | Nos. |
|---|
| 10 | 10 | (I)11 KV Pole mounted CT/PT | | 2 | Nos. |
|---|
| 11 | 11 | (J)RMU | | 2 | Nos. |
|---|
| 12 | 12 | (K)DP Box 3 Phase | | 20 | Nos. |
|---|
| 13 | 13 | Fabrication, erection of sub-station type double pole on 8.5 mtr long PCC/11 mtr. Long ST pole along with fixing of necessary hardware of doble pole alongwith necessery pin insulators as per RESPO specification and direction of E/I. | | 12 | Nos. |
|---|
| 14 | 14 | Dragging of ST/PCC pole to pit site, digging of pit erection and grouting (As per RESPO norms) of 11KV 9/11/8.5 mtr long ST/PCC pole with fixing of necessary items, such as V-type X-arm, F-bracket, 11KV Pin/Disc insulator, guarding angle(1.8 mm65x65x6) with nut & bolts its ramming as per RESSPO Specification. | | 12 | Nos. |
|---|
| 15 | 15 | Dragging of ST/PCC Pole from dump store to pit site, digging of pit erection & grouting (As per RESPO norms) of LT support suitable for laying of ABC line on 8.5mtr long PCC pole by providing of necessary eye hook/LT shackle insulator with clamps and its accessories etc. as per RESPO specification. Only Pole will be provided by the department. | | 20 | Nos. |
|---|
| 16 | 16 | Fabrication, erection T-Off pole single section pole along with T-Off channel clamp disc fitting & pin accessories, grouting in 1:4:8 cement sand and brick ballast as per RESPO specification. | | 12 | Nos. |
|---|
| 17 | 17 | Providing and fixing of 11 KV DO fuse set along with clamps & nut bolts on existing of double pole. | | 2 | Nos. |
|---|
| 18 | 18 | Providing and fixing of 11 KV TPMO along with clamps & nut bolts on existing of double pole. | | 2 | Nos. |
|---|
| 19 | 19 | Ordinary earthing by MS earth Rod 2500mm long as per RESPO Schedule. Only GI wire& Earth rod shall be supplied by the department. | | 20 | Nos. |
|---|
| 20 | 20 | Grouting and Nuzzling of stay set complete including fixing of necessary clamps. Accessories required including its grouting by civil material (Sand: brick ballast: cement). Only Stay wire shall be supplied by the Department. | | 39 | Nos. |
|---|
| 21 | 21 | Laying and sagging of 3 phase 3 wire 11 KV line on ACSR weasel/rabbit/Raccoon/Dog conductor as per RESPO specification and direction of E/I. | | 3.8 | CKT KM |
|---|
| 22 | 22 | Providing and fixing of guarding angle on existing 11 KV support with clamp and nut bolts. | | 12 | Nos. |
|---|
| 23 | 23 | Cradle guarding of HT line by GI wire. GI wire shall be supplied by the department. | | 12 | Span |
|---|
| 24 | 24 | Erection & commissioning of (3x120/95/70/25/16 Sq.mm) Aerial Bunched Conductor. | | 1.5 | KM |
|---|
| 25 | 25 | Laying of cable 11 KV XLPE cable (3x35/70/120/185/240) sqmm in pakka road by boring method laying cable as per RESPO specification & direction of E/I. | | 50 | Mtr. |
|---|
| 26 | 26 | Laying of cable 11 KV Through piping . | | 22 | Mtr. |
|---|
| 27 | 27 | Hoisting of 11 KV XLPE Cable will be passed through MS pipe of required size duly clamped with pole at the bottom, middle and top of the pole. | | 4 | Nos. |
|---|
| 28 | 28 | Supply and fixing of 11 KV Cable joining kit O/D and I/D. | | 6 | Nos. |
|---|
| 29 | 29 | Installation of 11 KV CT/PT on double pole connected with metering unit along with providing and fixing of all accessories such as S/S base, MS flat, clamps, nut and bolts its jumpering and commissioning. | | 5 | Nos. |
|---|
| 30 | 30 | Construction of brick masonry plinth suitable for Installation of 11 KV Pilfer metering cubical along with plastering. | | 4 | Job |
|---|
| 31 | 31 | Dragging of 11 KV Pilfer metering cubical inside the metering room, its installation and commissioning. | | 4 | Job |
|---|
| 32 | 32 | Fixing of 3 phase distribution box/kiosk on the LT poles including all clamps and material required for mounting connections and sealing. | | 10 | Nos. |
|---|
| 33 | 33 | Making section of 11 KV line by fixing of All necessaries accessories such as T-Off channel disc insulator with fitting pin insulator with pin along with sagging jumpering and binding etc only insulator shall be provided by the dept. | | 20 | Job. |
|---|
| 34 | 34 | Cutting and chopping of tree branches for clearance of HT/LT Line. After clearance line throughout pieces of tree branches of site. | | 780 | Nos. |
|---|
| 35 | 35 | Safe installation & energisation of 10/16/25/63 KVA T/F on double pole by providing and fixing of L-piece, Lugs making HT/LT connections and its commissioning. Only Transformer shall be supplied by the deppt. | | 12 | Nos. |
|---|
| 36 | 36 | Tax as payable time to time shall be paid by department. | BI01010001010000000000000515BI0100001124 | | |
|---|